This is a firm fixed price delivery order contract awarded by the U.S. Army Corps of Engineers to Occi, Inc., a for-profit manufacturer and Subchapter S Corporation doing business as Missouri Fabricators. The $50,964,619.12 contract is for pier rehabilitation and structural column repair work at the LD24 dam site in Mitchell, Illinois. The work includes replacing tainter gate chains and machinery, painting and repairs to tainter gates and service bridges, service bridge column replacements,...
This is a $2,581,433.67 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Occi, Inc., a for-profit manufacturer and Subchapter S Corporation doing business as Missouri Fabricators. The contract is for the fabrication and delivery of intake gates and spare roller chains to support the agency's TAS (Total Asset Visibility) Recovery program. The contract does not have a set-aside designation. Occi, Inc. has previously been awarded other infrastructure repair and...
This contract was awarded by the U.S. Army Corps of Engineers to Fickett Structural Solutions Inc., a small business subchapter S corporation based in Middleton, Wisconsin. The $172,745.77 firm-fixed-price purchase order is for submittal reviews related to the fabrication of hydraulic steel structures such as miter gates, tainter valves, and roller gates used in locks and dams. The contract is a follow-on to two Indefinite Delivery Contracts (IDCs) previously awarded to Fickett Structural...
This $1,648,800 firm-fixed-price contract was awarded by the U.S. Army Corps of Engineers to Johnson Machine Works, Inc., a small business manufacturer, to fabricate and deliver three tainter valves, six trunnion foot and pin sets, and six wire ropes for Lock 13 on the Mississippi River. The contract was set aside for small businesses and was issued under a pre-solicitation notice that sought these supplies for a navigation, flood control, and water retention project. Johnson Machine Works has...
This $8,290,117.84 firm-fixed price delivery order was awarded to Alberici Constructors Inc., a diversified construction firm, by the U.S. Army Corps of Engineers (USACE) St. Louis District for the rehabilitation of Lock and Dam No. 25 dam gates. The contract, which had no set-aside designation, supports the USACE's civil works mission for water infrastructure maintenance along the Mississippi River. Alberici has extensive experience as a prime contractor for the USACE, having completed past...
The U.S. Army Corps of Engineers - Rock Island District (MVR) awarded a $2,066,324.00 firm-fixed-price contract to CMS Infrastructure LTD., a small business joint venture, for the design, fabrication, and delivery of Fiberglass Reinforced Polymer (FRP) Tainter Valves for Lock 16 on the Upper Mississippi River. The contract was awarded on October 31, 2024, with a completion date of April 24, 2025. The contract was set aside for small businesses and was competed under Lowest Price Technically...
This is a $10,352,476.00 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers Kansas City District to Occi Inc., a for-profit subchapter S corporation, for the modification of Tainter gates. The contract has an ultimate completion date of January 30, 2010. Occi Inc. has extensive experience in marine and heavy construction, including past contracts with the Corps of Engineers for lock and dam rehabilitation, steel repair, and bridge construction. This contract does...
This is a task order awarded by the U.S. Army Corps of Engineers (USACE) to Alberici Constructors Inc., a prime contractor, for the Lock and Dam (LD) 25 dam gates and service bridge project. The $1,816,322.93 firm-fixed-price task order, which does not have a set-aside designation, supports the USACE's civil works mission for water infrastructure maintenance along the Mississippi River. The work involves miter gate installation, machinery and electrical system overhaul, concrete demolition,...
<p>This is a $116,500.00 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Coastal Metal Works LLC, a small business manufacturer, for the provision of a lock valve bulkhead no. 1. The contract was set aside for total small business participation and has an ultimate completion date of June 21, 2016. The contract was awarded on September 21, 2015 and is being performed in Picayune, Mississippi.</p>
This is a firm-fixed-price purchase order awarded by the U.S. Army Corps of Engineers to General Manufacturing LLC, a small business manufacturer based in Melrose Park, Illinois. The contract is valued at $291,935.00 and requires the fabrication and delivery of six sets of wicket gate lock components and two spare sets for hydroelectric powerhouses at the Little Goose and Lower Granite Dams in Washington. The original solicitation was a total small business set-aside designated under NAICS...