Change Order
A00053 · North campus electrical utility plant/contract for north campus electrical utility plant at fort meade. Reference no. R00059 DX phase rotation test EA dead…
$18,879
Change Order
P00006 · North campus electrical utility plant DY BG & e allowance balance the contractor shall return all remaining funds associated with clin 002: baltimore gas &…
-$2,401,076
Change Order
A00052 · North campus electrical utility plant DF replace fuel gaskets contractor shall provide all labor, material and equipment necessary to furnish and install…
$234,149
Change Order
A00051 · North campus electrical utility plant DU extend feeders 6G and 6H to 3K chiller contractor shall provide all labor, material and equipment necessary to…
$42,376
Change Order
A00050 · North campus electrical utility plant CU MDE generator exhaust stack test contractor shall provide all labor, material and equipment necessary to perform an…
$83,295
Change Order
A00049 · North campus electrical utility plant DE BG & e permanent power route restoral reference contract drawing c-032. Provide all labor, material and equipment…
$115,873
Change Order
A00048 · North campus electrical utility plant DI REA urea system pressure valves contractor shall provide all labor, material and equipment necessary to furnish and…
$70,349
Change Order
A00047 · North campus electrical utility plant DL voltage change from 13.8KV to 14.1KV reference contract specification section 26 00 00.00 20.1.4. Contractor shall…
$114,979
Change Order
A00046 · North campus electrical utility plant DN utility loss & restoration logic changes item 1. Contractor shall provide all labor, materials and equipment…
$468,745
Change Order
A00045 · North campus electrical utility plant DQ REA load bank additional rental contractor shall provide all labor, material and equipment necessary to furnish 10MW…
$79,282
Change Order
A00044 · North campus electrical utility plant by security camera requirements reference contract drawings EG-109 and EG-110. Contractor shall provide all labor,…
$205,693
Change Order
A00043 · North campus electrical utility plant BU MPO telephony revisions reference contract drawings EG-096 and EG-106. Contractor shall provide all labor, equipment…
$129,703
Change Order
A00042 · North campus electrical utility plant DH cisco switch upgrade reference specification section 25 10 20 and contract drawings EG-034, EG-040 and EG-103.…
$116,189
Change Order
A00041 · North campus electrical utility plant AA npdes general permit application MDE npdes general permit application reference specification section 010000.1.13.1.…
$2,160
Change Order
A00040 · North campus electrical utility plant DC gas regulator for pressure reduction reference contract drawing m-016 . Provide all labor, material and equipment…
$15,483
Change Order
A00039 · North campus electrical utility plant CZ chilled water pump sizing reference contract drawing m-029, chilled water pump schedule. Provide all labor, material…
$34,153
Change Order
A00038 · North campus electrical utility plant CY continuous galvanized angles reference contract documents a-024/a, a-036/b, a-038/b, a-053/2, a-053/5 and SK-01.…
$13,026
Change Order
A00037 · North campus electrical utility plant CP insert-a-valve on waterline in lot W1 reference contract drawings c-024 and c-070. Provide all labor, material and…
$24,343
Change Order
A00036 · North campus electrical utility plant CG 9950 comms room power requirements provide all labor, material and equipment necessary to furnish and install eight (8)…
$51,743
Change Order
A00035 · North campus electrical utility plant CK spcc spill prevention plan provide all labor, material and equipment necessary to develop and submit a spill…
$52,134
Change Order
P00005 · North campus electrical utility plant BM bulletin #6-combine communications rooms 1. Provide all labor, material and equipment necessary to furnish and…
$674,959
Change Order
A00034 · North campus electrical utility plant AY existing feeders interference MH1086 contractor to provide all labor, material and equipment necessary to locate,…
$35,597
Change Order
A00033 · North campus electrical utility plant CJ telecom conduit to cable vault h contractor to provide all labor, material and equipment necessary to core drill…
$29,670
Change Order
A00032 · North campus electrical utility plant CE emcs tie into BG & e gas meter contractor to provide all labor, material and equipment necessary to tie BG & e…
$7,314
Change Order
A00031 · North campus electrical utility plant CC downspout splash blocks contractor to provide all labor, material and equipment necessary to install RIP-RAP in a 5'…
$40,378
Change Order
A00030 · North campus electrical utility plant CN fire connection upgrade, ball drip valve item 1. Contractor to provide all labor, material and equipment necessary to…
$13,683
Change Order
A00029 · North campus electrical utility plant CL handrail and catwalk brace conflict contractor to provide all labor, material and equipment necessary to shift the…
$47,929
Change Order
A00028 · North campus electrical utility plant BG neutral ground resistor bypass contractor to provide all labor, material and equipment to install a solid connection…
$34,128
Change Order
A00027 · North campus electrical utility plant BX fuel system revisions provide all labor, materials and equipment to make the following changes to the fuel delivery…
$100,558
Change Order
A00026 · North campus electrical utility plant CF steel plate support conflicts contractor to provide all labor, material and equipment necessary to cut back steel plate…
$20,462
Change Order
A00025 · North campus electrical utility plant BP day tank pump voltage change contractor to provide all labor, material and equipment necessary to install a multi-TAP…
$56,704
Change Order
A00024 · North campus electrical utility plant CB french drain for MH g/h 1086 contractor to provide all labor, material and equipment necessary to install 150' of 6"…
$18,484
Change Order
A00023 · North campus electrical utility plant BW additional bulkhead for EM shielding contractor to provide all labor, material and equipment necessary to furnish and…
$2,308
Change Order
A00022 · North campus electrical utility plant BN BG & e alternate power source contractor to provide all labor, material and equipment necessary to install 13.2KV power…
$200,661
Change Order
A00021 · North campus electrical utility plant BL differing site conditions at ductbanks item 1. Contractor to provide all labor, material and equipment necessary to…
$57,808
Change Order
A00019 · North campus electrical utility plant AO urea design for generators provide all labor, materials and equipment to perform the additions and revisions to the…
$237,112
Change Order
A00020 · North campus electrical utility plant BQ increase fuel polisher pump size contractor to provide all labor, material and equipment necessary to increase the size…
$198,075
Change Order
A00018 · North campus electrical utility plant BT delete duct wrap bonding adhesive contractor to delete all labor, material and equipment required to install bonding…
$1,103
Change Order
A00017 · North campus electrical utility plant AU surface preparation for gates contractor to provide all labor, material and equipment to add asphalt paving at the…