Definitive Contract W912WJ24C0018

Award Date 9/9/24
Potential Completion Date 1/1/25
Potential Value $3.2M
Federal Agency
ENDIST New England
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Westport, MA 02790, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
3
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a Definitive Contract awarded by the U.S. Army Corps of Engineers, New England District (ENDIST New England) to Atlantic Coast Tug & Marine LLC, a small disadvantaged business, for maintenance dredging of the Essex River Federal Navigation Project in Essex, Massachusetts. The contract has a ceiling value of $2,284,000.00 and is a Firm Fixed Price contract. The work consists of mechanically dredging approximately 17,500 cubic yards of sand and silty material from the 4-foot channel...
The U.S. Army Corps of Engineers, New England District awarded a $3.7 million firm fixed price definitive contract to Cashman Dredging & Marine Contracting Co LLC. The contract is for maintenance dredging of approximately 162,000 cubic yards of fine-grained sediments from the 10-foot entrance channel and anchorage of the Wellfleet Harbor Federal Navigation Project in Wellfleet, Massachusetts. Under the original solicitation, the contractor will dredge materials to the authorized project...
This is a definitive contract awarded by the U.S. Army Corps of Engineers' New England District to Coastline Consulting & Development, LLC, a self-certified small disadvantaged business, for the Annisquam River Maintenance Dredging at the Gloucester Harbor & Annisquam River in Massachusetts. The $10,682,312.09 firm fixed-price contract involves dredging approximately 140,000 cubic yards of sand to remove shoals from the channel and part of the Lobster Cove anchorage, with placement of...
This is a $7,232,500.00 definitive contract awarded by the U.S. Army Corps of Engineers, New England District to Weeks Marine, Inc. for maintenance dredging of the Cape Cod Canal in Buzzards Bay, Massachusetts. The contract, which is not set aside, requires the use of a hydraulic hopper dredge to remove approximately 80,000 cubic yards of sand and gravel from the main ship channel, East Mooring Basin, and West Mooring Basin, and place the material on Town Neck Beach in Sandwich, MA. The dredging...
The U.S. Army Corps of Engineers awarded a $742,892.94 Firm Fixed Price contract to Coastline Consulting & Development, LLC, a small disadvantaged business, for maintenance dredging of the Federal Navigation Project at Cuttyhunk Harbor in Massachusetts. The project involves removing approximately 10,000 cubic yards of sand and gravel from the 10-foot deep by 75-foot wide outer entrance channel and placing the dredged material at a previously used nearshore site. The work is expected to...
This is a definitive, firm-fixed-price contract awarded by the U.S. Army Corps of Engineers to HME Construction Inc., a small business and Alaskan Native Corporation-owned firm, for $5,471,491.50. The contract is for clamshell maintenance dredging services at six locations across Oregon and Washington, removing approximately 250,000 cubic yards of sediment from navigation channels, harbors, and waterways. An additional 60,000 cubic yards of optional dredging work may also be performed. The...
This federal contract, awarded by the U.S. Army Corps of Engineers, New England District, was for dredging Sagamore Creek in Portsmouth, New Hampshire. The contract, valued at $512,970.00, was awarded to Prock Marine Co., a small business, on a firm fixed-price basis. The original solicitation was set aside for certified small businesses only and was for the maintenance dredging of approximately 4,300 cubic yards of predominantly sandy sediment from the 6-ft navigation channel and confluence....
<p>The Department of the Army Corps of Engineers Engineering District New England awarded a Definitive Contract to Cashman / Dutra, JV, a For Profit Organization, for Improvement Dredging in Boston Harbor, Boston, MA. The contract is a Firm Fixed Price contract with a Potential Value of $137,205,675.55. The contract completion date is October 26, 2021. There was no Set-Aside used for this award.</p>
<p>This is a firm fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to J-Way Southern, Inc., a small business, for maintenance dredging. The contract has a ceiling value of $3,039,936.20 and a completion date of September 14, 2017. The contract is a definitive contract, meaning it is a stand-alone award and not part of a larger contract vehicle. The place of performance is Menemsha, Massachusetts.</p>
The U.S. Environmental Protection Agency Region 1 awarded a definitive, firm fixed-price contract to Cashman Dredging &amp; Marine Contracting Co. LLC, a for-profit limited liability company, to provide mechanical dredging and disposal construction services for the New Bedford Lower Harbor in New Bedford, Massachusetts. The contract has a potential value of $21,178,904.85 and a completion date of June 27, 2018. This contract was not set aside for any specific business type. Cashman Dredging is...

The U.S. Army Corps of Engineers, New England District awarded a Definitive, Firm Fixed Price contract for $3,229,500.00 to Land Remediation, Inc. for maintenance dredging of the Westport River in Westport, Massachusetts. This contract was set aside for small business concerns under NAICS code 237990 with a size standard of $37 million. The contract involves mechanical dredging to remove approximately 65,000 - 75,000 cubic yards of clean sand from the authorized 9-foot deep by 150 to 200 feet wide outer entrance channel, and transporting the dredged material approximately 2 nautical miles to a designated nearshore placement site. The dredging and placement work is expected to take 3-4 months to complete, and must be conducted within the available work window of September 15, 2024 to January 15, 2025.

Generated 12/13/24, 9:06 AM