Definitive Contract W912ES24C0008

Award Date 2/27/24
Potential Completion Date 3/12/27
Potential Value $14M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST St Paul
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Federal Contract Vehicle
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Horace, ND 58047, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
3
Legislative Mandate
Walsh Healy Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The U.S. Army Corps of Engineers awarded a $22,335,599.70 Firm Fixed Price contract to HSG Park Joint Venture 2, LLC, a woman-owned small business, for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The contract, which has an ultimate completion date of August 31, 2027, involves the construction of a 1.7-mile-long embankment section, installation of utility crossings, and other civil engineering tasks. This contract is a total small business...
This is a $6,271,279.39 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to HB Construction Inc., doing business as Hill Brothers Construction, for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-2A in Horace, North Dakota. The project involves constructing approximately 1-3/4 miles of earthen dam embankment with a gravel road, turf reinforcement, ditches, and removal of an existing gravel road and water line. This...
The U.S. Army Corps of Engineers, St. Paul District awarded a firm-fixed price contract to PWS Inc., a minority-owned and small disadvantaged business, for the construction of the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4 in Comstock, Minnesota. The contract, valued at $23,893,746.95, calls for the construction of 5.8 miles of dam embankment, associated structures and features, including four road crossings, two drop structures, and a field...
This is a $44,007,758.15 Firm Fixed Price definitive contract awarded by the U.S. Army Corps of Engineers, St. Paul District to R.j. Zavoral & Sons, Inc. for the construction of the Fargo Moorhead Metropolitan (FMM) Area Flood Risk Management Project, Southern Embankment Reach SE-2B. The project involves building an earth dam embankment with gravel road, turf reinforcement, and other associated drainage and utility work over a 4.2 mile stretch in Cass County, North Dakota. The contract has...
The U.S. Army Corps of Engineers awarded a $2,956,514.79 firm-fixed-price contract to Tunheim Construction, LLC, a minority-owned small business, for the FMM Southern Embankment Reach SE-1 project. This project, which is part of the Fargo Moorhead Metropolitan Area Flood Risk Management initiative, involves the construction of a 2-mile earth dam embankment with associated infrastructure such as roads, culverts, drainage features, and gates. The contract is a total small business set-aside,...
The U.S. Army Corps of Engineers awarded a $7,783,006.40 firm-fixed-price contract to HSG Park Joint Venture, LLC, a woman-owned small business, for the Drayton Dam Project. This work involves replacing an existing dam with a new structure that includes a rock fish passageway to improve biotic connectivity as a mitigation measure for the Fargo-Moorhead Metropolitan Area Flood Risk Management Project. The contract was set aside for total small business and will be performed in Drayton, North...
The Department of the Army Corps of Engineers awarded a $4.2 million firm fixed price contract to HSG Park Joint Venture, LLC for wetland restoration work as part of the Fargo Moorhead Metropolitan Area Flood Risk Management Project. The solicitation sought bids for base scope work and optional additional demolition, excavation, and installation of temporary cover crops to restore wetlands in Drain 27 near Horace, North Dakota. As a total small business set-aside, the contract supports the...
The U.S. Army Corps of Engineers has awarded a $12,831,320.83 Firm Fixed Price contract to Hendrickson Transportation LLC, a small business, for the Oxbow, Hickson, and Bakke Ring Levee construction as part of the Fargo-Moorhead Metropolitan Flood Risk Management Project. The contract has a completion date of September 24, 2025. The project scope includes earthwork, excavation, storm sewer piping, riprap placement, and turf establishment for the levee system. This award is a result of the Corps'...
The U.S. Army Corps of Engineers awarded a $10,097,097 firm-fixed-price contract to Bcss, LLC, an Alaskan Native Corporation-owned small business, for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5. The project involves the construction of a 1.8-mile overflow earth dam embankment with soil-cement mixture and gravel road, as well as replacement of the existing Highway 75 intersection and culverts at Wolverton Creek. The contract was set aside...
This is a $117,340,854.48 firm-fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Ames Construction, Inc. for the construction of the Red River Structure of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project. The contract has an ultimate completion date of April 29, 2027 and does not have a set-aside designation. Ames Construction, a for-profit subchapter S corporation, has experience delivering major flood control and civil infrastructure projects for...

This is a firm-fixed price contract awarded by the U.S. Army Corps of Engineers, St. Paul District to HSG Park Joint Venture 2, LLC, a woman-owned small business, for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-1B. The contract is valued at $14,074,940.79 and has a total small business set-aside designation. The contract requires the construction of approximately 0.5 miles of earthen dam embankment, relocation of two county roads including a roundabout, and related ditching work. The embankment material will come from adjacent borrow sites and a stockpile near Fargo. This contract is part of the larger Fargo Moorhead Metropolitan Area Flood Risk Management Project, which aims to provide flood risk management for the Fargo-Moorhead metropolitan area.

Generated 11/25/24, 9:21 AM