Change Order
P00032 · Modification for removal of remaining closeout REQ. To 071502 - AIT complex 2, PH 1 - dfac at fort leonard wood, missouri
-$41,606
Other Administrative Action
P00031 · Modification to change contractor from zieson to surety company after takeover agreement.
$0
Change Order
A00004 · Modification for splash guard at pot wash area to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard…
$3,335
Change Order
A00003 · Change for door closers for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood, missouri.
$3,559
Change Order
A00002 · Modification for attic lighting and disconnects to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT.…
$4,041
Change Order
A00001 · Modification for water hammer arrestors and access panels to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at…
$6,996
Change Order
P00030 · Modification for grading changes to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood, missouri.
$6,411
Change Order
P00029 · Modification for revised duct sizing at kitchen hoods to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT.…
$0
Change Order
P00028 · Modification for narrow light hollow metal doors to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard…
$4,435
Change Order
P00027 · Modification for SOD, exhaust register tags, deletion of flushing REQ. From cctb, and domestic hot water valve to contract for advanced individual trainee…
$77,658
Change Order
P00026 · Modification for water treatment - flushing requirements; changes to wall finishes; ADA ramp changes; and, traffic door to contract for advanced individual…
$83,482
Change Order
P00025 · Modification for dedicated outside air units 1 & 2; exterior lighting controls; recycling BIN; crash rail; and, electrical feeder size change to contract for…
$91,698
Change Order
P00024 · Modification for pipe size corrections for mech systems; and, modify steel at louvers to contract for advanced individual trainee barracks complex 2, phase 1…
$19,995
Change Order
P00023 · Modification for carbon monoxide detectors reporting to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT.…
$33,935
Change Order
P00022 · Modification for kitchen equipment to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood,…
$67,533
Change Order
P00021 · Modification for additional supports at salad bar to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT.…
$9,336
Change Order
P00020 · Modification for emergency lighting to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood,…
$1,766
Change Order
P00019 · Modification for added contactors for shut off circuits to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at…
$14,121
Change Order
P00018 · Modification for light fixtures to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood, missouri.
$65,758
Change Order
P00017 · Modification for differing site condition at loading dock to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at…
-$1,997
Supplemental Agreement for work within scope
P00016 · Incorporate clause into contract for the AIT complex II dining facility located at FT. Leonard wood, MO.
$0
Change Order
P00015 · Modification for deletion of copper wire at OSP to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT.…
-$3,568
Change Order
P00014 · Modification for removal of stockpiled contaminated soils to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at…
$18,878
Exercise an Option
P00013 · Exercise option clins 0006 & 0007 for the AIT complex II dining facility located at FT. Leonard wood, MO.
$425,159
Change Order
P00012 · Modification to install 2 additional floor drains; and, porcelain tile in lieu of carpet tile to contract for advanced individual trainee barracks complex 2,…
$6,005
Change Order
P00011 · Modification for storm sewer line reroute to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard…
$7,740
Change Order
P00010 · Modification for leed specification to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood,…
$3,634
Change Order
P00009 · Modification for epoxy flooring to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood, missouri.
$0
Change Order
P00008 · Modification for service line to dfac building to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard…
-$22,894
Change Order
P00007 · Modification for differing site condition at loading dock to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at…
$20,000
Change Order
P00006 · Modification for specification section 11 05 40 - add paragraph 3.2.2 training levels to contract for advanced individual trainee barracks complex 2, phase 1…
$0
Change Order
P00005 · Modification for toilet partitions to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard wood,…
-$16,780
Change Order
P00004 · Modification to delete lime stabilization to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at FT. Leonard…
-$42,015
Vendor Address Change
P00003 · Contracto's address is hereby changed
$0
Supplemental Agreement for work within scope
P00002 · Option exercise period for option clin 0006 & clin 0007 is increased by 167 days from 180 days to 347 calendar days from award date.
$0
Change Order
P00001 · Modification for pump head flow horsepower and operations to contract for advanced individual trainee barracks complex 2, phase 1 - dining facility (dfac) at…
$14,264
Original award
$14,313,443
Show all 37
Quick answers
Who was awarded contract W912DQ15C4004?
W912DQ15C4004 was awarded to Zieson Construction Company, LLC by ENDIST Kansas City (US Army Corps of Engineers) on December 18, 2014.
How much is contract W912DQ15C4004 worth?
The government has obligated $15,174,322 on W912DQ15C4004.
Was contract W912DQ15C4004 competed?
The extent of competition for W912DQ15C4004 was full and open competition after exclusion of sources. The government received 7 offers. It was set aside: Total Small Business.