Delivery Order 31310020D0007-31310023F0047
- Not listed
- This is a federal contract award for CONTRACTOR SUPPORT FOR THE PARCS CODE SUITE, awarded by the U.S. Nuclear Regulatory Commission (NRC) to the Regents of the University of Michigan, Office of Research and Sponsored Projects, doing business as the University of Michigan. The contract has a ceiling value of $1,899,836.00 and is a definitive contract with a time and materials pricing type. The ultimate completion date is March 31, 2021. The contract does not have a set-aside designation. The...
- This is a federal contract award from the U.S. Nuclear Regulatory Commission (NRC) to Purdue University, a not-for-profit educational institution, for PARCS maintenance and assessment services. The $578,359.00 delivery order contract, which does not have a set-aside designation, runs from September 2005 to September 2006. Purdue University, as the prime contractor, will provide these services from its campus in West Lafayette, Indiana. The PARCS system, which stands for Purdue Advanced Reactor...
- <p>The Nuclear Regulatory Commission issued a delivery order to the Regents of the University of Michigan on August 25, 2020, with a ceiling value of $10,000.00 under a Cost No Fee pricing structure for technical assistance in support of NRC nuclear regulatory research for materials, waste, and reactor programs.</p> <p>Place of performance is Ann Arbor, Michigan. The order's ultimate completion date is July 31, 2025. The delivery order was issued without a set-aside designation.</p>
- This is a federal contract award to Energy Research Inc., a for-profit technical and scientific consulting firm in Rockville, Maryland, by the U.S. Nuclear Regulatory Commission (NRC). The contract is for the development and assessment of the TRAC/RELAP Advanced Computational Engine (TRACE) and Purdue Advanced Reactor Core Simulator (PARCS) plant models to support licensing actions. The contract is a cost-plus-fixed-fee delivery order with a ceiling value of $582,810.87 and a performance...
- The University of Michigan was awarded a definitive cost-no-fee contract valued at $753,812 by the Nuclear Regulatory Commission to continue work on post-critical heat flux heat transfer instrumentation and experimentation. The objective of this non-competitive award is to complete fabrication and testing of an advanced two-phase instrumentation system, conduct validation testing, and perform steady-state low-quality film boiling experiments in a tubular test section. This work will provide...
- This is a $324,000.00 cost-no-fee delivery order contract awarded by the U.S. Nuclear Regulatory Commission (NRC) to Purdue University, a nonprofit institution of higher education, for thermal hydraulic research and the application of the MELCOR assessment model. The contract has a period of performance from September 23, 2005 to September 23, 2006 and does not utilize a set-aside. Purdue University, as the prime contractor, will perform the work at its campus in West Lafayette, Indiana. This...
- The Nuclear Regulatory Commission (NRC) awarded a $150,000 firm-fixed-price purchase order to Battelle Memorial Institute to participate in the "PARTRIDGE-3: Probabilistic Analysis as a Regulatory Tool for Risk Informed Decision GuidancE" program. The work involves maintaining and enhancing the Pro-LOCA probabilistic fracture mechanics code originally developed for the NRC, as well as updating supporting documentation. This contract is part of the broader PARTRIDGE collaborative...
- This contract was awarded by the U.S. Nuclear Regulatory Commission (NRC) to Purdue University, a not-for-profit educational institution, to provide engineering services. The contract has a ceiling value of $367,068.00 and was issued as a delivery order with a cost-no-fee pricing type. The period of performance runs through September 23, 2006, and the work is to be conducted in West Lafayette, Indiana. This award does not appear to have a set-aside designation. Purdue University is a prominent...
- This is a $689,169.60 firm fixed-price delivery order awarded by the U.S. Nuclear Regulatory Commission (NRC) to Energy Research Inc., a technical and scientific consulting firm in Rockville, Maryland. The contract is for the development and assessment of TRAC/RELAP Advanced Computational Engine (TRACE) and Purdue Advanced Reactor Core Simulator (PARCS) plant models to support licensing actions and address emergent technical issues related to nuclear reactor systems. The contract has an ultimate...
- The U.S. Nuclear Regulatory Commission (NRC) awarded a delivery order contract valued at $1,486,865.00 to The Pennsylvania State University (Penn State) for the "Advanced Reflood Thermal-Hydraulics for Uncertainty Resolution (ARTHUR)" project. The contract, which has no set-aside designation, is for Penn State to provide the NRC with research, engineering, and technical services related to advanced thermal-hydraulic modeling and analysis for nuclear reactor safety. As a leading...
- 31310020D0007Indefinite Delivery Contract
- 31310020D0007-31310023F0047Delivery Order
The U.S. Nuclear Regulatory Commission (NRC) awarded a delivery order contract valued at $1.25 million to the Regents of the University of Michigan for contractor support services related to the Purdue Advanced Reactor Core Simulator (PARCS) code suite. The contract, issued on May 22, 2023, with performance extending through January 31, 2027, is structured as a cost-no-fee arrangement with no set-aside designation. The University of Michigan's Office of Research and Sponsored Projects will perform work at its Ann Arbor facility, leveraging the institution's extensive research infrastructure and technical expertise in nuclear science and engineering to support NRC regulatory objectives. The contract encompasses maintenance, code support, assessment, development, and user training for the PARCS/PATHS and GENPMAXS codes, as well as interfacing PARCS with RELAP, TRACE, and SNAP simulation tools. Purdue University serves as a major subcontractor, having been awarded a delivery order on September 19, 2025, to execute specific technical tasks including TRACE/PARCS detector and control rod signal processing, development of node-quadrant-based sub-grid exposure methods, and confirmatory research efforts for accident-tolerant fuel variants with extended enrichment levels. This collaborative arrangement between two leading research universities delivers critical technical capabilities supporting the NRC's regulatory framework for advanced reactor core analysis and fuel performance assessment.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Contractor Support for the Purdue Advanced Reactor | 31310023R0001 | Nuclear Regulatory Commission | Award Notice 1/1 | 5/22/23, 3:42 PM |
ContractNumber | Description | Subcontractor | Prime Award | Award Date | Amount | Submitted At |
|---|---|---|---|---|---|---|
SUBK00018988S | Purdue University | Delivery Order 31310020D0007-31310023F0047 | 9/19/25 | $146.2k | 9/19/25 |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00014 | Funding Only Action | $75.0k | 3/16/26 | |
| P00012 | Funding Only Action | $75.0k | 11/26/25 | |
| P00011 | Other Administrative Action | $0 | 9/17/25 | |
| P00010 | Funding Only Action | $70.0k | 4/18/25 | |
| P00009 | Funding Only Action | $70.0k | 3/3/25 |