Island 8 parcel 2 seepage remediation

Active Definitive Contract Awarded Last action

Contract number
W912EQ21C0020
Awardee
Awarding agency
Obligated
$8,613,340

Award facts

Opportunity
Contract value 100% obligated
$8,613,340.15 Current and potential, with all options
Completion date 92% complete
Current and potential, with all options
Contracting staff
Funding agency
Department of the Army Department of Defense
Set-aside
Service-Disabled Veteran-Owned Small Business
Competition
Full and Open Competition after exclusion of sources · 5 offers Sealed Bid
Pricing
Firm Fixed Price
Place of performance
Fulton, KY 42041, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope A00012 · RMS modification reference no. R00012 RMS change request no. CA012 bollards and concrete padscontract amount (INCREASED): $8,613,340.15CONTRACT completion… $308,731
Supplemental Agreement for work within scope A00011 · Plan sheet G-003 was RE-issued on 11/15/2023 with a revised well table. Revised well table reflects an adjustment to well discharge invert elevations on all… $107,500
Supplemental Agreement for work within scope A00010 · Ditch 2 bank erosion. Repair with bedding material and riprap. $52,208
Supplemental Agreement for work within scope A00009 · This construction change is necessary to repair the damaged culvert, prevent future erosion, and ensure the product meets the contract requirements. The… $42,205
Supplemental Agreement for work within scope A00008 · This modification is necessary to increase the contract period of performance by 122 calendar days to account for excusable delays to the contract work… $0
Supplemental Agreement for work within scope A00007 · This construction change is necessary to implement an additional layer of protection to the pipe joints in an effort to mitigate the infiltration of sediment… $186,157
Supplemental Agreement for work within scope A00006 · This construction change is necessary to prevent minor inflow of water and material through the pipe joints. The structures at the elevations and grades shown… $40,971
Supplemental Agreement for work within scope A00005 · To increase the period of performance by 79 calendar days for excusable delays to the contract work resulting from adverse weather, low groundwater, and high… $0
Funding Only Action A00004 · This modification is for funding and payment purposes only and does not change the substantive rights of the contracting parties. This modification is necessary… $25,053
Funding Only Action A00003 · This construction change is necessary to ensure that there is no erosion of the levee TOE, and that sediment does not infiltrate the open wells during the… $17,206
Supplemental Agreement for work within scope A00002 · This construction change is necessary to install the structures and pipe at the elevations and grades shown on the drawings. $39,528
Supplemental Agreement for work within scope A00001 · This construction change is necessary to install the structures at the elevations and grades shown on the drawings. $19,550
Original award $7,774,233
Show all 13

About this award

The Department of the Army awarded an $8.613 million definitive contract to Jerry B. Young Construction, Inc. for Island 8 Parcel 2 seepage remediation on October 1, 2021, under a service-disabled veteran-owned small business set-away. The awardee holds active SBA certifications as a service-disabled veteran-owned small business and veteran-owned small business, valid through October 22, 2027.

The originating solicitation called for installation of 79 relief wells, 12,000 linear feet of subsurface drain pipe, 1,900 linear feet of drainage ditches, culvert replacement, and debris removal from Running Slough at the Island 8 site in Fulton County, Kentucky. Work is performed on a firm fixed-price basis with a completion date of March 31, 2027. The contract reflects an increase of $8.613 million under RMS Change Request No. CA012, which added bollards and concrete pads to the scope.

Quick answers

Who was awarded contract W912EQ21C0020?

W912EQ21C0020 was awarded to Jerry B. Young Construction, Inc. by ENDIST Memphis (US Army Corps of Engineers) on October 1, 2021.

How much is contract W912EQ21C0020 worth?

The government has obligated $8,613,340 on W912EQ21C0020.

Which agency awarded contract W912EQ21C0020?

ENDIST Memphis (US Army Corps of Engineers) awarded W912EQ21C0020, with funding from Department of the Army (Department of Defense).

Was contract W912EQ21C0020 competed?

The extent of competition for W912EQ21C0020 was full and open competition after exclusion of sources. The government received 5 offers. It was set aside: Service-Disabled Veteran-Owned Small Business.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award