Supplemental Agreement for work within scope
A00037 · (WP142) provide all labor, materials and equipment to repair damaged sidewalk that was not part of the contract. (WP143) provide all labor, material and…
$16,953
Supplemental Agreement for work within scope
A00036 · Scope of work: additional asbestos abatement remove additional brick, block,&ACM mastic found during the demolition of the 1954 building. Also, include air…
$132,954
Supplemental Agreement for work within scope
A00035 · A00035, R0035 (WP129) provide all labor, material and equipment to: 1. Demolish walls and fixtures to expose additional pipe insulation and to remove and…
$60,242
Supplemental Agreement for work within scope
A00034 · A00034, R0034 (WP099) provide all labor, materials and equipment to replace approximately 30 square feet of damaged maple hardwood and sub-flooring in the…
$29,361
Supplemental Agreement for work within scope
A00033 · A00033, R0033 WP 101 auditorium ceiling repairs provide all labor, material and equipment to repair two water-damaged sections of the ceiling in the…
$32,248
Supplemental Agreement for work within scope
A00032 · R00032 (WP102) provide all labor, material, and equipment to install three emergency lights for the existing GYM, one each at the front stairs and one at the…
$70,472
Supplemental Agreement for work within scope
A00031 · Scope of work WP048 provide all labor, materials and equipment to install a 20 foot trench drain at the entry point of the staff parking lot to capture all…
$44,317
Supplemental Agreement for work within scope
A00030 · R0030 scope of work WP100 - paint auditorium floor provide all labor, material and equipment to paint the auditorium floor at the seating area. WP104 - refinish…
$77,258
Supplemental Agreement for work within scope
A00029 · Scope of work WP079¿ painting of GYM provide all labor, material and equipment to prepare and paint the GYM walls in the 1934 building, including walls, and…
$61,719
Supplemental Agreement for work within scope
A00028 · A00028, R0028 WP080 provide all labor, material and equipment to enclose the exposed collapsible columns in four rooms and a stairwell on the basement level…
$79,205
Supplemental Agreement for work within scope
A00027 · A00027, R0027 R00027 (WP083) provide all labor, material and equipment to skim coat the entire main office with a leveling underlayment and install 1700 SQ FT…
$42,689
Supplemental Agreement for work within scope
A00026 · A00026, R0026 electric demo and relo in auditorium WP064. Provide all labor, material and equipment to remove and replace or reinstall all surface mounted and…
$82,182
Supplemental Agreement for work within scope
A00025 · A00025, R0025 scope of work WP056 misc plumbing provide all labor, material and equipment to: 1. Install hot water to the boys' and girls' restrooms in the 1954…
$96,989
Supplemental Agreement for work within scope
A00024 · (WP070) provide all labor, materials and equipment to install under counter storage cabinets in 14 classrooms in the 1934 and 1985 buildings. (WP071) provide…
$88,936
Supplemental Agreement for work within scope
A00023 · Provide all labor, material and equipment to: 1. Remove and dispose of misc equipment in the MS GYM, including the old scoreboard, storage cages on the north…
$70,724
Supplemental Agreement for work within scope
A00022 · A00022, R0022 WP066 provide all labor, material and equipment to install additional structural supports in all window openings in the 1985 and 1934 buildings.…
$42,439
Supplemental Agreement for work within scope
A00021 · R0021 provide all labor, material and equipment to cover the walls in some of the classrooms on the 1ST and 2ND floors of the 1934 building with gypsum wall…
$73,708
Supplemental Agreement for work within scope
A00020 · A00020, R0020 provide all labor, material and equipment to remove all circuits in the ceiling slab of the existing GYM and reinstall and repower all affected…
$76,272
Supplemental Agreement for work within scope
A00019 · A00019, R0019 WP010 provide all labor, material and equipment to remove the plaster and lathe ceiling above suspended ceilings on the second floor in…
$80,081
Supplemental Agreement for work within scope
A00018 · WP044 provide all labor, material and equipment to enclose the steel supports in the cafeteria of the wpms. WP047 provide all labor, material and equipment to…
$60,372
Supplemental Agreement for work within scope
A00017 · A00017, R0017 WP040 - ACM sampling WP041 - new sidewalk next to existing GYM WP042 - new bacsplash in the VEG prep stations WP043 - additional data drops in…
$18,178
Supplemental Agreement for work within scope
A00016 · A00016,R0016 WP035 - door transition strips WP038 - MI cables WP039 - misc flooring items
$53,283
Supplemental Agreement for work within scope
A00015 · A00015, R0015 WP022 addition of reinforcing steel bars provide all labor, material, and equipment to install 2' steel #5 rebars 48" on center on lintel boxbeams…
$87,461
Change Order
A00014 · A00014, R0014, WP026 time extension
$149,265
Supplemental Agreement for work within scope
A00013 · Provide all labor, material and equipment to hammer, excavate, screen and dispose of 15OO CY of rock generate during the excavation for the new underground…
$54,951
Supplemental Agreement for work within scope
A00012 · A00012,R0012, WP025 additional masonry crew increase crew size by 5 additional masons and laborers to increase productivity of bricklaying for the building…
$108,000
Supplemental Agreement for work within scope
A00010 · A00010, R0010; WP017 - existing faculty breakroom WP021 - install roof drainage pipe WP023 - demolition of concrete stairs
$14,405
Supplemental Agreement for work within scope
A00011 · A00011, R0011 WP024 removal of rock ledge at GYM
$10,700
Supplemental Agreement for work within scope
A00009 · R00009 provide all labor, material and equipment to hammer, excavate, stockpile, and dispose of 1200 C.Y.of rock generate by the installation of the water loop.
$29,551
Supplemental Agreement for work within scope
A00007 · A00007 WP04 overexcavation of unsat matl at footings (R00007)
$93,118
Supplemental Agreement for work within scope
A00008 · A00008 misc changes (R00008)
$12,206
Change Order
A00005 · A00005 WP008 processing excavation material for UXO (R00005)
$27,700
Supplemental Agreement for work within scope
A00006 · A00006 misc changes (R00006)
$45,609
Change Order
A00004 · A00004 WP007 temporary parking facility (R00004)
$17,496
Change Order
A00003 · A00003 misc changes (R00003)
$82,388
Change Order
A00002 · A00001 misc changes (R00002)
$9,436
Change Order
A00001 · A00001-WP001 fence around temp playground (R00001)
$7,894
Other Administrative Action
P00001 · Administrative modification to totals.
$0
Original award
$23,974,000
Show all 39
Quick answers
Who was awarded contract W912DS12C0001?
W912DS12C0001 was awarded to Benard Associates Inc. by ENDIST New York (US Army Corps of Engineers) on October 20, 2011.
How much is contract W912DS12C0001 worth?
The government has obligated $26,114,762 on W912DS12C0001.
Was contract W912DS12C0001 competed?
The extent of competition for W912DS12C0001 was full and open competition after exclusion of sources. The government received 6 offers. It was set aside: Total Small Business.