Definitive Contract W912EF19C0019
- Not listed
- This is a firm fixed-price contract awarded by the U.S. Army Corps of Engineers, Walla Walla District, to Knight Const. & Supply, Inc. (doing business as Knight Construction & Supply) for the Lower Monumental Navigation Lock Downstream Gate Upgrade project in Kahlotus, Washington. The $3,685,965.00 contract has a completion date of April 18, 2018 and was set aside for small businesses. Knight Construction & Supply is a heavy industrial construction company that specializes in dam...
- This is a $369,144.54 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Knight Construction & Supply, Inc. for the "Lower Monumental Navlock Filling Tainter" project. The contract is not a set-aside and has a completion date of November 6, 2015. Knight Construction & Supply, Inc. is a heavy industrial construction company that specializes in dam maintenance and construction, plant maintenance and rehabilitation, fire suppression systems, and...
- This contract was awarded by the U.S. Army Corps of Engineers (USACE) Engineering District Walla Walla to Knight Construction & Supply, Inc. (Knight Construction) on a Firm Fixed Price basis. The $2,295,650.00 contract is for the installation of government-furnished digital governors at the Lower Monumental Dam in Kahlotus, Washington. The project is not set aside for any small business program. As part of this contract, Knight Construction has subcontracted with Extreme Coatings Inc. (doing...
- This is a $1,091,268.00 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Knight Construction & Supply, Inc. for the LMO - Spillway Weir Boat Barrier project in Kahlotus, Washington. The contract has a period of performance through March 30, 2016 and was set aside for small business participation. Knight Construction & Supply is a heavy industrial construction company with a history of supporting the Army Corps of Engineers, Bureau of Reclamation, and...
- This federal contract, awarded by the U.S. Army Corps of Engineers, is for the replacement of the Tainter valve 4 trunnion pin assembly at the Lower Monumental Dam in Kahlotus, Washington. The contract has a firm fixed price of $289,831.39 and was awarded on January 21, 2016, with a final completion date of July 1, 2016. The prime contractor is Northbank Civil and Marine, Inc., a for-profit subchapter S corporation that specializes in infrastructure upgrades and repairs for dams, navigation...
- The U.S. Army Corps of Engineers awarded a $848,300.40 firm-fixed-price contract to Knight Construction & Supply, Inc. to provide turbine maintenance platforms for the Lower Granite Lock & Dam and Lower Monumental Lock & Dam in Walla Walla, Washington. This contract has a total small business set-aside designation. Knight Construction & Supply specializes in dam maintenance and construction services, and has delivered previous turbine runner cavitation repair and crane...
- The U.S. Army Corps of Engineers, Walla Walla District awarded a $659,430.64 firm fixed-price contract to Thompson Construction Group Inc. doing business as Thompson Turner Const. to complete repairs at the Lower Monumental Lock and Dam Unit 2 in Kahlotus, Washington. The solicitation sought bids to repair a failed seal between the runner hub and turbine shaft connection, including sealing the outer diameter of the shaft flange, installing welded caps on coupling bolts, and adding piping to...
- This federal contract was awarded by the U.S. Army Corps of Engineers Engineering District Walla Walla to Knight Const. & Supply, Inc. (doing business as Knight Construction & Supply) for a digital governor upgrade at the Lower Granite Dam in Pomeroy, WA. The $2,387,478.00 firm fixed-price delivery order contract has a completion date of September 30, 2019 and was awarded on February 1, 2018. Knight Construction & Supply is a heavy industrial construction company that specializes...
- This is a $3,829,381 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Knight Construction & Supply, Inc. for the McNary Navigation Lock Tainter Valves Replacement project in Umatilla, Oregon. The contract has a partial small business set aside. Knight Construction is a heavy industrial construction company that specializes in dam maintenance and construction, as well as other infrastructure projects for federal agencies like the Bureau of Reclamation and...
- Knight Construction & Supply, Inc. was awarded a $64.6M firm fixed-price definitive contract by the U.S. Army Corps of Engineers on September 23, 2024, to execute the REA Design and LGA/LLA/LMA Auto Valve Close Modification project at the Lower Snake River Navigation Lock facilities in Dayton, Washington. The work encompasses the fabrication, removal, and installation of 16 replacement tainter valves and associated mechanical and electrical equipment across four navigation lock projects...
The Department of the Army Corps of Engineers Engineering District Walla Walla awarded a Firm Fixed Price definitive contract to Knight Construction & Supply, Inc. for the "LOWER MONUMENTAL DAM, KAHLOTUS, WA-TAINTER VALVE 2 URGENT REPAIR" project. The $252,258.00 contract has a completion date of May 31, 2019 and does not have a set-aside designation. Knight Construction & Supply, Inc. is a heavy industrial construction company that specializes in dam maintenance and construction, as well as other infrastructure projects. The company has previously received prime federal contracts from agencies like the Department of the Interior Bureau of Reclamation and the Department of Energy Bonneville Power Administration for turbine runner cavitation repair, crane rehabilitation, and other specialized services.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Lower Monumental Tainter Valve 2 Urgent Repair | W912EF19R0016 | Department of the Army Corps of Engineers Engineering District Walla Walla | Award Notice 1/1 | 3/29/19, 11:10 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| A00001 | Supplemental Agreement for work within scope | $55.9k | 5/30/19 | |
| Not listed | Not listed | $196.3k | 3/28/19 |