The U.S. Army Corps of Engineers Engineering District Omaha awarded a $700,754.60 firm fixed price purchase order to Allen Blasting And Coating, Inc. to perform nondestructive testing on spillway gates at Fort Randall Dam in Pickstown, South Dakota. The solicitation requested phased array ultrasonic testing, magnetic particle testing, dye penetrant testing, steel thickness measurements, and testing of filled bolt holes on two gates initially with options to test up to two additional gates. The...
This federal contract award to Stantec Consulting Services Inc., a global design and consulting firm, is for the Garrison Dam Explorations & Testing Program in North Dakota. The $1,714,039.71 firm-fixed-price delivery order was awarded by the U.S. Army Corps of Engineers, a defense agency, and does not have a set-aside designation. The contract involves geotechnical exploration and testing services at the Garrison Dam, including pressuremeter testing, geophysical borehole logging, and...
The U.S. Army Corps of Engineers awarded a $556,849.04 firm fixed-price purchase order contract to Energy By Native American Design Corp, a small disadvantaged business, for the replacement of spillway transformers, disconnects, and motor control centers at the Garrison Dam in Riverdale, North Dakota. This contract is a set-aside for total small businesses and is expected to be completed by December 19, 2025. The original solicitation, which was posted on or about July 19, 2024 and closed on...
The U.S. Army Corps of Engineers (USACE) awarded a $25,671,333.60 firm-fixed price contract to HSG Park Joint Venture 2, LLC, a woman-owned small business, for the Garrison Dam Spillway Approach Dredge project. This project, which has a period of performance through August 27, 2027, involves remediating and controlling sediment accumulation upstream of the Garrison Dam spillway structure. The work includes repairing and armoring a portion of the eastern channel bank, performing further...
This is a $97,969.94 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) Omaha District to RN Civil Construction, LLC, a small business concern, on August 6, 2010. The contract is for the ARRA rehabilitation of the emergency/service gates at the Chatfield Dam, Project No. 323621. The work is being performed in Littleton, Colorado, and the ultimate completion date is June 4, 2013. This contract is funded through the American Recovery and Reinvestment Act...
This is a $2,184,040.43 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Alltech Engineering Corp, doing business as L&P Alltech Corp, a small business Subchapter S corporation based in Mendota Heights, Minnesota. The contract is for service gate 1 conduit liner work, which involves removing an existing steel conduit liner plate, performing concrete hydro-demolition, placing new concrete, installing epoxy anchors, installing a new stainless steel liner...
This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers, Omaha District to Western Industrial Contractors, Inc. for $19,667.00. The contract is for work at the Bear Creek Dam, including the removal, cleaning, off-site painting, and reinstallation of low-flow gates, as well as the replacement of miscellaneous tubing and fittings in the gate hydraulic operating system. This contract was funded through the American Recovery and Reinvestment Act (ARRA). The...
Garco Wemco A Joint Venture has been awarded a firm fixed price delivery order valued at $1,999,500 by the U.S. Army Corps of Engineers to replace the Oahe Spillway Monorail Crane at Oahe Dam in South Dakota. Issued under the Corps' NWD Crane Rehabilitation and Replacement IDIQ vehicle, this task order supports the rehabilitation and maintenance of critical infrastructure by delivering crane replacement services at the dam by the May 2022 completion date. No set-aside designation applied to this...
This $3,470,686.00 firm fixed price contract was awarded by the U.S. Army Corps of Engineers to Precision Build Solutions LLC, doing business as Tampa Tank, for the fabrication and delivery of Stennis Spillway Gate #2 for the John C. Stennis Lock and Dam on the Tennessee-Tombigbee Waterway near Columbus, Mississippi. The new 60-foot wide, 29-foot tall, 180,000-pound gate is to be delivered via barge by July 2025. The contract also includes an option to repair the existing Spillway Gate #3....
This contract, awarded by the U.S. Army Corps of Engineers, Omaha District to BCI Construction USA, Inc., is for the fabrication and replacement of six intake gates and one draft tube bulkhead gate at Fort Randall Dam in Pickstown, South Dakota. The $6,525,733.99 firm fixed-price contract is part of a larger powerhouse rehabilitation project at the dam. BCI Construction is a Veteran-Owned Small Business and Service-Disabled Veteran-Owned Small Business that has been awarded over $130 million...