Delivery Order 1291S818D0012-1291S819F0102
Award Date 7/22/19
Potential Completion Date 6/30/20
Potential Value $62K
Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Rancho Cordova, CA 95670, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
1
Legislative Mandate
Clinger Cohen Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This is a $6,204,376.08 definitive contract awarded by the Federal Highway Administration, a civilian agency, to Record Steel and Construction, Inc. (RSCI) for the Williams Creek (Shoup) Bridge Replacement project in Salmon, Idaho. The contract is a firm fixed-price arrangement with no set-aside designation. RSCI, a for-profit HUBZone joint venture, is the prime contractor. Key subcontractors include Idaho Construction & Development LLC and Inland Crane Inc., who were awarded subcontracts...
- The USDA Forest Service Pacific Northwest Region awarded a firm fixed price delivery order valued at $57,407 to Sargent Engineers Inc. to perform load rating analyses of twenty bridges located across national forests in Oregon and Washington. The bridges vary in materials, construction methods, and age. Under the contract, Sargent Engineers will analyze and rate the load bearing capacity of each bridge to ensure safety. The award was made without any set aside designation against the agency's...
- This is a $37,800.00 firm-fixed-price definitive contract awarded by the U.S. Department of Agriculture's Region 5 - Pacific Southwest Region to Copper Mountain Services LLC, a small disadvantaged and service-disabled veteran-owned business, to perform repairs on the Salmon-Taylor Bridge in Yreka, California. The contract involves correcting structural deficiencies and replacing a damaged abutment cap. The contract was set aside for small businesses and was awarded on May 11, 2016 with a...
- The Federal Highway Administration awarded a delivery order valued at $3,292.91 to Clark Nexsen Inc. for engineering services related to the structural load rating calculation for the Molalla River Bridge in Oregon, which is owned and maintained by the Bureau of Land Management. The contract, awarded on February 12, 2019, utilized a firm fixed-price delivery order structure with an ultimate completion date of May 31, 2019. This no-cost administrative modification financially and contractually...
- The Department of Agriculture Forest Service R6-Pacific Northwest Region awarded a $994,555.00 firm fixed-price definitive contract to Ridge2River Construction LLC, a woman-owned small business, to construct a 160-foot prefabricated steel truss pedestrian bridge on reinforced concrete abutments in McKenzie Bridge, Oregon. Ridge2River Construction, an SBA-certified 8(a) and HUBZone firm, has held over 20 prime contracts with the Forest Service since 2019 to provide construction and maintenance...
- This federal contract award from the Federal Highway Administration (FHWA) is for the repair of two historic reinforced concrete viaducts located near Multnomah Falls in Multnomah County, Oregon. The 2.6-mile project includes concrete patching, crack injection, rebar repair, cathodic protection, polymer concrete deck overlay, beam shear strengthening, wall repair, and surface coating on an 86-span, 863-foot long viaduct and a 20-span, 403-foot long viaduct. The $14,190,895.67 definitive, firm...
- This is a $594,299.81 firm fixed-price contract awarded by the U.S. Department of Agriculture's Intermountain Operations Center to Engleman Steel Erection, Inc. to perform the TAS Recovery Clearwater NF Forest-Wide Trail Bridge Repair Project. The project involves deferred maintenance on a trail suspension bridge in the Lochsa Corridor. The contract was awarded under the American Recovery and Reinvestment Act (ARRA) Major Program Code for Forest Service Capital Improvement and Maintenance,...
- This federal contract award, valued at $574,800.00, was issued by the U.S. Forest Service's Pacific Northwest Region (Region 6) to Ridge2River Construction LLC, a small business based in Soap Lake, Washington. The work consists of removing and disposing of four existing, failed log stringer bridges, performing construction surveying and staking, and furnishing four new refabricated steel girder trail bridges with American cedar decks and rail systems on reinforced concrete abutments. This task...
- This is a firm fixed-price federal contract awarded by the U.S. Department of Agriculture Forest Service to M R Construction, a small disadvantaged and HUBZone certified business, to replace a culvert on Forest Service road 40N39 that crosses Kelly Gulch in the Klamath National Forest near Etna, California. The contract, valued at $475,417.50, involves installing a 15-foot span by 6-foot 7-inch rise multi-plate arch culvert with a simulated streambed to allow for aquatic organism passage. This...
- The USDA Forest Service Pacific Southwest Region awarded a $537,236 firm fixed price contract to D R P Construction Company, doing business as D R Pain Construction, to replace the Lower Cow Creek Bridge located on the Sierra National Forest in California. The solicitation sought sealed proposals to demolish the existing bridge and install a new precast concrete slab structure, as described in Solicitation 129JGP20R0018. The contract is set aside for total small business participation under...
- 1291S818D0012Indefinite Delivery Contract
- 1291S818D0012-1291S819F0102Delivery Order
SCOTT RIVER & SALMON METHODIST BRIDGES - LOAD RATINGS & ANALYZE PROSPECT OF A STRENGTHENING
Posted 7/22/19
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
A/E Bridge Design & Load Rating IDIQ | 1291S8-18-R-0019 | Department of Agriculture Forest Service R5-Pacific Southwest Region | Solicitation 1/1 | 6/18/18, 12:54 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00004 | Close Out | ($32k) | 10/20/22 | |
| P00003 | Change Order | $0 | 4/30/20 | |
| P00002 | Change Order | $0 | 12/13/19 | |
| P00001 | Change Order | $0 | 10/28/19 | |
| Not listed | Not listed | $93.6k | 7/22/19 |