Delivery Order AG04N7C119002-INL12PD00290
Award Date 2/29/12
Potential Completion Date 9/30/12
Potential Value $15K
Federal Agency
Awardee
Ultimate Awardee
Not listed NAICS Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
Total Small Business
Extent Competed
Competed under SAP
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Grants Pass, OR 97526, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
1
Legislative Mandate
Service Contract Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- Jacobs Project Management Co. was awarded a $33.2 million cost-plus-fixed-fee delivery order on September 26, 2023, for pilot capping and draft final cell removal activities at the New Bedford Harbor Superfund Site in New Bedford, Massachusetts. The contract, which is not subject to any set-aside designation, has an ultimate completion date of July 31, 2026, and is funded through the Environmental Restoration (ENDIST) New England office. The project addresses environmental remediation...
- The U.S. Army Corps of Engineers, New England District awarded a $53,640 firm fixed-price purchase order to Bear Excavation LLC on September 15, 2025, for sediment removal services at Northfield Brook Lake in Thomaston, Connecticut. This total small business set-aside contract is scheduled for completion by April 14, 2026. The scope of work involves removing approximately 1,200 cubic yards of accumulated sediment from the lake, which has built up due to flood operations and surrounding...
- This is a federal contract award from the U.S. Army Corps of Engineers (USACE) to the prime contractor Jacobs Project Management Co. for dredging and remediation services at the New Bedford Harbor Superfund Site in New Bedford, Massachusetts. The total ceiling value of the contract is $76,899,629.94. The contract is a delivery order with a cost-plus-fixed-fee pricing type. It does not utilize any set-aside designations. Major subcontractors include Tantara Associates Corp, Sevenson Environmental...
- The Bureau of Land Management Oregon-Washington awarded a $272,560 firm fixed price contract to Billeter Marine LLC for the removal of an existing 42-inch diameter corrugated metal pipe and replacement with a 70-foot long by 18-foot wide galvanized steel bridge. The solicitation sought proposals to perform clearing, grubbing, constructing a stream bypass, dewatering, excavating bedrock, building geosynthetic soil abutments, placing eco-block foundations, and restoring the roadway. This total...
- Jacobs Project Management Company received a delivery order valued at $4.48 million from the Defense Energy Information System (ENDIST) New England, a Defense Department agency, for dredging and remediation services at the New Bedford Harbor Superfund Site in New Bedford, Massachusetts. The contract, awarded on August 11, 2020, is structured as a cost-plus-fixed-fee arrangement with an ultimate completion date of March 31, 2021, and carries no set-aside designation. Sevenson Environmental...
- Jacobs Project Management CO., a subsidiary of Jacobs Engineering Group Inc., was awarded a $1.03M delivery order on August 7, 2023, for dredging and remediation services at the New Bedford Harbor Superfund Site in New Bedford, Massachusetts. The contract utilizes a cost-plus-fixed-fee pricing structure with an ultimate completion date of August 31, 2024, and carries no small business set-aside designation. Funding is provided through the Defense-affiliated New England Division, and the work...
- Stone Construction Company, Inc. was awarded a $3,800 firm fixed price call against the Black Rock Lake Log Boom Debris Removal Blanket Purchase Agreement by the U.S. Army Corps of Engineers, New England District. This small business set-aside contract requires removal of log boom debris from Black Rock Lake in Thomaston, Connecticut by November 11, 2022. The Army Corps of Engineers, New England District manages civil works projects including navigation, flood control and environmental...
- The U.S. Army Corps of Engineers, New York District awarded a $5.2 million firm fixed price definitive contract to Great Lakes Dredge & Dock Company, LLC to perform maintenance dredging of approximately 370,000 cubic yards of sediment from portions of the New York and New Jersey Harbor, Port Jersey Channel Federal Navigation Project. Under the contract, Great Lakes Dredge & Dock Company will use a mechanical dredge with a clamshell environmental bucket along with multiple ocean-going...
- This is a firm fixed-price purchase order contract awarded by the Bureau of Land Management (BLM), Montana-Dakotas Region to RF Construction LLC, a small business, for the removal of a dock pipe piling at the White Sandy Campground in Lewis and Clark County, Montana. The contract has a ceiling value of $78,000.00 and a completion date of November 1, 2019. The original solicitation was a pre-solicitation notice that described the requirement to furnish labor, equipment, supplies, and materials to...
- This is a $51,352,154.25 Delivery Order contract with the U.S. Army Corps of Engineers for remedial action at the New Bedford Harbor Superfund Site in Massachusetts. The prime contractor is Jacobs Project Management Co., a large engineering and construction services firm. Major subcontractors include Battelle Memorial Institute, Geosyntec Consultants, Inc., Sevenson Environmental Services, and others providing environmental consulting, remediation, and geophysical surveying services. This...
- AG04N7C119002Indefinite Delivery Contract
- AG04N7C119002-INL12PD00290Delivery Order
MEDFORD-LANDING PILE REMOVAL-LLORM07000
Posted 2/29/12
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 2 | Change Order | $4.6k | 9/13/12 | |
| 1 | Other Administrative Action | $0 | 3/20/12 | |
| Not listed | Not listed | $10.2k | 2/29/12 |