Primary facilities

Ended Definitive Contract Awarded Last action

Contract number
W912QR20C0027
Awardee
Awarding agency
Obligated
$24,232,394

Award facts

Opportunity
Contract value 94% obligated
  • $24,232,393.95 Current, with exercised options
  • $25,849,393.95 Potential, with all options
Completion date 100% complete
Current and potential, with all options
Funding agency
ENDIST Louisville US Army Corps of Engineers, Department of Defense
Set-aside
No set-aside
Competition
Full and Open Competition · 7 offers Two Step
Pricing
Firm Fixed Price
Place of performance
Warren, MI 48091, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order A00009 · Add electrical cable stands for circuits 219 and 271 $20,129
Change Order A00007 · Change duct bank route to avoid existing manhole 9. $415,420
Change Order A00008 · RE-align the gspel b feeder circuit to match the path and length of the gspel a feeder. -$112,218
Change Order A00006 · Eliminate unnecessary electrical conductors in switchgear feeders to gspel. -$191,635
Change Order A00005 · Double the number of conductors for circuits 06 and 16. Provied DE-energization support for the transformer replacement at building 215. $207,034
Change Order A00004 · Time extension to account for excusable delay associated with post-pandemic supply chain disruptions. $0
Change Order A00003 · Contract modification to require connection of building 270 to primary power from the 13.2 KV grid instead of from the old 4.6 KV power cable. $218,924
Change Order A00002 · Change to remove the requirement to use sections of existing power distribution cable which were found to be unsuitable. Also adding provision of temporary… $354,293
Supplemental Agreement for work within scope A00001 · Change to the contract scope of work to allow the contractor to design and construct around a government-caused interference. Schedule extended to compensate… $310,446
Exercise an Option P00002 · Primary facilities exercise option 4 $666,000
Other Administrative Action P00001 · Issuance of notice to proceed and contract transfer $0
Original award $22,344,000
Show all 12

About this award

This is a $25,849,393.95 definitive, firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) Louisville District to Walsh Motor City JV for the design and construction of a high-voltage substation and secondary switchgear at the Detroit Arsenal. The contract was awarded on July 21, 2020 with a completion date of September 20, 2024. This award was the result of a full and open competition, with no set-aside designation. The contract scope includes construction of medium and lower voltage infrastructure, site development and improvements, and supporting facilities such as utilities, paving, and communications. This project falls under NAICS code 237130 for Power and Communication Line and Related Structures Construction, with an estimated value between $10-25 million.

Quick answers

Who was awarded contract W912QR20C0027?

W912QR20C0027 was awarded to Walsh Motor City JV by ENDIST Detroit (US Army Corps of Engineers) on July 21, 2020.

How much is contract W912QR20C0027 worth?

The government has obligated $24,232,394 on W912QR20C0027. Its potential value, with all options, is $25,849,394.

Which agency awarded contract W912QR20C0027?

ENDIST Detroit (US Army Corps of Engineers) awarded W912QR20C0027, with funding from ENDIST Louisville (US Army Corps of Engineers).

Was contract W912QR20C0027 competed?

The extent of competition for W912QR20C0027 was full and open competition. The government received 7 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award