<p>This is a Firm Fixed Price contract awarded by the U.S. Department of Agriculture's Central Region office to TP Environmental & Pipeline Services LLC for the ARRA - Big Caney Site 18 - Rehabilitation (Remedial) project. The contract is for the repair of Floodwater Retarding Dam No. 18 in Big Caney, Kansas, with a ceiling value of $324,627.74 and an ultimate completion date of September 18, 2010. The contract was awarded on March 22, 2010 and does not have a set-aside designation.</p>
The Department of the Interior Bureau of Reclamation awarded a $331,398.73 firm fixed price contract to Big C Construction, L.L.C., doing business as Big C Construction LLC, to complete the OT-NO-ACQ-SOUTH DAM BOAT RAMP project in Norman, Oklahoma. The contract has a period of performance from September 2022 through August 2023. Designated as an 8(a) sole source set aside, the award will deliver construction services for a new boat ramp at the South Dam location. No major subcontractors were...
The USDA NRCS Central Region awarded a $8.8 million firm fixed price contract to C-P Integrated Services Inc. to rehabilitate the ARS Field Station Lake Dam in Woodward, Oklahoma. As described in the original solicitation, work will involve boring and jacking a new 30-inch principal spillway pipe through the existing dam, constructing a new principal spillway tower, building a roller compacted concrete auxiliary spillway over the top of the existing dam, disposing of the existing concrete...
Gutierrez Canales Engineering, P.C. was awarded a firm fixed price delivery order against the CANAL LINING REPAIR AND REPLACEMENT, IDIQ vehicle held by the Bureau of Reclamation. This $729,592 task order is for bypass drain concrete panel replacement in Yuma, Arizona, with work to be completed by September 30, 2021. No set-aside designation was applied to this award to replace concrete panels as part of canal infrastructure repairs and maintenance carried out by the Bureau of Reclamation in...
Ames Construction, Inc. was awarded an $8.2 million firm fixed-price definitive contract by the Bureau of Reclamation within the Department of the Interior to perform concrete repair work at the American Falls Dam in Power County, Idaho. Under the contract, Ames Construction will saw cut existing concrete, remove and replace damaged sections, and repair reinforcing steel as needed over an 18-month period of performance starting in June 2021. The Bureau of Reclamation oversees water and power...
The Bureau of Reclamation awarded a $31,658,561.08 firm-fixed-price contract to Central Environmental Inc., a minority-owned, Alaska Native Corporation and self-certified small disadvantaged business, to line a section of the Truckee Canal with concrete over a geomembrane barrier, repair/replace two check structures, and perform general repairs at the site in Fernley, Nevada. This contract was set aside for small businesses and is part of the Truckee Canal Extraordinary Maintenance (XM)...
The U.S. Bureau of Reclamation awarded a $7,628,445.09 firm fixed price construction contract to the Wemco-Garco MP JV1 joint venture to replace the tailrace semi-gantry cranes at the Grand Coulee Dam Left and Right Powerplants in Washington. The contract, which has a total small business set-aside, will involve removing the existing cranes, furnishing and installing new cranes, repairing supporting structures, replacing electrical components, and providing training. The work is expected to take...
This is a definitive contract awarded by the Bureau of Reclamation, a civilian agency within the U.S. Department of the Interior, to Battle Ridge Builders, LLC, a for-profit limited liability company, for $259,834.40 to perform repairs on the Medicine Creek Dam river outlet works stilling basin in the Frenchman-Cambridge Unit of the Pick-Sloan Missouri Basin Program in Nebraska. The contract was set aside for small businesses. Battle Ridge Builders has a history of delivering infrastructure...
This federal contract award, with a ceiling value of $240,076.20, was issued by the Central Region of the U.S. Department of Agriculture (USDA) to Hammett Excavation, Inc. The contract is for the Recovery Funded Mitigation on Caney Creek Watershed Site 3A, which involves installing two rock drop structures, fencing, and vegetating disturbed areas. The contract is a definitive, firm-fixed-price contract with a period of performance through November 3, 2010. The award did not utilize a small...
This is a firm fixed-price purchase order contract awarded by the Bureau of Reclamation, a civilian agency within the U.S. Department of the Interior, to Canepa And Sons, Inc., a self-certified small disadvantaged business. The contract is for concrete and gravel work on the New Melones Central Valley Project (CVP) retrofit and accessibility (ADA) project, with a ceiling value of $2,560.50 and a completion date of May 30, 2010. The contract was not set aside for any specific socioeconomic...