Delivery Order DEAM6509WC82058-DEAT6512WC96626

Award Date 2/24/12
Potential Completion Date 6/3/12
Potential Value $73K
Ultimate Awardee
Not listed
Set-Aside Type
8(a) Sole Source
Extent Competed
Not Available for Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Yankton, SD 57078, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The Western Area Power Administration awarded a definitive contract valued at $371,093 to Leskca Incorporated for repairs to Structure 103/4 of the Fort Randall to Sioux City 230-kilovolt transmission line in Westfield, Iowa. The work involves site preparation, installation of riprap and an anchored reinforced vegetation system to address erosion damage at the tower. Funding is provided by the U.S. Department of Energy under its program for the Fort Randall to Sioux City 230-kV transmission...
This federal contract award is for bank stabilization and riprap protection work on the Fort Randall - Sioux City No. 2 230-kV Transmission Line, Structure 103/4, located in Iowa. The $653,213.00 contract was awarded by the Western Area Power Administration (WAPA), a civilian agency under the U.S. Department of Energy, to Leskca Incorporated, a woman-owned small disadvantaged business based in Box Elder, South Dakota. The work involves miscellaneous sitework, construction and repair of the...
The Department of Energy Western Area Power Administration awarded a firm fixed price delivery order valued at one hundred twenty-eight thousand six hundred thirty dollars ($128,630) to Complete Concrete, Inc. of Valley City, North Dakota for structure 32/7 riprap protection of the Jamestown-Valley City 115-kV transmission line. Work will include installing rock or crushed stone to protect the embankments and shorelines of the transmission line from erosion. Performance will occur in Valley City...
Leskca Incorporated was awarded a firm fixed-price delivery order valued at two hundred thirty-five thousand four hundred sixty dollars by the Department of Energy's Western Area Power Administration to perform repairs on transmission line structures located in South Dakota and Iowa. Specifically, the contractor will repair structure number 29/2 on the Utica Junction to Sioux Falls 230-kilovolt transmission line and structures number 23/4 and 27/3 on the Sioux Falls to Sioux City 230-kilovolt...
The Department of the Army Corps of Engineers awarded a $836,000 firm fixed price contract to Sharpe Enterprises Inc. to replace the subsurface drainage system at the 115kV and 230kV Oahe Switchyard in Mission Ridge, South Dakota. The solicitation sought bids to remove the existing drainage pipes and aggregates and install new perforated and solid PVC pipes, pipe casing under roadways, and gate valves, while avoiding damage to nearby electrical structures, grounding mats, and underground...
<p>This is a definitive, firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to Interstate Electrical Contractors, Inc. for $16,125,035.92 to perform oil-filled cable replacement at the Fort Randall Dam in Pickstown, South Dakota. The contract has a total small business set-aside designation and a completion date of July 29, 2019. This work supports USACE's hydropower and flood control mission at the Fort Randall Dam facility.</p>
This definitive contract from the Department of the Army Corps of Engineers Omaha District awards $856,862.50 to Steve Lehrkamp Enterprises Inc. to provide bank stabilization at the Oahe Dam Outlet Works Channel in Fort Pierre, South Dakota. The scope of work includes furnishing approximately 2,000 cubic yards of earth embankment, 5,000 square yards of geotextile, and 10,000 tons of riprap stone protection, as well as incidental work such as temporary access roads. The solicitation was set aside...
This definitive contract was awarded by the Department of the Army Corps of Engineers to Site Development &amp; Construction, Inc. for $697,820.87 to implement bank stabilization measures along approximately 2,500 linear feet of shoreline on Lake Francis Case in South Dakota. The solicitation sought bids for services including slope grading, geotextile installation, and placement of approximately 2,700 tons of riprap stone along 20 miles northwest of Pickstown and 5 miles southwest of Oacoma....
<p>The Department of Energy Western Area Power Administration awarded a firm-fixed-price definitive contract to John Prouty Construction, Inc., a for-profit Subchapter S Corporation, for the NIOBRARA RIVER STRUCTURE 183 RIPRAP PROTECTION, FT. RANDALL - ON'EILL 115-KV TRANSMISSION LINE project in O'Neill, Nebraska. The contract has a potential value of $115,465.00 and a completion date of March 31, 2020. This contract is not associated with a set-aside program.</p>
The Department of the Army Corps of Engineers awarded a $352,251 firm fixed price contract to Jeremy Thomas Construction LLC for bank stabilization services along approximately 700 linear feet of shoreline at the Old Fort Thompson site in Buffalo County, South Dakota. Under solicitation number W9128F22B0007, the contractor will cut, grade, and compact the existing bank, install geotextile fabric and riprap stone from an on-site stockpile, and complete site restoration. All work must be...

EROSION PROTECTION AROUND STRUCTURE NO. 56/1 ON THE FORT RANDALL-SIOUX CITY 230-KV TRANSMISSION LINE, SOUTH DAKOTA

Posted 2/24/12, 12:00 AM