Delivery Order FA301621D0006-FA301624F0207

Award Date 6/17/24
Potential Completion Date 8/16/24
Potential Value $60K
Ultimate Awardee
Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
San Antonio, TX 78234, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
5
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a firm fixed-price delivery order awarded by the Air Education and Training Command (AETC), a defense agency, to Belt Built Con-Cor JV, a minority-owned small disadvantaged business joint venture. The $289,862.90 contract is for repairing water well #3 at Lackland Air Force Base in San Antonio, Texas. The work is being performed under the Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery/indefinite-quantity (IDIQ) contract, a $140 million small business...
The U.S. Air Force Air Education and Training Command awarded a $162,266.59 firm-fixed-price delivery order to Belt Built Con-Cor JV, a minority-owned, small disadvantaged business joint venture, to perform storm damage repair work on buildings B901, B585, and B205 at Joint Base San Antonio-Randolph. This order falls under the $140 million Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery, indefinite-quantity (IDIQ) contract, which provides a wide range of...
This firm fixed-price delivery order contract was awarded to Belt Built Con-Cor JV, a minority-owned small disadvantaged business joint venture, by the Department of the Air Force's Air Education and Training Command. The contract, valued at $120,777.44, is for the epoxy floor removal and replacement of Building 898 at Lackland Air Force Base in Texas. The contract is a task order issued under the Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery,...
The Department of the Air Force Air Education and Training Command awarded a $156,330.06 firm fixed-price delivery order contract to Belt Built Con-Cor JV, a minority-owned small business joint venture, for security upgrades to the 33rd Cyber Operations at Joint Base San Antonio Lackland, TX. This delivery order is part of the $140 million Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery/indefinite-quantity (IDIQ) contract held by Belt Built Con-Cor JV with the...
The Department of the Air Force Air Education and Training Command awarded Belt Built Con-Cor JV a $2,000 delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery indefinite-quantity contract. The delivery order, taking place from November 9 to December 9, 2020, is for non-complex construction services at 1701 Kenly Ave #134 on Lackland Air Force Base in Texas. It has a firm fixed price and was awarded without any set aside designations. The master...
The Department of the Air Force Air Education and Training Command awarded a $13,970 delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master IDIQ to Belt Built Con-Cor JV. The firm fixed-price order is for the removal and installation of poly-jet seam sealant at Lackland Air Force Base in San Antonio, Texas, with work to be completed between August and October 2021. As the prime contractor, Belt Built Con-Cor JV will perform the requested non-complex...
The U.S. Air Force's Air Education and Training Command (AETC) awarded a $32,773 firm-fixed-price delivery order to Belt Built Con-Cor JV, a minority-owned small business joint venture, for mold remediation services at Joint Base San Antonio facilities in Universal City, Texas. This task order falls under AETC's $140 million Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery/indefinite-quantity (IDIQ) contract, which covers a wide range of construction services...
This is a firm fixed-price delivery order contract awarded by the Air Education and Training Command (AETC), a defense agency, to the joint venture Belt Built Con-Cor JV for the renovation of Lyons Park at Joint Base San Antonio-Lackland, Texas. The $970,701.08 contract is a task order under the $140 million Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery/indefinite-quantity (IDIQ) contract, which is set aside for small businesses. Belt Built Con-Cor JV is a...
This is a firm fixed-price delivery order awarded by the Air Education and Training Command (AETC), a component of the U.S. Department of the Air Force, to the Belt Built Con-Cor JV, a minority-owned small disadvantaged business joint venture. The $376,734.26 contract is for the renovation of the command section of the ITAC B2081 facility at Lackland Air Force Base in San Antonio, Texas. The contract is a task order under the $140 million Joint Base San Antonio Non-Complex Construction 2020-2030...
This federal contract award was issued by the Air Education and Training Command (AETC), a defense agency, to the small disadvantaged business joint venture Belt Built Con-Cor JV. The $19,645 firm fixed-price delivery order is to remove and replace a 4-inch riser that provides access to the brine annular space for an underground fuel tank repair at Building 497 on Joint Base San Antonio. This delivery order falls under the larger $140 million Joint Base San Antonio Non-Complex Construction...

The U.S. Air Force's Air Education and Training Command awarded a $59,897.85 firm-fixed-price delivery order to Belt Built Con-Cor JV, a minority-owned small business joint venture, for the FY24 installation of new water lines for water fountains in Building 2000 at Joint Base San Antonio-Lackland, Texas. This order was placed under the Joint Base San Antonio Non-Complex Construction 2020-2030 IDIQ contract, a $140 million multiple-award IDIQ contract set aside for small businesses. Belt Built Con-Cor JV, which holds several other construction and repair IDIQs with federal agencies, is expected to complete the water line installation project by August 16, 2024.

Generated 9/30/24, 1:20 PM