Definitive Contract W9127826CA015
Award Date 5/21/26
Potential Completion Date 4/12/27
Potential Value $46M
Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Irvington, AL 36544, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
5
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The U.S. Army Corps of Engineers awarded a $75.4 million definitive contract to The Dutra Group for Mobile Harbor Deepening & Widening Phase 6 on May 3, 2024, with place of performance in Irvington, Alabama. A modification issued on or before July 18, 2026 extended the completion date to August 10, 2026. The originating solicitation covers dredging and widening portions of the Upper Bay Channel and Turning Basin in Mobile, Alabama between stations 226+16 to 337+00, including removal of...
- The U.S. Army Corps of Engineers Mobile District awarded a $26.0M firm fixed-price definitive contract to Weeks Marine, Inc. for maintenance dredging operations in Mobile Harbor, Alabama. The contract, awarded on April 11, 2025, with an ultimate completion date of November 20, 2025, supports the Corps' mission to maintain navigable waterways critical to national commerce and military operations. This contract originated from a market research pre-solicitation posted in January 2025 seeking...
- The U.S. Army Corps of Engineers awarded a $5.5 million firm fixed price delivery order contract to The Dutra Group, doing business as Dutra Dredging, to perform dredging of the Mobile Harbor channel in Mobile, Alabama. Under the terms of the contract, Dutra Dredging will dredge the shipping channel from September 2020 through September 2022 to maintain necessary depths for maritime navigation in and out of the port. Funding is provided by the Army Corps of Engineers' civil works program to...
- This $62.7 million firm fixed price contract was awarded by the U.S. Army Corps of Engineers to Great Lakes Dredge & Dock Company, LLC for dredging and widening services in Mobile Harbor, Alabama. The solicitation sought dredging of approximately 7.675 million cubic yards of material from the navigation channel to depths between 47 and 54 feet below the mean lower low water mark as part of Phase 3 of the Mobile Harbor Deepening and Widening project. There was no set-aside designation for...
- The U.S. Army Corps of Engineers awarded a $7,998,950 firm fixed price delivery order contract to The Dutra Group, doing business as Dutra Dredging, for dredging of the Mobile Harbor Channel in Mobile, Alabama. Under the contract, Dutra Dredging will dredge the shipping channel to maintain its authorized depth and width, allowing large commercial vessels to safely access the Port of Mobile. Work will be performed in Mobile, Alabama through March 31, 2021. No set-aside provisions were applied...
- The U.S. Army Corps of Engineers awarded an $8.2 million firm fixed price delivery order to Mike Hooks, LLC for maintenance dredging of Mobile Harbor in Mobile, Alabama. Under the contract, Mike Hooks will perform dredging services to maintain navigability of the harbor through May 2021. The funding agency, the Army Corps of Engineers, oversees civil works projects including harbor maintenance and navigation across the United States. No set aside designation or subcontractors were identified...
- The U.S. Army Corps of Engineers Engineering District Mobile awarded a $9.7 million firm fixed price contract to Great Lakes Dredge & Dock Company, LLC for dredging and widening services in Phase 1 of the Mobile Harbor Deepening and Widening project in Mobile, Alabama. Per the solicitation, this phase involves dredging approximately 1.7 million cubic yards of material from the navigation channel to deepen sections between Stations 2093+68 to 2189+58.71, as specified in the drawings. There is...
- The U.S. Army Corps of Engineers awarded a $52,620,114.59 firm-fixed-price contract to The Dutra Group, a marine construction company, for Phase 4 of the Mobile Harbor Navigation Project. The contract involves deepening and widening portions of the Middle Bay Channel in Irvington, Alabama. This work was solicited on an unrestricted basis under NAICS code 237990. Key subcontractors include Etrac, Inc. for hydrographic surveying and dredging quality management, W.W. Grainger, Inc. for supplies,...
- The Department of the Army Corps of Engineers awarded a $13.8 million firm fixed price contract to Great Lakes Dredge & Dock Company, LLC for dredging services in Mobile Harbor, Mobile County, Alabama. The contract was awarded under Solicitation Number W9127822B0007, which sought bids for dredging approximately 1 million cubic yards of material from the base channel as well as optional line items to dredge additional reaches totaling up to 175,000 cubic yards each. The prime contractor,...
- The U.S. Army Corps of Engineers, Mobile District, awarded a $61.6 million definitive contract to Great Lakes Dredge & Dock Co, LLC on August 20, 2024, for Mobile Harbor deepening and widening phase 2a, including dive operations to locate the anchor block for aid to navigation #14. The contract carries a firm fixed price structure with an ultimate completion date of June 24, 2025. Place of performance is Irvington, AL. The originating solicitation, posted May 22, 2024, sought bids under an...
The Department of the Army Corps of Engineers Mobile awarded a $45.7 million firm-fixed-price definitive contract to Norfolk Dredging Company for mobile harbor maintenance dredging on May 21, 2026, with no set-aside used. The originating solicitation, posted March 11, 2026, sought equipment, materials, supplies, and manpower for maintenance dredging of Mobile Harbor. The contract is classified under NAICS 237990 (Other Heavy and Civil Engineering Construction). Place of performance is Irvington, Alabama 36544. The period of performance extends through April 12, 2027. A subcontracting plan was required as part of proposal submission. The procurement was unrestricted and open to all eligible businesses registered in SAM.gov.
Generated 8/19/26, 9:46 AM
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Mobile Harbor Maintenance Dredging | W9127826BA001 | Department of the Army Corps of Engineers Engineering District Mobile | Solicitation 2/2 | 3/26/26, 8:57 AM | |
Mobile Harbor Maintenance Dredging | W9127826BA001 | Department of the Army Corps of Engineers Engineering District Mobile | Pre-Solicitation 1/2 | 3/11/26, 10:00 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $45.7m | 5/20/26 |