This is a firm-fixed-price construction contract awarded by the U.S. Army Corps of Engineers (USACE), St. Paul District, to Davidson Construction, Inc., a SBA-certified HUBZone small business. The $2,149,081.75 contract is for the ROSEAU FLOOD RISK MANAGEMENT, REACH 2A project, which includes construction of approximately 6,400 linear feet of earth levees, 4,800 linear feet of diversion channel, and an outlet structure into the Roseau River near the confluence with Hay Creek. The project is...
<p>The U.S. Army Corps of Engineers, Savannah District (ENDIST Savannah) awarded a firm-fixed-price definitive contract (W912ES16C0007) to The Spruce Valley Corporation, a certified HUBZone small business, for the Roseau Diversion Channel Plug Removal and Repair project in Roseau, Minnesota. The $351,732.12 contract has an ultimate completion date of November 30, 2016. The Spruce Valley Corporation is the prime contractor for this defense-related project.</p>
This is a $44,007,758.15 Firm Fixed Price definitive contract awarded by the U.S. Army Corps of Engineers, St. Paul District to R.j. Zavoral & Sons, Inc. for the construction of the Fargo Moorhead Metropolitan (FMM) Area Flood Risk Management Project, Southern Embankment Reach SE-2B. The project involves building an earth dam embankment with gravel road, turf reinforcement, and other associated drainage and utility work over a 4.2 mile stretch in Cass County, North Dakota. The contract has...
The U.S. Army Corps of Engineers awarded a $69.1 million firm fixed price definitive contract to Industrial Builders Inc. to complete the I-29 Grade Raise and Borrow Ditch Crossing portion of the larger Fargo Moorhead Metropolitan Area Flood Risk Management Project. The contract involves raising approximately 5.6 miles of Interstate 29 in North Dakota out of the 500-year flood elevation, including bridges, a bypass road, and sections of two county roads. No set-aside designation was used for...
The Department of the Army Corps of Engineers awarded a $4.2 million firm fixed price contract to HSG Park Joint Venture, LLC for wetland restoration work as part of the Fargo Moorhead Metropolitan Area Flood Risk Management Project. The solicitation sought bids for base scope work and optional additional demolition, excavation, and installation of temporary cover crops to restore wetlands in Drain 27 near Horace, North Dakota. As a total small business set-aside, the contract supports the...
This is a $117,340,854.48 firm-fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Ames Construction, Inc. for the construction of the Red River Structure of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project. The contract has an ultimate completion date of April 29, 2027 and does not have a set-aside designation. Ames Construction, a for-profit subchapter S corporation, has experience delivering major flood control and civil infrastructure projects for...
The U.S. Army Corps of Engineers, Detroit District awarded a firm fixed price contract valued at approximately $1.3 million to Roen Salvage Co. for maintenance dredging of the Duluth-Superior federal navigation channel in Duluth, Minnesota. Under the terms of the contract, Roen Salvage will dredge approximately 600,000 cubic yards of material from three designated areas to required project depths and place the dredged material along Minnesota Point as beach nourishment by November 7, 2021. The...
The U.S. Army Corps of Engineers, St. Paul District awarded a firm-fixed price contract to PWS Inc., a minority-owned and small disadvantaged business, for the construction of the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4 in Comstock, Minnesota. The contract, valued at $23,893,746.95, calls for the construction of 5.8 miles of dam embankment, associated structures and features, including four road crossings, two drop structures, and a field...
This is a $64,054,206.40 firm-fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Ames Construction, Inc. for the construction of the Wild Rice River Structure, which is part of the Fargo Moorhead Metro Area Flood Risk Management Project. The contract does not have a set-aside designation. The scope of work includes constructing a gated water control structure, dam walls, a vehicle service bridge, stilling basin, and other related infrastructure. Ames Construction is a...
This is a $10,097,097.00 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE), St. Paul District to Bcss, LLC, an Alaskan Native Corporation-owned small business, for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5. The project involves the construction of an approximately 1.8-mile overflow earth dam embankment with soil-cement mixture and gravel road, as well as replacement of the existing Highway 75 intersection and...