154MESA22061212985TASK002S
THE CENTERS OF EXCELLENCE ARE LOCATED AT THREE UNIVERSITIES IN CHISINAU (2) AND BALTI (1) TO INCLUDE THE STATE UNIVERSITY OF MOLDOVA, STATE PEDOLOGICAL UNIVERSITY, AND STATE UNIVERSITY PUBLIC INSTITUTION "ALECU RUSSO", BÄ LTI. THE TOTAL INSTALLED CAPACITY OF THREE SOLAR PV PROJECTS IS 300 KWP, AS DETAILED BELOW. WITHIN THIS CONTEXT, MESA IS SEEKING QUALIFIED SUPPLIERS OF ELECTRICAL EQUIPMENT THAT WILL SOURCE, PROCURE, AGGREGATE, SHIP AND DELIVER THE COMPONENTS IN THREE SEPARATE BATCHES TO THREE PROJECT SITES, DESCRIBED IN THE FOLLOWING SECTIONS. AGGREGATION AND SHIPMENT SHALL BE DONE IN DISTINCT BATCHES, AGGREGATED ACCORDINGLY TO THE LIST OF EQUIPMENT AND QUANTITIES SPECIFIED
None
Delivery Order 7200AA19D00029-72011722F00002
$142.0k 9/27/24 154MESA22061201010S
IN ORDER TO MEET THE SPECIFIC NEEDS OF MESA, THIS PURCHASE ORDER INCLUDES THE FOLLOWING PRODUCTS: Â ¢ ENERCAST IPL INTEGRATION PLATFORM ENSURES THE SEAMLESS INTEGRATION OF FORECASTS AND EVEN THIRD-PARTY DATA INTO YOUR BUSINESS PROCESSES, PROVIDES THE WEB-BASED ENERCAST PORTAL, AND INCLUDES TOOLS TO GIVE YOU FULL CONTROL OVER YOUR ENERCAST SERVICES AND THE ASSETS MANAGED THEREIN. IT ALSO PROVIDES FOR THE CONTINUOUS MONITORING AND OTHER SERVICES REQUIRED. Â ¢ ENERCAST PFS POWER GENERATION SITE FORECAST DELIVERS ACCURATE FORECASTS FOR INDIVIDUAL PLANTS OR ENTIRE WIND OR SOLAR PARKS. FOR EACH METERING POINT, ONE FORECAST STREAM (TIME SERIES OF FORECASTED POWER GENERATION) IS BEING CALCULATED. FORECAST STREAMS CAN BE COMBINED TO GENERATE AN AGGREGATED FORECAST STREAM AT ANY AGGREGATION LEVEL SUCH AS SUBSTATION, CLUSTER, PROVINCE, AND COUNTRY LEVEL. Â ¢ ENERCAST SUPPORT SERVICES HELP CUSTOMERS GET THE BEST POSSIBLE BENEFITS AND INSIGHTS FROM THEIR PRODUCTS. FOR THIS TENDER, MONTHLY REPORT ON FORECAST ACCURACY WILL BE PROVIDED (RFP, APPENDIX A, TECHNICAL SPECIFICATIONS) UNDER SUPPORT SERVICES.
Enercast GMBH
Delivery Order 7200AA19D00029-72011722F00002
$32.2k 7/11/24 154MESA22061208991S
SERVES AS PRIMARY EXPERT ON ICE TECHNOLOGY, SPECIFICALLY DESIGN, PROCUREMENT, INSTALLATION, COMMISSIONING, AND ASSET OPERATION. § PROVIDE SPECIALISTS NECESSARY FOR THE INSTALLATION OF THE MAIN ICE POWER UNIT. § PROVIDES TECHNICAL EXPERTISE THROUGHOUT PROCUREMENT LIFE CYCLE BY DRAFTING, REVIEWING, AND FINALIZING TECHNICAL SPECIFICATIONS OF ICE TECHNOLOGY AND PARTICIPATING IN EVALUATION AND CONTRACT NEGOTIATIONS. § ADVISES LOCAL POWER ENGINEERS AND LAWYERS DURING REGULATORY REVIEW TO ENSURE FCR AND AFRR CAN BE INTEGRATED INTO MOLDOVA S POWER SYSTEM IN ALIGNMENT WITH ENTSO-E COMPLIANCE REQUIREMENTS. § ADVISES LOCAL INSTALLERS ON THE PROPER INSTALLATION OF THE UNIT IN LINE WITH THE INSTALLATION MANUAL. § ENSURE THAT CONSTRUCTION AND INSTALLATION COMPLIANCE DOCUMENTATION MEET REGULATORY STANDARDS AND PROJECT SPECIFICATIONS, TO GUARANTEE WARRANTY AND COMMERCIAL SIGN-OFF. § ADVISES DURING TESTING AND COMMISSIONING OF THE UNITS, ENSURING THAT ALL QUALITY ASSURANCE AND QUALITY CONTROL MEASURES, INSPECTIONS, AND STANDARDS ARE MET. § LEADS DESIGN OF AND DELIVERS  ON THE JOB OPERATION AND MAINTENANCE TRAINING FOR RELEVANT INSTITUTIONS ON THE OPERATION AND MAINTENANCE OF FCR AND AFRR.
None
Delivery Order 7200AA19D00029-72011722F00002
$246.9k 5/1/24 154MESA22061204179S
THIS SECTION DESCRIBES THE ACTIVITIES THAT ARE RECOMMENDED TO BE CARRIED OUT IN ORDER TO MAKE THE MOLDOVAN ENERGY GRID MORE RELIABLE AND SUSTAINABLE, AS WELL AS MORE INFORMATIVE. ACQUISITION AND PROCESSING OF LARGER VOLUME OF INFORMATION WILL HELP IN OPTIMIZATION OF THE TASKS OF DISPATCH CONTROL AND ENERGY MARKET MANAGEMENT, WILL REDUCE TECHNICAL LOSSES OF THE POWER SYSTEM, IMPROVE OPERATION OF MEL'S IT DEPARTMENT AND OTHER SERVICES OF THE ORGANIZATION NOT DIRECTLY RELATED TO THE TECHNOLOGICAL PROCESS, ETC. THE FOLLOWING APPROACH HAS TO BE CONSIDERED IN THIS REGARD: A. THE ISSUE OF RELIABILITY AND STABILITY IS PRIMARILY RELATED TO PROTECTION, AUTOMATION AND REGULATION SYSTEMS. FROM THIS POINT OF VIEW, THE POWER SYSTEM OF MEL MUST BE EQUIPPED WITH DIGITAL PROTECTIVE RELAYS, CONTROLLERS PROVIDING SYNCHROPHASOR MEASUREMENTS AND EMERGENCY CONTROL FUNCTIONALITIES. B. INCREASING THE LEVEL OF INFORMATION ACQUISITION IS DIRECTLY RELATED TO THE DIGITALIZATION OF SUBSTATIONS AND POWER PLANTS, USING MODERN STATION PROTOCOLS AND INTERSYSTEM DATA EXCHANGE PROTOCOLS. IN OTHER WORDS, DIGITAL RELAYS / IEDS THAT ARE TO PERFORM SPECIFIC FUNCTIONS, SUCH AS PROTECTIONS, AUTOMATION, FAULT LOCATION DETECTION OR POWER QUALITY MONITORING AND ETC., SHOULD SIMULTANEOUSLY BECOME A SOURCE OF INFORMATION FOR SCADA, EMS, MMS AND OTHER SYSTEMS DESIGNED TO INCREASE THE EFFICIENCY OF POWER FLOW CONTROL, TECHNICAL AND COMMERCIAL OPERATION OF THE POWER SYSTEM. TO SOLVE SUCH A MULTIFUNCTIONAL TASK, IT IS NECESSARY TO CREATE STABLE AND REDUNDANT COMMUNICATION LINKS, CONNECTING SUBSTATIONS AND POWER PLANTS, DISPATCHING SUB-CENTERS AND THE NATIONAL CONTROL CENTER TO THIS END, IT IS NECESSARY FOR MEL TO DEVELOP ITS OWN FIBER OPTIC NETWORK, WHICH WILL COVER ALL STATIONS OF THE 400/330 KV NETWORK, AS WELL AS KEY 110 KV SUBSTATIONS AND SIGNIFICANT GENERATION FACILITIES. CREATING AN OPTICAL NETWORK IS A LONG AND EXPENSIVE PROCESS, THEREFORE, AT THE FIRST STAGE, IT IS PROPOSED TO EXPAND THE EXISTING NETWORK TO THE KEY NETWORK SUBSTATIONS AND ROMANIAN TSO TRANSELECTRICA, THUS PROVIDING THE REQUIRED EXCHANGE OF INFORMATION AND WITH ENTSO-E COUNTRIES IN ORDER TO MEET INFORMATION EXCHANGE REQUIREMENT AND ASSURE SYSTEM RELIABILITY AND STABILITY. ALONG WITH THE EXPANSION OF OPTICAL LINKS, IN ORDER TO SOLVE THE ABOVE MULTIFUNCTIONAL TASKS OF UTILIZATION DIGITAL RELAYS AND IEDS, IT IS NECESSARY TO INSTALL APPROPRIATE TELECOMMUNICATION INTERFACES IN FO CONNECTED STATIONS, WHICH, USING A MINIMUM NUMBER OF OPTICAL CORES, WILL ENSURE THE FLOW OF INFORMATION OF VARIOUS FORMAT, PROTOCOL AND VOLUME. SUCH A TOOL IS INDUSTRIAL MULTIPLEXERS FOCUSED ON THE OBJECTIVES OFTECHNOLOGIES AND ORIENTED ON THE TASKS OF ENERGY SYSTEMS IN PARTICULAR. THE GEOGRAPHICAL LENGTH OF THE FO LINKS TO BE INSTALLED IS ABOUT 192 KM (ROUT LENGTH). THE TABLES BELOW SHOW THE OVERHEAD LINES THAT HAVE BEEN BUDGETED TO INSTALL OPTICAL FIBER GROUNDING WIRE. THE TRANSMISSION LINE LENGTHS INDICATED BELOW ARE THE LENGTH OF THE OHLS FROM GANTRY TO GANTRY OF THE RESPECTIVE SUBSTATIONS OR TO THE T-OFFS AND NOT THE LENGTH OF THE EXISTING EARTH WIRE INSTALLED.
KEC International LTD
Delivery Order 7200AA19D00029-72011722F00002
$2.4m 1/29/24 154MESA22061204665S
THE PROPOSED SCADA/EMS PROJECT HAS THE OBJECTIVE TO DELIVER AN OPERATIONAL SCADA/EMS SYSTEM IN MOLDELECTRICA NETWORK, WITH CUSTOMER SUPPORT, SYSTEM CONFIGURATION AND TRAINING PROVIDED BY GE DIGITAL. CONSIDERING THE MATURITY OF THE PROPOSED SOLUTION, THE GE TEAM WILL DEPLOY THE SOLUTION USING A WATERFALL METHOD. THE ASSIGNED PROJECT TEAM WILL FOLLOW A STAGED DELIVERY PLAN (AS DEPICTED BELOW), USE STANDARD TOOLS AND PROCESSES. GE UTILIZES THE PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK), AS FOUNDATION FOR ITS PROJECT MANAGEMENT APPROACH. THIS APPROACH INCLUDES FIVE MAJOR PROCESS GROUPS: PROJECT INITIATION, PLANNING, EXECUTION, CONTROL, AND CLOSURE. EACH OF THESE GROUPS CONTAINS VARIOUS PROCESSES THAT ENCOMPASS DIFFERENT AREAS OF PROJECT MANAGEMENT KNOWLEDGE, SUCH AS INTEGRATION, SCOPE, TIME, COST, QUALITY, HUMAN RESOURCE, COMMUNICATION, RISK, AND PROCUREMENT MANAGEMENT. WITH THESE PRINCIPLES, EACH STAGE WILL BE PROACTIVELY PLANNED, MONITORED, AND CONTROLLED. THE FOLLOWING DELIVERABLES ARE INCLUDED AS STANDARD IN THIS PROPOSAL, IN ACCORDANCE WITH THE DESCRIPTIONS BELOW: 1. LICENSED SCADA/EMS SOFTWARE 2. SOFTWARE AND HARDWARE INSTALLATION 3. CONFIGURATION SERVICES 4. ACCEPTANCE TESTING 5. DOCUMENTATION 6. END USER TRAINING 7. WARRANTY WEEKLY STATUS CALLS SHALL BE ARRANGED DURING PROJECT EXECUTION TO ENSURE A CLEAR FLOW OF COMMUNICATION, UNLESS A DIFFERENT MEETING FREQUENCY OR FORM OF COMMUNICATION IS AGREED BETWEEN THE PARTIES. IN ORDER TO CLARIFY THE SOFTWARE DELIVERABLES AND METHOD OF PROJECT EXECUTION, A STATEMENT OF WORK SHALL BE PROVIDED BY GE DIGITAL WITHIN TEN (10) WORKING DAYS OF CONTRACT EXECUTION. GE DIGITAL PERSONNEL WILL BE PRESENT ON SITE FOR STATEMENT OF WORKS IF DEEMED NECESSARY BY TETRATECH/MOLDELECTRICA. THE PARTIES SHALL MEET VIA WEB-CONFERENCE IF REQUIRED WITHIN A FURTHER TEN (10) WORKING DAYS TO DISCUSS ANY FURTHER CLARIFICATIONS AND RESOLVE ANY OPEN QUESTIONS THAT MAY REMAIN. FURTHER TRIPS OR PRESENCE ON SITES WILL BE DISCUSSED AND AGREED DURING THE STATEMENT OF WORK. WEEKLY STATUS CALLS SHALL BE ARRANGED DURING PROJECT EXECUTION TO ENSURE A CLEAR FLOW OF COMMUNICATION, UNLESS A DIFFERENT MEETING FREQUENCY OR FORM OF COMMUNICATION IS AGREED BETWEEN THE PARTIES.
GE Energy Management Services, LLC
Delivery Order 7200AA19D00029-72011722F00002
$3.9m 12/27/23