This federal contract award was issued by the Marine Air Ground Combat Center, a defense agency, to Cardno Tec-Aecom Atlantic Joint Venture, a large, foreign-owned, for-profit organization. The contract, valued at $99,003.85, is a Firm Fixed Price Delivery Order for a "NEW WATER TREATMENT PLANT SUPPLEMENTAL ENVIRONM" project. It does not have a set-aside designation. The contract is associated with a larger $75 million Indefinite Delivery/Indefinite Quantity (IDIQ) contract held by...
This is a $1,005,511 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to Extreme Coatings Inc., doing business as ECI Services, a Small Business Administration (SBA) certified Women-Owned Small Business and self-certified Small Disadvantaged Business. The contract is for the construction of a water treatment and nitrate removal facility, as well as a potable water storage tank at Charbonneau Park, Ice Harbor Dam in Burbank, Washington. The project involves the...
This is a $15,645,824.00 firm fixed-price design-build contract awarded by the Bureau of Reclamation, a civilian agency within the U.S. Department of the Interior, to MGC Contractors, Inc. for the expansion of the Brackish Groundwater National Desalination Research Facility (BGNDRF) treatment building in Alamogordo, New Mexico. The contract was not set aside for any specific business size or type. The contract involves designing and constructing two raw water flow equalization tanks, two raw...
This is a firm fixed-price purchase order awarded by the U.S. Army Corps of Engineers (USACE) to Freeman Water Treatment of MS, LLC, a self-certified small disadvantaged business. The contract, valued at $248,909.31, is for continuous and uninterrupted provision of clean water purified by reverse osmosis and carbon filtration technology to support the USACE's Engineer Research and Development Center's (ERDC) ongoing research and development activities. The contract has no set-aside designation...
This contract was awarded by the Department of the Army Installation Management Command Europe Region to Ems Water Technology S.R.L., a for-profit organization, to perform construction work modifying the Depot Waste Water Treatment Plant located at Darby Military Community in Livorno, Italy. The contract has a firm fixed-price of $91,347.81 and a completion date of August 28, 2023. The work involves designing, constructing, testing, and commissioning a denitrification phase for the existing...
This is a firm fixed price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE) Los Angeles District to HDR-CDM, a Joint Venture, for $1,095,700.00. The contract is for the final design, design documents, and a construction cost estimate for the Perris II Desalter Well Pumping Facilities, Brine, and Off-Site Water and Sewer Pipeline Projects in Perris, California. The work is funded through the USACE's Operations and Maintenance, General appropriation account. There is...
This is a firm-fixed-price delivery order contract awarded by the Department of Defense to Engineering Design Technologies, Inc., a minority-owned small disadvantaged business. The contract, valued at $3,143,098.00, is for the construction of Potable Water Well #12 in Herlong, California. The contract was set aside for small businesses. Engineering Design Technologies, Inc. has previously served as a subcontractor on several federal contracts, providing architectural, engineering, and...
This is a firm fixed-price delivery order contract awarded on December 24, 2020 by the U.S. Army Corps of Engineers to EA Engineering, Science, and Technology, Inc., PBC, a for-profit environmental consulting and engineering firm. The contract is for the Bonita Peak Mining District Water Treatment Plant (BPMD WTP) project in San Juan County, Colorado. The total contract ceiling value is $10,088,714.96 with a performance period through November 30, 2025. This contract falls under the Department...
This is a Firm Fixed Price Delivery Order awarded by the U.S. Army Corps of Engineers (USACE) to Arcadis U.S., Inc., a foreign-owned, for-profit organization, for groundwater recirculation, site-wide dual-phase extraction (DPE) optimization, ozone sparge evaluation and optimization at the Oasis Fuel Point Site in Fort Drum, New York. The contract has a ceiling value of $6,664,192.79 and a completion date of August 17, 2020. This award is not associated with a set-aside program. Arcadis U.S.,...
This is a delivery order contract awarded by the U.S. Department of Defense's Southwest Region to Ch2M Hill, Inc., an engineering and construction firm, for $314,206.00. The contract is for water and wastewater capital improvement projects at Fort Irwin, California, and was awarded on November 5, 2015 with a completion date of January 29, 2016. This delivery order is part of a larger indefinite delivery/indefinite quantity (ID/IQ) contract vehicle that Ch2M Hill holds with the Department of...
DESIGN BUILD - EDR WATER TREATMENT AND SYSTEM DESIGN AND CONSTRUCTION ACTIVITIES INCLUDING BUT NOT LIMITED TO THE DESIGN BUILD OF A 6.0 MILLION GALLONS PER DAY (MGD) EDR WATER TREATMENT PLANT. THE PLANT WILL TREAT ALL CONTAMINANTS FOUND IN FORT IRWIN'S GROUND WATER IN ACCORDANCE WITH (IAW) FEDERAL AND STATE REQUIREMENTS (I.E.: ARSENIC, FLUORIDE, AND TOTAL DISSOLVED SOLIDS). THE PLANT WILL INCLUDE AN ELECTRO-DIALYSIS REVERSAL (EDR) SYSTEM AS PRIMARY TREATMENT. THE PROJECT ALSO INCLUDES THE CONSTRUCTION OF THE EDR FACILITY WITH PUMPS, EDR STACKS, FILTERS, AND AN EDR WASTE EQUALIZATION TANK. THE PLANT ALSO INCLUDES TREATMENT OF THE WASTE STREAM TO ACHIEVE 99.8% POTABLE WATER RECOVERY RATE WITH REJECT DISCHARGE TO EVAPORATION PONDS. CONSTRUCTION ALSO INCLUDES A 1 MILLION GALLON (MG) PRETREATMENT TANK AND A 1 MG CLEAR WELL TANK. PROJECT ALSO INCLUDES CONTROL BUILDING, CHEMICAL BUILDING, TREATED WATER PUMP STATION, PROCESS DRAIN PUMP STATION, STANDBY GENERATOR, PROCESS PIPING, AND SCADA. THE PROJECT INCLUDES SUPPORTING UTILITIES AND INFRASTRUCTURE UPGRADES TO THE WATER PLANT INCLUDE ELECTRIC SERVICE, SITE IMPROVEMENTS, COMMUNICATIONS, WATER, SEWER, GAS, STORM WATER DRAINAGE AND ANTITERRORISM MEASURES. COMMISSIONING OF THE WATER TREATMENT PLANT IS ALSO INCLUDED. THE WATER SYSTEM IMPROVEMENTS INCLUDE PIPELINES CONNECTING THE WATER PLANT TO BICYCLE LAKE BOOSTER STATION, REPLACEMENT OF EXPIRED PIPE AND EQUIPMENT, AND WATER SUPPLY /DISTRIBUTION SYSTEM EXPANSION. OTHER SYSTEM IMPROVEMENTS INCLUDE IMPROVEMENT OF FIRE FLOW, INSTALLATION OF A NEW WATER WELL AT LANGFORD LAKE AND CONNECTING IRWIN BASIN WELLS TO RAW WATER TRANSMISSION LINES. TANK CONSTRUCTION INCLUDES REHABILITATION OF EXISTING WELDED STEEL WATER STORAGE TANKS AND REPAIR/REPLACEMENT OF A 1 MG ABOVE GROUND WATER STORAGE TANK. SUSTAINABLE DESIGN AND DEVELOPMENT (SDD), ENERGY INDEPENDENCE AND SECURITY ACT (EISA) OF 2007, AND ENERGY POLICY ACT OF 2005 (EPACT05) FEATURES WILL BE INCLUDED.