Delivery Order FA301621D0002-FA301624F0434

Award Date 10/1/24
Potential Completion Date 12/30/24
Potential Value $334K
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Lackland AFB, San Antonio, TX, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
5
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a firm fixed-price delivery order awarded to Velocity / CFM JV, LLC, a self-certified small disadvantaged, veteran-owned construction company, for the renovation of the command section of ITAC B2081 at Lackland Air Force Base in San Antonio, Texas. The contract has a ceiling value of $356,153.00 and an ultimate completion date of September 26, 2024. The contract was awarded by the Air Education and Training Command, a defense agency, under the Joint Base San Antonio Non-Complex...
The Department of the Air Force Air Education and Training Command awarded a $2,000 firm fixed price delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 multiple award indefinite delivery indefinite quantity contract vehicle. Velocity/CFM JV, LLC will serve as the prime contractor to provide unspecified non-complex construction services at 1701 Kenly Ave #134 on Lackland Air Force Base in Texas from November 9 to December 9, 2020. The Joint Base San Antonio IDIQ,...
This is a firm fixed-price delivery order awarded by the Air Education and Training Command (AETC), a major component of the U.S. Air Force, to CCI Energy And Construction Services, LLC, an 8(a) certified small disadvantaged business. The $804,561.71 contract is to replace two cooling towers at Lackland Air Force Base in San Antonio, Texas. This award is under the Joint Base San Antonio Multiple Award Construction Contract (JBSA MACC), a $990 million indefinite-delivery, indefinite-quantity...
The Department of the Air Force Air Education and Training Command awarded a $439,172 delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master IDIQ to replace a chiller at Building 6592 located at Lackland Air Force Base in Texas. JVR Southbay JV will serve as the prime contractor on the firm fixed-price contract running from July 2021 through March 2022. No subcontractors or set-aside designations were indicated. The delivery order supports the Air Force's...
This is a firm fixed-price delivery order awarded by the Air Education and Training Command, a Defense agency, to Velocity / CFM JV, LLC, a service-disabled veteran-owned small business. The $71,260 contract is for the removal and replacement of a fire pump, jockey pump, and related equipment at a facility in Universal City, Texas. The work includes concrete pad repairs as needed. This delivery order was issued under the Joint Base San Antonio Non-Complex Construction 2020-2030 IDIQ contract,...
The Department of the Air Force Air Education and Training Command awarded a $445,455 firm fixed price delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master IDIQ to Velocity/CFM JV, LLC. The delivery order is for the removal and replacement of a joint seal at 1701 Kenly Ave #134 at Lackland Air Force Base in Texas, with work to be completed between July 2021 and January 2022. The Joint Base San Antonio Non-Complex Construction master IDIQ, valued at over...
The Department of the Air Force Air Education and Training Command awarded Tejas Premier Building Contractor, Inc. a $2,000 firm fixed price delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery indefinite-quantity multiple award contract. The delivery order is for minimum obligation amount construction services at 1701 Kenly Ave #134 on Lackland Air Force Base in Texas, and has a period of performance from November 9 to December 9, 2020. The...
The Department of the Air Force Air Education and Training Command awarded an $848,608.14 delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master indefinite-delivery/indefinite-quantity contract to JVR Southbay JV. JVR Southbay JV will perform repairs to the heating, ventilation, and air conditioning system at an unspecified facility due to storm damage in San Antonio, Texas, with work scheduled to be completed between June 9, 2022 and August 30, 2023 under...
The Department of the Air Force Air Education and Training Command awarded a $29,806 firm fixed price delivery order to JVR Southbay JV for repair services at Joint Base San Antonio-Randolph in Texas. The delivery order was issued against the Joint Base San Antonio Non-Complex Construction 2020-2030 multiple award task order contract vehicle. Work will involve replacing fan sheave assemblies, motor sheave assemblies, fan shafts, locking collars, fan assemblies, and V-belts at Building 991 to...
The Department of the Air Force Air Education and Training Command awarded a $152,483 delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master IDIQ to Velocity/CFM JV, LLC for boiler shorings. As the prime contractor, Velocity/CFM JV, LLC will perform the work at 1701 Kenly Ave #134 on Lackland Air Force Base in Texas from June through September 2022 under a firm fixed price contract. No subcontractors or set aside designations were indicated. The delivery...

This is a delivery order contract awarded under the Joint Base San Antonio Non-Complex Construction 2020-2030 Indefinite Delivery Indefinite Quantity (IDIQ) contract, which has a $140 million ceiling value and is set aside for total small business participation. The contract was awarded by the Air Education and Training Command, a Defense Department agency, to Velocity / CFM JV, LLC, a service-disabled veteran-owned small business. The $334,263 firm fixed-price contract is for the replacement of two cooling towers at Building 9225 on Joint Base San Antonio-Lackland in Texas, with a completion date of December 30, 2024.

Generated 5/8/25, 9:44 AM