Caven point base renovation

Ended Definitive Contract Awarded Last action

Contract number
W912QR20C0036
Awardee
Awarding agency
Obligated
$25,980,889

Award facts

Opportunity
Contract value 98% obligated
  • $25,980,889.23 Current, with exercised options
  • $26,571,739.23 Potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Full and Open Competition · 4 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Jersey City, NJ 07305, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Funding Only Action P00005 $0
Supplemental Agreement for work within scope A00039 · The scope of the project includes the full facility revitalization design of the existing united states army reserve center located at caven point, new… $39,424
Change Order A00038 · CR 43 room sign deadlock waterline & bollards (unilateral)- install elevator room sign, deadlock for bathroom, cap water line, install bollard around… $36,146
Change Order A00037 · Reference no. R00041 case 45 REA fire pumphouse (unilateral) $0
Supplemental Agreement for work within scope A00036 · CR 0053 doas unit 3 diffusers and sprinkler system - replace 3 diffuser collars and perform sprinkler system pressure and flow tests caven point base renovation $18,866
Change Order A00035 · CR 0052 kitchen hood replacement (unilateral) caven point base renovation $25,400
Change Order A00034 · CR 50 fire pumphouse relocate backflow preventer & replace steel tee with DIP caven point base renovation $67,597
Change Order A00033 · Reference no. R00038 case 0051 50A circuit supply power to hot well $16,802
Change Order A00032 · Reference no. A00032 R00037 case 48 & 49 unilateral $39,298
Supplemental Agreement for work within scope A00031 · CR 0047 stair stringer finish caven point base renovation $11,176
Supplemental Agreement for work within scope A00030 · Caven point base renovation case 0002 part 2 final $89,661
Change Order A00029 · Reference no. R00033 case 40 OMS gas regulator & bldg. 115A foor corr. $14,084
Change Order A00028 · R00033 multi cases $48,708
Supplemental Agreement for work within scope A00027 · CR 0036 return filter grills building 115A CR 0037 sprinkler system armovers supports caven point base renovation $59,282
Change Order A00026 · CR 038 elev heater detectors & vault IDS conduit caven point base renovation $10,669
Supplemental Agreement for work within scope A00025 · Change request 00034 site light poles electrical connection 00035 makeup water valve installation, HV-1 in $52,465
Supplemental Agreement for work within scope A00024 · R00028, case 0033 bldg. 115A roof drains $13,665
Supplemental Agreement for work within scope A00023 · Bldg 204 ERV unit duct work relocation $16,914
Supplemental Agreement for work within scope A00022 · CR 0031 supply offices floor discrepancy bldg 204 - change to provide rubber tile flooring instead of epoxy concrete sealer caven point base renovation $17,816
Supplemental Agreement for work within scope A00021 · CR 0032 OMS bldg. Temporary office power caven point base renovation $39,030
Supplemental Agreement for work within scope A00020 · CR 0028 ceramic tiles substrate correction at bldg 115A and CR 0029 relocation FA panel building 115 caven point base renovation $94,858
Supplemental Agreement for work within scope A00019 · CR 27, stairwell and speakers $0
Supplemental Agreement for work within scope P00004 · CR 0018-2 purchase pump and enclosure, part 2 final caven point base renovation $548,860
Supplemental Agreement for work within scope A00018 · Reference no. R00021 case 0025 bldg 204 mailroom CMU partition wall case 0026 relocation of building 204 mezzanine $26,981
Supplemental Agreement for work within scope A00017 · CR 0022 door 121C install exterior coiling door caven point base renovation $5,975
Supplemental Agreement for work within scope A00016 $32,365
Supplemental Agreement for work within scope A00015 · Caven point base renovation CR 0020 additional concrete slab B204 $15,627
Change Order P00003 · Case C0018-1 NTP part 1 aven point $530,110
Supplemental Agreement for work within scope A00014 · CR 0021 covid 19 delay - due to required material due to production delay caven point base renovation $0
Supplemental Agreement for work within scope A00013 $56,056
Supplemental Agreement for work within scope A00012 $19,981
Supplemental Agreement for work within scope A00011 $21,802
Supplemental Agreement for work within scope A00010 · Case 0013 CMU wall connection at bldg 204 caven point base renovation $41,385
Supplemental Agreement for work within scope A00009 · Case 00012 new concrete floor slab in building 204, caven point base renovation army reserve center, jersey city, NJ $93,940
Supplemental Agreement for work within scope A00008 · Case 0011 new concrete slab connection in bldg 115 caven point base, NJ $52,380
Supplemental Agreement for work within scope A00007 · Case 0010 covid 19 related time extension production and delivery of all steel delayed due to pandemic caven point base renovation $0
Supplemental Agreement for work within scope A00006 · Caven point base renovation, ARC NJ case 008 install steel shims at hollow core plank $24,933
Supplemental Agreement for work within scope A00005 · Caven point base renovation, NY case 007 remove and replace storm water line $15,691
Supplemental Agreement for work within scope A00004 · Caven point base renovation caven point NJ case 006 contaminated soil remediation $126,825
Supplemental Agreement for work within scope A00003 · Caven point base renovation caven point ARC NJ case 005 concrete sidewalk remove and replace $9,664
Supplemental Agreement for work within scope A00002 · Case 004 storm drain clean up, caven point base renovation, ARC NJ $58,808
Supplemental Agreement for work within scope A00001 $21,141
Other Administrative Action P00002 · Admin MOD to correct language in clin 0001 extended description $0
Other Administrative Action P00001 $0
Original award $23,566,504
Show all 45

About this award

The U.S. Army Corps of Engineers Louisville District awarded a $26.6 million definitive contract to Intercontinental Construction Contracting Inc. for full facility revitalization design and renovation of the Caven Point Army Reserve Center on September 16, 2020, under a firm fixed price structure with no set-aside.

Intercontinental Construction Contracting Inc. is an SBA-certified small disadvantaged business with HUBZone and 8(a) certifications. Place of performance is Jersey City, New Jersey. The project scope includes interior and exterior renovations of approximately 63,400 square feet along with HVAC, electrical, and communication upgrades to the existing facility. The ultimate completion date is October 29, 2024. The originating solicitation, posted December 27, 2019, called for full and open competition evaluated on best value trade-off between technical and price factors. NAICS code 236220 applies (commercial and institutional building construction).

Quick answers

Who was awarded contract W912QR20C0036?

W912QR20C0036 was awarded to Intercontinental Construction Contracting Inc. by ENDIST Louisville (US Army Corps of Engineers) on September 16, 2020.

How much is contract W912QR20C0036 worth?

The government has obligated $25,980,889 on W912QR20C0036. Its potential value, with all options, is $26,571,739.

Was contract W912QR20C0036 competed?

The extent of competition for W912QR20C0036 was full and open competition. The government received 4 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award