Delivery Order 12339518D0003-12339519F0006
Award Date 3/8/19
Potential Completion Date 4/17/19
Potential Value $70K
Federal Agency
Awardee
Ultimate Awardee
Not listed NAICS Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Hot Springs, VA 24445, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
1
Legislative Mandate
Service Contract Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The Department of Agriculture Forest Service Southern Region (USDA - USFS) awarded a $368,389.90 firm fixed price delivery order contract to DOT Construction, Inc. under the Great American Outdoors Act Multiple Award Task Order Contract (MATOC) vehicle. DOT Construction, Inc. will replace a failed culvert on Forest Service Road 667 (Tate Road) on the Mount Rogers National Recreation Area with an aluminum open bottom pipe culvert. The work will be performed in Whitetop, Virginia between July...
- This is a firm fixed-price federal contract awarded by the U.S. Department of Agriculture Forest Service to M R Construction, a small disadvantaged and HUBZone certified business, to replace a culvert on Forest Service road 40N39 that crosses Kelly Gulch in the Klamath National Forest near Etna, California. The contract, valued at $475,417.50, involves installing a 15-foot span by 6-foot 7-inch rise multi-plate arch culvert with a simulated streambed to allow for aquatic organism passage. This...
- The United States Department of Agriculture Forest Service, Northern Region awarded a $315,080 firm fixed price delivery order contract to Stone Ridge Construction, Inc. The project is located on Forest Road No. 282 at milepost 10.00 at the crossing of the North Fork of Little Joe Creek in Trout Creek, Montana. Improvements consist of but are not limited to the removal and salvage of the existing multi-plate steel plate arch culvert and concrete structure. The period of performance is from...
- This delivery order, awarded under the Department of Agriculture Forest Service R9-Eastern Region Roads and General Construction Multiple Award IDIQ, calls for the replacement of an existing failing stream crossing with a new larger culvert in Lily Pad Creek. Snow Country Contracting Inc., an SBA-certified HUBZone firm, will replace the culvert for $114,016.98 by May 15, 2022. The work supports the Forest Service's efforts to improve infrastructure and protect water quality in the Great Lakes...
- The U.S. Department of Agriculture Forest Service awarded a $219,160 firm fixed price delivery order to Ketchikan Ready-Mix & Quarry, Inc. to remove and dispose of an existing corrugated metal pipe on Road 3036 at milepost 0.27 in Coffman Cove, Alaska and replace it with a 55-foot structural plate arch culvert composed of a corrugated metal arch and concrete footings. The contractor will also restore the streambed upstream and downstream. There was no set-aside designation for this award...
- The U.S. Department of Agriculture Forest Service awarded a $98,117.80 firm fixed price delivery order contract to Jack Bowen Excavating of Mt Tabor, Vermont. The contract calls for the replacement of an existing five-foot diameter culvert with a new seven-foot, three-inch wide by five-foot, three-inch high by seventy-eight-foot long aluminized steel pipe arch culvert. Additional work includes removal of an existing temporary bridge and its relocation. The contract was awarded on April 26,...
- The United States Department of Agriculture Forest Service awarded a $804,530 firm fixed price delivery order contract to Rock-N-Road Construction Inc. to perform back loop aquatic organism passage construction work in Petersburg, Alaska. The work consists of removing an existing culvert on Road 3030110 at milepost 0.28 and replacing it with a 49 foot steel bridge and constructing a new simulated streambed, as well as removing an existing culvert on Road 30 and constructing the required...
- This contract, awarded by the U.S. Department of Agriculture Forest Service to Patton Excavation, a for-profit Subchapter S corporation, replaces two Civilian Conservation Corps (CCC)-era culverts and constructs two temporary bypass roads with temporary bridges on Mulky Gap Road in Gainesville, Georgia. The contract, which has a firm-fixed-price of $494,564.34, does not have a set-aside designation. The work was originally solicited as a competitive, unrestricted contract opportunity. The...
- The Department of the Army awarded a $667,072.50 firm fixed price delivery order to M & F Concrete, Inc., a minority-owned small disadvantaged business based in Manassas, Virginia, on September 24, 2025. The contract requires the contractor to remove an existing culvert and construct a replacement culvert crossing at Fort A.P. Hill, Virginia in accordance with the provided design, specifications, and typicals. The work is expected to be completed by September 23, 2026. This delivery order...
- The Department of Agriculture Forest Service awarded a $274,427 firm fixed price definitive contract to Cp&G Construction LLC, doing business as Cp&G, to complete construction of Forest Service Road 404 Cane Creek Culvert Replacement in Georgetown, South Carolina. The solicitation sought replacement of an existing 10'9" x 6'7" x 47' culvert with a new 19' x 8'2" x 46' structural plate aluminum arch culvert. With a period of performance of 180 calendar days, the...
- 12339518D0003Indefinite Delivery Contract
- 12339518D0003-12339519F0006Delivery Order
MOOMAW RD (FSR 1736) MP 1.05 CULVERT REPLACEMENT
Posted 3/8/19
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $69.6k | 3/8/19 |