This project is a design-bid-build project, consisting primarily of the renovation of two, existing three- story barracks and an optional advanced individual training barracks. All buildings are…

Ended Definitive Contract Awarded Last action

Contract number
W912DQ12C4012
Awardee
Awarding agency
Obligated
$25,646,185

Award facts

Opportunity
Contract value 100% obligated
$25,646,185.13 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
Total Small Business
Competition
Full and Open Competition after exclusion of sources · 3 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
FT LEONARD WD, MO 65473, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order P00032 · Modification for boiler exhaust; demobilization credit; install fan bldg 1016; and, warrenty call back to contract for training barracks upgrade program for… $4,750
Change Order P00031 · Modification for additional equipment requirement to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $29,259
Change Order P00030 · Modification for balancing dampers to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. -$2,340
Change Order P00029 · Modification for pump dedicated circuit; and, install "LC" plug in connectors to contract for training barracks upgrade program for fiscal year 2012 at FT.… $1,080
Change Order P00028 · Modification for construct FRP wall to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $1,272
Change Order P00027 · Change for concrete infills to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $95,000
Change Order P00026 · MOD is to change the comm line and manhole changes, and flooring changes. Contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard… -$2,521
Change Order P00025 · MOD is to extend insurance coverage. Contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $622
Change Order P00024 · At building 1016, the contractor shall delete the requirement to demo the existing hthp lines. Contract for training barracks upgrade program for fiscal year… -$12,000
Change Order P00023 · Provide key control storage system for buildings 737, 738 and 1016. Provide additional signage for buildings 737 and 738. Contract for training barracks upgrade… $10,666
Change Order P00022 · Compensation for delays with the overhead rough-in issues for building 1016. Contract for training barracks upgrade program for fiscal year 2012 at FT.… $93,744
Change Order P00021 · Change for expansion joint repair to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $858
Change Order P00020 · Modification to change boiler sequence of operations to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $19,945
Change Order P00019 · Change for bldg 1016 miscelaneous issues to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. -$33,212
Change Order P00017 · Change for buss duct repairs to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $17,633
Change Order P00016 · Change for additional brick replacement to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $3,067
Change Order P00015 · Modification for tile change to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. -$5,783
Change Order P00014 · Change for electric hardware to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $1,042
Change Order P00013 · Change for flooring and base changes; 1016 suite bathroom locks; 737 & 738 stairwell lights; and 1016 hydronic piping reroute to contract for training… $75,137
Change Order P00012 · Change for transformer conduit repairs at bldg 738; FDC at bldg 738 and 1016; and, bldg 738 water line TAP to contract for training barracks upgrade program for… $33,004
Change Order P00011 · Change for bldg-737 expansion joint concrete repair; hthp addition at bldg 1016; drinking fountain receptacles; and, water cooler with bottle filler to contract… $33,981
Change Order P00010 · Change for contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. Reference no. R00010 SH016 asbestos abatement on… $6,846
Change Order P00009 · Change for sound and closed cell insulation credit to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. -$9,252
Change Order P00008 · Change for storm sewer deletion to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. -$19,260
Change Order P00007 · Change for unusually severe weather resulting in a time extension due to weather to contract for tbup (trainee barracks upgrade program) FY12 at fort leonard… $0
Change Order P00006 · Change for PVC pipe/water hammer arrestor CREDIT; delete cathodic protection (CREDIT); delete masonry restoration; and, duct bank to existing transformer-CREDIT… -$87,820
Change Order P00005 · Change for chemical pot feeders; and, solar water pressure sensor to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood,… $7,460
Exercise an Option P00004 · Exercise options for clins 0007,0008,and 0009 for the construction, repairs, and maintenance of the AIT barracks, building 1016 located at fort leonard wood,… $9,389,007
Change Order P00003 · Modification for tbup 12 - extension of option(S) to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $0
Change Order P00002 · Modification for extension of option(S) to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $0
Change Order P00001 · Change for extension of option(S) to contract for training barracks upgrade program for fiscal year 2012 at FT. Leonard wood, missouri. $0
Original award $15,994,000
Show all 32

Description

This project is a design-bid-build project, consisting primarily of the renovation of two, existing three- story barracks and an optional advanced individual training barracks. All buildings are located at FT. Leonard wood. The project includes furnishing all procurement, installation, plant, labor, equipment, materials, and transportation and performing all required work to provide complete and usable facilities. The renovation is intended to be functionally and technically similar to a dormitory in the private sector community surrounding the installation.

Quick answers

Who was awarded contract W912DQ12C4012?

W912DQ12C4012 was awarded to Awa Wilson JV by ENDIST Kansas City (US Army Corps of Engineers) on September 21, 2012.

How much is contract W912DQ12C4012 worth?

The government has obligated $25,646,185 on W912DQ12C4012.

Was contract W912DQ12C4012 competed?

The extent of competition for W912DQ12C4012 was full and open competition after exclusion of sources. The government received 3 offers. It was set aside: Total Small Business.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award