Storage yard and dike repairs, lock and DAM no. 12, mississippi river, bellevue, iowa and JO daviess county, illinois. The work includes, but is not limited to, excavation, testing, and disposal of…

Ended Definitive Contract Awarded Last action

Contract number
W912EK10C0072
Awardee
Awarding agency
Obligated
$4,510,577

Award facts

Opportunity
Contract value 100% obligated
$4,510,576.96 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Full and Open Competition · 4 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Bellevue, IA 52031, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order A00016 · Storage yard and dike repairs, lock and DAM 12, mississippi river, bellevue, iowa and JO davies county, illinois. Modification to seal storage yard slab cracks. $5,463
Change Order A00015 · Lock and DAM 12 storage yard modification reference no. R00016 CA018 for variation in quantities. -$330,522
Change Order A00014 · Storage yard and dike repairs, lock and DAM 12, mississippi river, bellevue, iowa and JO davies county, illinois. Modification for time extension. $0
Change Order A00013 · Lock and DAM 12 storage yard and dike repairs; modification A00013 for temporary concrete removal; bellevue, dubuque county, iowa and JO daviess county,… $10,400
Supplemental Agreement for work within scope A00012 $32,023
Other Administrative Action A00011 · Lock and DAM 12 storage yard $0
Change Order A00010 · Storage yard repairs, lock and DAM no. 12, mississippi river, bellevue, iowa and JO davies county, illinois. Modification for abutment a coring adjustments,… $14,594
Change Order A00009 · Contract for storage yard and dike repairs, lock and DAM no. 12, mississippi river, bellevue, iowa and JO daniess county, illinois. This modification… $630
Supplemental Agreement for work within scope A00008 $3,422
Change Order A00007 $1,995
Change Order A00006 · Lock and DAM 12 storage yard; modification A0006 for the trasport of materials to a storage yard. $5,000
Change Order A00005 · Contract for storage yard and dike repairs, lock and DAM no. 12, mississippi river, bellevue, iowa and JO daviess county, illinois. This modification changes… $0
Change Order A00004 · Reference no. R00005 CA007-1 emergency flood response see page 2. The total cost of this contract was increased by $10,000.00 from $4,757,572.91 to… $10,000
Change Order A00003 · Storage yard and dike repairs, lock and DAM no. 12, mississippi river, vellevue, iowa and JO davies county, illinois. Modification to add additional personnel… $1,346
Change Order A00002 · Lock and DAM 12 storage yard and dike repairs, mississippi river, bellevue, iowa and JO daviess county, illinois. Modification for abut a expansion joint… -$14,678
Change Order P00001 · Contract for storage yard and dike repairs, lock and DAM no. 12,mississippi river, bellevue, iowa and JO daviess county, illinois. This modification is for… $818
Change Order A00001 · Lock and DAM 12 storage yard odification #1 for additional soil samples. $2,966
Original award $4,767,121
Show all 18

Description

Storage yard and dike repairs, lock and DAM no. 12, mississippi river, bellevue, iowa and JO daviess county, illinois. The work includes, but is not limited to, excavation, testing, and disposal of soil material contaminated with lead; minor demolition; clearing, grubbing, grading, and seeding on nonsubmersible dike; removal and disposal of portland cement concrete paving on submersible dike; removal and disposal of reinforced concrete items (e.g., winch and guide sheave bases, and light foundations) in storage yard; soil sampling and testing of material not previously identified as contaminated; removal of chain-link fence and gates; portland cement concrete paving of storage yard; placement of new reinforced concrete foundations for winches, guide sheaves, bulkhead truck rails; placement of new reinforced concrete perimeter walls; installation of new riprap and new grouted riprap; installation of sand berm; installation of aggregate driving surface; regrading and compaction of existing material in storage yard; placement of new aggregate, and compaction of entire aggregate base in storage yard; placement of portland cement concrete on submersible and nonsubmersible dike; modification of bulkhead trucks; installation of chain-link fencing, gates, and handrails; cleaning and painting of miscellaneous items; minor electrical work; and survey monument installation and associated survey.

Quick answers

Who was awarded contract W912EK10C0072?

W912EK10C0072 was awarded to William Charles Construction Company, LLC by ENDIST Rock Island (US Army Corps of Engineers) on April 6, 2010.

How much is contract W912EK10C0072 worth?

The government has obligated $4,510,577 on W912EK10C0072.

Was contract W912EK10C0072 competed?

The extent of competition for W912EK10C0072 was full and open competition. The government received 4 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award