Definitive Contract W912WJ25CA001

Award Date 6/9/25
Potential Completion Date 3/31/26
Potential Value $5.6M
Federal Agency
ENDIST New England
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Milbridge, ME 04658, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The U.S. Army Corps of Engineers Engineering District New England awarded a firm fixed price contract valued at approximately $1.7 million to Great Lakes Dredge & Dock Company, LLC for maintenance dredging of the Kennebec River in Phippsburg, Maine. Under solicitation number W912WJ22B0019, the contractor will dredge an estimated 1-5 million cubic yards of material from two areas of the river to maintain depths of 30 and 27 feet below mean lower low water and transport dredged materials to...
This contract award to Michels Construction, Inc. is for the maintenance dredging of the Scarborough River in Scarborough, Maine. The U.S. Army Corps of Engineers, New England District awarded this $3,139,912.00 firm-fixed-price definitive contract on October 1, 2023, with a completion date of March 11, 2024. The work involves hydraulically dredging approximately 100,000 cubic yards of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage, and placing the...
The Department of the Army Corps of Engineers, New England District awarded a $3,982,718.80 Firm Fixed Price Definitive Contract to H & L Contracting LLC for maintenance dredging of the Saco River Federal Navigation Project in Saco, Maine. The contract involved hydraulically dredging approximately 41,000 cubic yards of required dredging and 36,000 cubic yards of allowable over-depth dredging from the 8-foot deep entrance channel and three 6-foot deep anchorages at the mouth of the Saco...
The U.S. Army Corps of Engineers, New England District awarded a firm-fixed-price contract valued at $1,333,460.00 to Cashman Dredging & Marine Contracting Co LLC for maintenance dredging of the Federal Navigation Project at the Portsmouth Harbor and Piscataqua River in Newington, New Hampshire and Elliot, Maine. The work will involve using a hydraulic hopper dredge to remove approximately 40,000 cubic yards of sand and gravel from the main ship channel to a maximum depth of 40 feet below...
This definitive contract was awarded by the U.S. Army Corps of Engineers, Engineering District New England to Great Lakes Dredge & Dock Company, LLC for maintenance dredging of Portsmouth Harbor and the Piscataqua River in New Hampshire and Maine. Valued at $24.9 million, the firm fixed price contract requires removal of approximately 2,300 cubic yards of ordinary material and 691,500 cubic yards of ordinary and hard materials from the harbor channel and turning basin for disposal at...
This is a definitive contract awarded by the U.S. Army Corps of Engineers, New England District to Coastline Consulting & Development, LLC, a small disadvantaged business, for maintenance dredging of the Josias River at Perkins Cove in Ogunquit, Maine. The contract has a ceiling value of $2,556,569.60 and is a firm fixed-price contract. The dredging work involves removing approximately 10,700 cubic yards of coarse- and fine-grained material from the 7-foot deep, 40-foot-wide channel and 5-...
This is a $2,447,555.00 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers, New England District (USACE-NED) to Cashman Dredging & Marine Contracting Co LLC for maintenance dredging of the Federal Navigation Project (FNP) in the lower Kennebec River near Bath, Maine. The work, which has no set-aside designation, involves the removal of approximately 50,000 cubic yards of clean sand to restore the 27-foot deep, 500-foot wide FNP to its authorized dimensions in...
This is a $3,523,979.00 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers, New England District to Michels Construction, Inc. for maintenance dredging of the Wells Harbor Federal Navigation Project in Wells, Maine and beach fill placement. The contract has no small business set-aside. The dredging work, which must be completed between September 15 and March 15 to meet environmental restrictions, involves removing approximately 80,000 cubic yards of material from...
This is a definitive contract awarded by the U.S. Army Corps of Engineers' New England District to Coastline Consulting & Development, LLC, a self-certified small disadvantaged business, for the Annisquam River Maintenance Dredging at the Gloucester Harbor & Annisquam River in Massachusetts. The $10,682,312.09 firm fixed-price contract involves dredging approximately 140,000 cubic yards of sand to remove shoals from the channel and part of the Lobster Cove anchorage, with placement of...
The U.S. Army Corps of Engineers, New England District awarded an $8.7 million firm fixed price definitive contract to H&L Contracting LLC to perform maintenance dredging of the Newburyport Harbor Federal Navigation Project in Massachusetts. Under the contract, H&L Contracting will hydraulically dredge approximately 220,000 to 250,000 cubic yards of sediment from the 15-foot and 9-foot navigation channels in Newburyport Harbor and pump it via pipeline to an adjacent beach for disposal....

The U.S. Army Corps of Engineers, New England District awarded a $5,630,400.00 firm-fixed price contract to AGM Marine Contractors Inc. for maintenance dredging of the Narraguagus River Federal Navigation Project in Milbridge, Maine. The contract is not set aside for any specific business category.

The primary objective is to dredge approximately 150,000 cubic yards of predominantly fine-grained material from shoaled areas of the project's 11-foot deep, 150-foot-wide entrance channel; 9-foot deep, 100-foot-wide channel; and multiple anchorages. A mechanical dredge will be used to transport the material to the Douglas Island Disposal Site, approximately 2.5 miles away. The work is expected to be completed by March 31, 2026.

Generated 8/31/25, 12:57 AM