This is a firm fixed-price delivery order awarded by the Air Education and Training Command, a Defense agency, to Velocity / CFM JV, LLC, a service-disabled veteran-owned small business. The $71,260 contract is for the removal and replacement of a fire pump, jockey pump, and related equipment at a facility in Universal City, Texas. The work includes concrete pad repairs as needed. This delivery order was issued under the Joint Base San Antonio Non-Complex Construction 2020-2030 IDIQ contract,...
The Department of the Air Force Air Education and Training Command awarded a $227,943.37 delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master indefinite-delivery/indefinite-quantity contract to Velocity/CFM JV, LLC for 5th Street milling and overlay work. As the prime contractor, Velocity/CFM JV, LLC Division will perform the roadwork at Joint Base San Antonio in Universal City, Texas, with performance required from August 10, 2021 to February 8, 2022 under...
<p>The Department of the Air Force Air Education and Training Command awarded a $399,245.84 firm fixed-price delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master indefinite-delivery/indefinite-quantity contract to Velocity/CFM JV, LLC for a MULTI-WORK BUILDING 592 RENOVATION. The work will be performed at Universal City, Texas and is expected to be completed by May 2, 2023. No subcontractors were identified.</p>
This firm fixed-price delivery order for $469,263.45 was awarded by the Department of the Air Force Air Education and Training Command to Velocity/CFM JV, LLC for work at Lackland Air Force Base in Texas. The project involves the removal and replacement of 24 malfunctioning in-road pipe bollards that are stuck in the down position. The award is issued against the Joint Base San Antonio Non-Complex Construction 2020-2030 multiple award task order contract to support infrastructure maintenance...
This is a firm fixed-price delivery order awarded to Velocity / CFM JV, LLC, a self-certified small disadvantaged, veteran-owned construction company, for the renovation of the command section of ITAC B2081 at Lackland Air Force Base in San Antonio, Texas. The contract has a ceiling value of $356,153.00 and an ultimate completion date of September 26, 2024. The contract was awarded by the Air Education and Training Command, a defense agency, under the Joint Base San Antonio Non-Complex...
The Department of the Air Force Air Education and Training Command awarded an $848,608.14 delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master indefinite-delivery/indefinite-quantity contract to JVR Southbay JV. JVR Southbay JV will perform repairs to the heating, ventilation, and air conditioning system at an unspecified facility due to storm damage in San Antonio, Texas, with work scheduled to be completed between June 9, 2022 and August 30, 2023 under...
The Department of the Air Force Air Education and Training Command awarded a $195,544.97 firm fixed price delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master indefinite-delivery/indefinite-quantity contract. JVR Southbay JV will perform repairs to Building 977 at Universal City, Texas, including replacement of carpet, ceiling tiles, cove base, vinyl molding, and HVAC duct insulation to address water and moisture issues resulting from winter storm damage....
This is a firm fixed-price delivery order awarded by the Air Education and Training Command (AETC), a defense agency, to Belt Built Con-Cor JV, a minority-owned small disadvantaged business joint venture. The $289,862.90 contract is for repairing water well #3 at Lackland Air Force Base in San Antonio, Texas. The work is being performed under the Joint Base San Antonio Non-Complex Construction 2020-2030 indefinite-delivery/indefinite-quantity (IDIQ) contract, a $140 million small business...
This is a firm fixed price delivery order awarded by the Department of the Air Force Air Education and Training Command to JVR Southbay JV, a minority-owned 8(a) certified joint venture, for the removal and replacement of an ADA wheelchair lift at a facility in Universal City, Texas. The total ceiling value of the order is $57,730.86 and the work is to be completed by May 10, 2024. This delivery order is placed under the $140 million Joint Base San Antonio Non-Complex Construction 2020-2030 IDIQ...
The Department of the Air Force Air Education and Training Command awarded a $491,797.69 firm fixed price delivery order against the Joint Base San Antonio Non-Complex Construction 2020-2030 master IDIQ to Velocity / CFM JV, LLC for maintenance restriping of airfield taxiways and aprons at Kelly Field in San Antonio, Texas. As the prime contractor, Velocity / CFM JV, LLC will perform the requested maintenance restriping services at Lackland Air Force Base through September 2022. The delivery...