Construction of water treatment, nitrate removal facility and potable water storage tank at charbonneau park, ICE harbor DAM, burbank, washington. The 24'X 28' masonry structure will house a booster…
Ended Definitive Contract Awarded Last action
- Contract number
- W912EF09C0046
- Awardee
-
Extreme Coatings Inc. UEI PDY9YHZJHFM4
- Awarding agency
-
ENDIST Walla Walla
US Army Corps of Engineers, Department of Defense
- Obligated
- $1,005,511
Award facts
- Opportunity
-
- W912EF09R0053 Solicitation number
- RECOVERY--Y--Construction of Water Treatment Facility Award Notice · Posted Sep 25, 2009
- Contract value 100% obligated
- $1,005,511.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- Contracting staff
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Y199 Construct/Misc Bldgs
- Set-aside
- 8(a) Sole Source
- Competition
- Not Available for Competition · 1 offer Only One Source
- Pricing
- Firm Fixed Price
- Place of performance
- Burbank, WA 99323, USA
- Legislative mandates
-
- Davis-Bacon Act FAR subpart 22.4
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Vendor Address Change | $0 | |
| Change Order | $0 | |
| Change Order | $0 | |
| Change Order | $0 | |
| Change Order | $7,511 | |
| Original award | $998,000 |
About this award
This is a $1,005,511 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to Extreme Coatings Inc., doing business as ECI Services, a Small Business Administration (SBA) certified Women-Owned Small Business and self-certified Small Disadvantaged Business. The contract is for the construction of a water treatment and nitrate removal facility, as well as a potable water storage tank at Charbonneau Park, Ice Harbor Dam in Burbank, Washington. The project involves the installation of a 300 GPH reverse osmosis unit, a tablet chlorinator, a limestone contactor, and other related equipment within a 24' x 28' masonry structure. Additionally, a 20' round, 20' high reinforced concrete potable water storage tank will be constructed. The contract has a set-aside designation as an 8(a) sole source, and the ultimate completion date is May 13, 2010.
Description
Construction of water treatment, nitrate removal facility and potable water storage tank at charbonneau park, ICE harbor DAM, burbank, washington. The 24'X 28' masonry structure will house a booster pump station with pressure tank, air compressor and dryer, one (1) 300GPH reverse osmosis unit, tablet chlorinator, limestone contactor, anti-scalant drum and metering pump and other miscelaneous items. The potable water storage tank will be a roofed 20' round, 20' high reinforced concrete structure.
Quick answers
Who was awarded contract W912EF09C0046?
W912EF09C0046 was awarded to Extreme Coatings Inc. by ENDIST Walla Walla (US Army Corps of Engineers) on September 25, 2009.
How much is contract W912EF09C0046 worth?
The government has obligated $1,005,511 on W912EF09C0046.
Was contract W912EF09C0046 competed?
The extent of competition for W912EF09C0046 was not available for competition. The government received 1 offer. It was set aside: 8(a) Sole Source.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award