FT. Totten award

Ended Definitive Contract Awarded Last action

Contract number
W912QR10C0021
Awardee
Awarding agency
Obligated
$9,200,064

Award facts

Opportunity
  • W912QR09R0072 Solicitation number
Contract value 100% obligated
$9,200,063.83 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y199 Construct/Misc Bldgs
Set-aside
Total Small Business
Competition
Full and Open Competition after exclusion of sources · 4 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Flushing, NY 11359, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope A00021 · Case 053 install 1 wall-mounted light vapor with 75W bulb in tamperproof cage above arms vault door, room 1025, building 200 renovation, U.S. Armed forces… $1,323
Supplemental Agreement for work within scope A00020 · Case 052 credit for shelving not provided due to errors in measurement and problem with delivery of caging material, brac renovation of building 200, U.S. Armed… -$2,842
Change Order A00019 $7,772
Supplemental Agreement for work within scope A00018 · Case 037 install additional parts to make existing door closers and exit devices compatible with newly installed doors, building 200 renovation, U.S. Armed… $3,400
Supplemental Agreement for work within scope A00017 · Case 049 credit modification for removal of requirement to disinfect fire protection system by means of chlorination, building 200 renovation, U.S. Armed forces… -$5,330
Supplemental Agreement for work within scope A00016 · Case 048 credit modification for sprinklers eliminated from installation in existing arms vault room, building 200 renovation, U.S. Armed forces reserve center,… -$1,863
Supplemental Agreement for work within scope A00015 · Case 041 install additional 70' galvanized chain link fence to the security perimeter at the military equipment parking lot, building 200 renovation, U.S.… $2,900
Supplemental Agreement for work within scope A00014 · Case 040 replace coat racks, building 200 renovation, U.S. Armed forces reserve center, FT. Totten, NY $5,291
Supplemental Agreement for work within scope A00013 · Case 039 install additional fiber strands on 3RD floor, building 200 renovations, FT. Totten, NY $8,200
Supplemental Agreement for work within scope A00012 · Case 34 removal and disposal of contaminated soil from military equipment parking lot, building 200 renovation, U.S. Armed forces reserve center, FT. Totten, NY $310,400
Supplemental Agreement for work within scope A00011 · Case 033 reroute electrical and telecommunications conduits encountered during cutting of slab for elevator shaft on 2ND and 3RD floors; case 035 settlement… $80,430
Supplemental Agreement for work within scope A00010 · Case 025 extend ceiling to existing mechanical room wall; case 031 lower existing pipe to provide 40" of cover, brac U.S. Armed forces reserve center… $59,803
Supplemental Agreement for work within scope A00009 · Case 036 provide electrical and telecommunications service to proposed workstations in common rooms 202 & 215; case 038 lower elevation of conduit to resolve… $44,000
Change Order A00008 · Case 021 unsuitable soil removal and disposal at unheated storage building; case 024 unsuitable soil removal and disposal at military equipment parking lot,… $143,000
Supplemental Agreement for work within scope A00007 · Case 011 changes to existing walls, case 012 reroute buried utilities, case 013 modify lockers to be double-tier, building 200 renovation, FT. Totten, NY $40,300
Supplemental Agreement for work within scope A00005 · Remove and dispose of petroleum-contaminated soil and water; reroute lighting conduit, building 200 renovation, FT. Totten, NY $49,700
Supplemental Agreement for work within scope A00006 · Change contract plan to reflect encountered existing overflow pipe during excavation for POV lot #2, building 200 renovation, FT. Totten, NY $19,500
Supplemental Agreement for work within scope A00004 · Remove/replace existing pipe insulation, part II final, building 200 renovation, FT. Totten, NY $191,449
Supplemental Agreement for work within scope A00003 · Provide services of site safety and health officer; install fire doors; provide CMU walls; construct additional soffits; provide shower pans; extend wall;… $101,335
Change Order P00001 · Remove and replace existing pipe insulation, part i supplement i, building 200 renovation, U.S. Armed forces reserve center, FT. Totten, NY $133,395
Change Order A00002 · Remove/replace existing pipe insulation, building 200 renovation, FT. Totten, NY $75,000
Supplemental Agreement for work within scope A00001 · Relocation of electrical panels and ductwork, building 200 renovation, FT. Totten, NY $43,901
Original award $7,889,000
Show all 23

Quick answers

Who was awarded contract W912QR10C0021?

W912QR10C0021 was awarded to APS Contracting Inc. by ENDIST Louisville (US Army Corps of Engineers) on December 15, 2009.

How much is contract W912QR10C0021 worth?

The government has obligated $9,200,064 on W912QR10C0021.

Was contract W912QR10C0021 competed?

The extent of competition for W912QR10C0021 was full and open competition after exclusion of sources. The government received 4 offers. It was set aside: Total Small Business.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award