Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Texas City, TX 77590, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
9
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
The Department of the Army awarded a $3,961,071.29 definitive contract to Maverick Constructors, LLC for construction improvements to Placement Areas No. 5 and 6 on the Texas City Ship Channel on March 17, 2026, under a total small business set-away.
Work includes a 3-foot dike raise, outfall structure repair, and potential ditching and dewatering work at the site in Texas City, TX. The scope encompasses mobilization and demobilization, clearing and grubbing, semi-compacted containment dike construction using onsite soil, stripping, turfing, walkway demolition and installation, as-built drawings, final condition surveys, and onsite borrow soils geotechnical evaluation. Ultimate completion is scheduled for June 8, 2027.
The contract is priced firm fixed price. Maverick Constructors' bid of $3,961,071.29 was 17.49% below the government estimate of $4,801,000 and the lowest of nine responsive bids; bids ranged from $2,325,000 to $8,022,112.35. The FAR 36.204(g) disclosure indicates the estimated project price range is between $5,000,000 and $10,000,000. The U.S. Army Corps of Engineers, Galveston District, issued the solicitation on November 4, 2025, with a bid opening of December 19, 2025.