(item# 1) (REQ# 1496501) base, part 1/2 - WR# HFI80093 - install a/c and server racks - bldg 10 CRC - log # 0004 - CHG # 1- CT# HHSN29200022 - this funding is for additional design which are…
Ended Awarded Last action
- Contract number
- HHSN29200068
- Awardee
-
Gilbane Building Company UEI XCJ8L4TK5NM8
- Awarding agency
-
NIH Construction
National Institutes of Health, Department of Health and Human Services
- Obligated
- $47,583
Award facts
- Contract value 100% obligated
- $47,583.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Y119 Construct/Other Admin & Svcs Bldgs
- Set-aside
- No set-aside
- Competition
- Full and Open Competition · 0 offers
- Pricing
- Firm Fixed Price
- Place of performance
- Bethesda, MD 20892, USA
- Legislative mandates
-
- Davis-Bacon Act FAR subpart 22.4
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Close Out | $0 | |
| Original award | $47,583 |
Description
(item# 1) (REQ# 1496501) base, part 1/2 - WR# HFI80093 - install a/c and server racks - bldg 10 CRC - log # 0004 - CHG # 1- CT# HHSN29200022 - this funding is for additional design which are required in order to provide the needed services - brian weinmeister. Delivery this line item 82 days after award.can 8362265 - ORF FY-2010 08003820100DB0SCOPE of work HFI80093EMERGENCY communication center in crcthe following design services are required in building 10 room B1-6522:1. The new space will be designed to accommodate a maximum of 9 people.2. The existing HVAC systems will need to be evaluated base on the proposed equipment and personnel loads. Existing HVAC system utilizes base building air with no redundancy. Install new wall-hung DX split system to handle the full load if the base building air goes down. Chilled water is not available. Condensing units will be located in the garage area at a location to be selected by NIH.3. The existing fire alarm & sprinkler systems will need to be evaluated based on the proposed equipment and architectural modifications.4. Select equipment shall be provided with UPS back-up power supplies. Anticipate a minimum UPS uptime of 4 hours at full load for all critical circuits.5. Evaluate the existing UPS system, coupled with the proposed new loads for the possibility of upgrading or supplementing the protected power. There is an existing UPS stated to be 20KVA application presently loaded to approximately 20%. 6. Provide a monitor wall with
Quick answers
Who was awarded contract HHSN29200068?
HHSN29200068 was awarded to Gilbane Building Company by NIH Construction (National Institutes of Health) on May 5, 2010.
How much is contract HHSN29200068 worth?
The government has obligated $47,583 on HHSN29200068.
Is contract HHSN29200068 an order under another contract?
Yes. HHSN29200068 is a delivery order under 292030107, an indefinite delivery contract.
Was contract HHSN29200068 competed?
The extent of competition for HHSN29200068 was full and open competition. The government received 0 offers.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award