The U.S. Army Corps of Engineers, New England District awarded a $487,930.76 Firm Fixed Price contract to Prock Marine Co, a small business subchapter S corporation, for dredging services at the Great Chebeague Island Federal Navigation Project in Chebeague Island, Maine. The contract is set aside for small businesses and requires mechanical dredging of approximately 4,000 cubic yards of mixed sediments from the 10-foot channel/turning area and 8-foot turning basin to specified depths and side...
Coastline Consulting & Development, LLC was awarded a definitive contract valued at approximately $1.7 million by the U.S. Army Corps of Engineers, New England District to provide maintenance dredging services for Wood Island Harbor and the Pool at Biddeford, Maine. Under the terms of the contract, Coastline will dredge approximately 35,100 cubic yards of material from the federal navigation channel and basin and dispose of it at either the Camp Ellis Nearshore Placement Site or the Saco Bay...
This is a $18,315,650.89 firm fixed price definitive contract awarded by the U.S. Navy Installations Command to Coastline Consulting & Development, LLC, a self-certified small disadvantaged business, for maintenance dredging at the Portsmouth Naval Shipyard in Kittery, Maine. The contract requires dredging of drydock berths 5/6 and 13/14, with an option to include additional work such as rock removal, marine mammal monitoring, and post-dredge surveys. This award stems from a total small...
This contract award to Michels Construction, Inc. is for the maintenance dredging of the Scarborough River in Scarborough, Maine. The U.S. Army Corps of Engineers, New England District awarded this $3,139,912.00 firm-fixed-price definitive contract on October 1, 2023, with a completion date of March 11, 2024. The work involves hydraulically dredging approximately 100,000 cubic yards of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage, and placing the...
This is a $1,546,235.04 firm fixed-price delivery order awarded to King Co Inc., a for-profit small business, by the U.S. Army Corps of Engineers (USACE) for the BURNS HARBOR DREDGING project. The work will be performed in Chesterton, Indiana and is scheduled for completion by January 27, 2025. This award is under the Great Lakes Dredging Multiple Award Task Order Contract (MATOC), a $130 million small business set-aside IDIQ contract held by USACE that covers dredging, debris removal, and...
This is a definitive contract awarded by the U.S. Army Corps of Engineers' New England District to Coastline Consulting & Development, LLC, a self-certified small disadvantaged business, for the Annisquam River Maintenance Dredging at the Gloucester Harbor & Annisquam River in Massachusetts. The $10,682,312.09 firm fixed-price contract involves dredging approximately 140,000 cubic yards of sand to remove shoals from the channel and part of the Lobster Cove anchorage, with placement of...
This definitive contract was awarded by the U.S. Army Corps of Engineers, Engineering District New England to Great Lakes Dredge & Dock Company, LLC for maintenance dredging of Portsmouth Harbor and the Piscataqua River in New Hampshire and Maine. Valued at $24.9 million, the firm fixed price contract requires removal of approximately 2,300 cubic yards of ordinary material and 691,500 cubic yards of ordinary and hard materials from the harbor channel and turning basin for disposal at...
This is a firm-fixed price contract awarded by the U.S. Army Corps of Engineers, New England District, on behalf of the U.S. Navy, to Cashman Dredging & Marine Contracting Co LLC for maintenance dredging of the Federal Navigation Project in the lower Kennebec River near Bath, Maine. The contract has a ceiling value of $2,447,555.00 and a period of performance ending on March 31, 2025. The work involves the removal of approximately 50,000 cubic yards of clean sand to restore the 27-foot deep,...
This is a Definitive Contract awarded by the U.S. Army Corps of Engineers, New England District (ENDIST New England) to Atlantic Coast Tug & Marine LLC, a small disadvantaged business, for maintenance dredging of the Essex River Federal Navigation Project in Essex, Massachusetts. The contract has a ceiling value of $2,284,000.00 and is a Firm Fixed Price contract. The work consists of mechanically dredging approximately 17,500 cubic yards of sand and silty material from the 4-foot channel...
This contract, awarded by the U.S. Army Corps of Engineers, is for $3,731,284.50 to provide maintenance dredging services for the Pigs Island Gut and Beals Harbor in Beals, Maine. The contract was awarded on March 29, 2016 to Cashman Dredging & Marine Contracting Co LLC, a for-profit limited liability company that specializes in dredging services for the U.S. government. The contract has a firm fixed price pricing type and a definitive contract type, with a completion date of April 8,...