This is a $24,808,410.77 firm fixed price design-build contract awarded by the U.S. Army Corps of Engineers (USACE) Louisville District to Korte Construction Company, doing business as The Korte Company, for construction at Aberdeen Proving Ground in Maryland. The contract has a completion date of August 14, 2019 and did not utilize any set-aside designations. The contract involves the design and construction of new facilities at the Army installation, including aircraft maintenance hangars,...
The Department of the Army Corps of Engineers Engineering District Tulsa awarded a definitive, firm fixed price contract in the amount of $65,296,480.00 to Korte Construction Company for the design and construction of the KC-46A depot maintenance hangar on the KC-46A campus at Tinker Air Force Base in Oklahoma. No set-aside was used for this contract. Korte Construction Company has subcontracted with various firms to provide specialized services such as interior signage, compressed air...
This $144,702,810 firm-fixed-price contract was awarded by the U.S. Army Corps of Engineers Engineering District Los Angeles to Korte Construction Company, doing business as The Korte Company, for the Disaster Resiliency Program (DRP) Phase 1 project at Creech Air Force Base in Indian Springs, Nevada. The contract involves the design and construction of a 47,856 square foot Squadron Operations facility and a 55,596 square foot Aircraft Operations Facility, as well as supporting infrastructure...
This is a definitive contract awarded by the U.S. Army Corps of Engineers Louisville District (USACE) to Korte Construction Company, a design-build construction firm specializing in federal government construction projects. The $44,777,311.37 firm-fixed-price contract is for the construction of visiting quarters at Scott Air Force Base in Illinois. The contract does not have a set-aside designation. Korte Construction Company, also known as The Korte Company, has been awarded multiple Indefinite...
This is a definitive, firm-fixed price contract awarded by the U.S. Army Corps of Engineers to the Korte Construction Company, a design-build construction firm, to design and construct a 6,968 square meter, two-story Flight Test Engineering Laboratory Complex at Edwards Air Force Base in California. The $40,510,469.95 contract has a period of performance of 780 calendar days and does not have a set-aside designation. The project involves demolishing an existing 60-year-old facility and...
The U.S. Army Corps of Engineers, Omaha District awarded a $37.9 million firm-fixed-price construction renovation contract to Conti Federal Services LLC. The contract calls for Conti Federal Services to fully renovate the existing 39,861 square foot Building 631 at Grand Forks Air Force Base in North Dakota as a Disaster Resiliency Program Formal Training Unit, as described in Solicitation DRP Formal Training Unit Bldg. 631. There was no set-aside designation for this opportunity. Funding will...
The U.S. Army Corps of Engineers awarded Korte Construction Company, a design-build construction firm, a $73.2 million firm fixed price contract for the design and construction of the KC-46A Fuel Maintenance Hangar on the KC-46A campus at Tinker Air Force Base in Oklahoma. The contract does not have a set-aside designation. The project involves construction of an approximately 90,000 SF facility with fuel/defuel aircraft maintenance docks, support spaces, and associated site and infrastructure...
The U.S. Army Corps of Engineers awarded a $35,895,948.69 definitive, firm-fixed-price contract to Korte Construction Company for the design and construction of a two-story, 72,140 square foot Joint Simulation Environment (JSE) facility at Edwards Air Force Base in California. The contract has an ultimate completion date of November 9, 2023 and was not set aside for any specific business type. Key subcontractors include providers of insulation, metal panels, raised access flooring, acoustics,...
This is a $121,299,723.66 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Korte Construction Company, a design-build construction firm, for the design and construction of a 13,789 square meter Ground Based Strategic Deterrent (GBSD) Consolidated Maintenance Facility at Vandenberg Space Force Base in California. The facility will support GBSD test and launch operations, and accommodate 250 personnel. It will include specialized areas like an Advance Program...
This is a firm fixed-price delivery order awarded by the Department of the Air Force's Air Combat Command to T.F. Powers Construction Co., a for-profit construction services provider, to repair the hangar door control systems at Grand Forks Air Force Base in North Dakota. The contract has a ceiling value of $75,400.00 and a completion date of January 31, 2022. No set-aside designation was used. The award is related to an indefinite delivery, indefinite quantity (IDIQ) construction multiple award...
This is a $62,766,873 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE), Omaha District to Korte Construction Company for the construction of a Disaster Resiliency Program (DRP) aircraft maintenance facility at Grand Forks Air Force Base in North Dakota. The contract involves renovating an existing hangar building to serve as an interim aircraft operations facility and long-term aircraft maintenance facility, constructing ground data terminal pads, and rehabilitating airfield pavements. The project includes installation of security systems, utility infrastructure, and specialized technical requirements for controlled spaces. Korte Construction is a design-build construction firm that has completed numerous high-value contracts for military facilities. The contract did not use a small business set-aside. Major subcontractors include Industrial Door Contractors, Inc. for hangar door work, Avant Garde Systems Inc. for turnstile installation, and Michael Baker International, Inc. for architectural services.