Definitive Contract W912PM22C0017

Award Date 11/16/22
Potential Completion Date 12/12/23
Potential Value $7.9M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST Wilmington
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Federal Contract Vehicle
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Wilmington, NC 28403, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a federal contract award to Southwind Construction Corp, a small business, by the U.S. Army Corps of Engineers' Wilmington District. The contract is for $2,508,887.77 for maintenance dredging of the Atlantic Intracoastal Waterway between Bear Inlet and Shallotte Inlet in North Carolina. The work is to be completed by May 20, 2010. Southwind Construction is an experienced dredging contractor that has previously performed similar work for the Army Corps of Engineers across the Southeastern...
This is a federal contract award from the U.S. Army Corps of Engineers' Wilmington Engineering District to Southwind Construction Corporation, a for-profit small business. The contract is for dredging work on the Atlantic Intracoastal Waterway near Wilmington, North Carolina, with a potential value of $5,464,602.85. The contract is a definitive contract with a firm fixed price pricing type, and has a completion date of August 30, 2019. Southwind Construction has previously performed similar...
The U.S. Army Corps of Engineers, Wilmington District awarded Southwind Construction Corporation a $2.5 million firm fixed price delivery order against its 2019 Master IDIQ contract for Dredging and Shore Protection services. The order is for maintenance dredging of approximately 15 miles of the Atlantic Intracoastal Waterway between New Hanover County and Shallotte in North Carolina. Southwind will dredge the inland waterway to authorized depths and dispose of dredged materials pursuant to...
The U.S. Army Corps of Engineers, Wilmington District awarded Southwind Construction Corporation a $5.4 million firm fixed price delivery order against its 2019 Multiple Award Construction Contract for Dredging and Shore Protection services. The order is for maintenance dredging of the Atlantic Intracoastal Waterway between Beaufort, North Carolina and Topsail Beach, North Carolina. Southwind Construction Corporation will dredge approximately 12 miles of the inland waterway to specified depths...
This is a $13,868,185.92 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Southwind Construction Corp, a small business, for fiscal year 2025 maintenance dredging of the Atlantic Intracoastal Waterway (AIWW) between Wilmington and Ocean Isle Beach, North Carolina. The contract involves removing shoaled material from the 12-foot AIWW channel and placing the dredged material on approved ocean beaches and disposal islands. This work supports the Corps' civil works...
The U.S. Army Corps of Engineers, Wilmington District awarded a $4.763 million firm-fixed-price contract to Southwind Construction Corp for maintenance dredging services along the Atlantic Intracoastal Waterway between Morehead City and Shallotte, North Carolina. The contract is for the removal of approximately 300,000 cubic yards of accumulated shoaled material from channels to a depth of 12 feet plus 2 feet of allowable overdepth, with dredged material to be placed at approved ocean beaches...
This is a $6,804,848.44 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Southwind Construction Corp, a small business, for FY16 maintenance dredging of the Atlantic Intracoastal Waterway. The contract has a period of performance through July 2017 and was set aside for small businesses. Southwind Construction has previously performed dredging projects for the Army Corps along inland waterways and at port facilities across the Southeastern U.S. to maintain...
This is a definitive, firm-fixed price contract awarded by the U.S. Army Corps of Engineers' Charleston District to Southwind Construction Corp, a small business prime contractor, for maintenance dredging of the Atlantic Intracoastal Waterway. The $2,650,480.86 contract has a period of performance through March 31, 2016. Southwind Construction holds an indefinite-delivery, indefinite-quantity (IDIQ) contract with the Army Corps for dredging and shore protection services. This waterway dredging...
The U.S. Army Corps of Engineers, Wilmington District awarded a $13.6 million firm fixed price contract to Marinex Construction Inc. to provide maintenance dredging of the Wilmington Harbor Inner Ocean Bar in Brunswick County, North Carolina. Per the original solicitation, the contractor will dredge approximately 1,000,000 cubic yards of shoaled material from Bald Head Shoal Channel Reaches 1 and 2 to a depth of 44 feet plus 2 feet of allowable over-depth, disposing of the material on Bald...
The U.S. Army Corps of Engineers, Wilmington District awarded a $6.4 million firm fixed price contract to Southern Dredging Co Inc. to provide maintenance dredging of navigation channels in the upper Wilmington Harbor, North Carolina. Per the original solicitation, the contract requires the removal of approximately 1.4 million cubic yards of shoaled material accumulated in reaches including the Anchorage Basin, Between Channel, 32-foot Turning Basin, and berth areas of the North Carolina State...

Southwind Construction Corp has been awarded a $7,878,339.05 firm fixed price contract by the U.S. Army Corps of Engineers for maintenance dredging of the Atlantic Intracoastal Waterway North in Wilmington, North Carolina. Under the terms of the contract, which has a completion date of December 12, 2023, Southwind Construction will remove approximately 550,000 cubic yards of sediment that has accumulated in the channel since the last dredging, deepening it to a depth of 12 feet plus 2 feet of allowable overdepth between Wilmington and Shallotte. Dredged materials will be disposed of on approved ocean beaches and confined disposal islands between November 16 and March 31 or April 30 depending on location. This contract was awarded under Southwind Construction's Multiple Award Construction Contract with the Army Corps of Engineers for dredging and shore protection services.