Definitive Contract W9126G22C0010

Award Date 7/22/22
Potential Completion Date 11/27/24
Potential Value $76M
Federal Agency
ENDIST Fort Worth
Awardee
Guyco Inc.
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Fort Cavazos, TX 76544, USA
Solicitation Procedures
Two Step
Number Of Offers Received
3
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a $59,761,587.80 firm fixed-price Design-Build contract awarded by the U.S. Army Corps of Engineers Fort Worth District to Guyco Inc., a for-profit subchapter S corporation, for the renovation of three Hammerhead Barracks (Buildings 10020, 10021, and 10022) at Fort Hood, Texas. The project scope includes complete interior and exterior renovations as well as new HVAC, plumbing, electrical, and telecommunications systems, with an estimated duration of 720 calendar days. This award is not...
This is a $68,543,997 firm-fixed price definitive contract awarded by the U.S. Army Corps of Engineers Fort Worth District to Guyco Inc., a for-profit subchapter S corporation, for the "WORK FOR BUILDING 10010" project. The contract is for the renovation and revitalization of five Hammerhead-style barracks buildings and one Central Energy Plant at Fort Hood, Texas. The original pre-solicitation notice sought information on capabilities and experience for this design-build project,...
This firm-fixed-price definitive contract was awarded by the U.S. Army Corps of Engineers Fort Worth District to Guyco Inc., a for-profit subchapter S corporation, for the design and construction of renovations to two existing Hammerhead-style barracks buildings (B10005 and B10007) at Fort Hood, Texas. The $33,844,767 project scope includes a complete first floor renovation, new standing seam metal roofs, exterior and interior finishes, replacement of the second and third floor barracks layouts,...
This firm-fixed price design-build contract with Guyco Inc. was awarded by the U.S. Army Corps of Engineers, Fort Worth District, to renovate 8 Hammerhead barracks at Fort Cavazos (formerly Fort Hood), Texas. The $188,287,774 contract includes structural repairs, mechanical and electrical system upgrades, exterior and interior renovations, and efforts to achieve LEED Silver certification. The 800-calendar day project was originally solicited through a sources sought notice that indicated the...
This is a definitive, firm-fixed-price contract awarded by the U.S. Army Corps of Engineers Fort Worth District to Guyco Inc., a for-profit subchapter S corporation, to revitalize and renovate five Rolling Pin barracks buildings at Fort Hood, Texas. The $57,221,942.37 project will replace the failing HVAC system, repair interior finishes, update living areas, renovate the exterior, provide storage rooms, and improve site drainage to increase the life expectancy of the barracks by 25 years. The...
This is a firm-fixed price, design-build construction contract awarded by the U.S. Army Corps of Engineers, Engineering District Fort Worth to Guyco Inc., a for-profit subchapter S corporation, for the renovation of unaccompanied enlisted personnel housing (UEPH) barracks at Fort Cavazos, Texas. The $93,946,000.00 contract will partially renovate existing barracks buildings, including updating room sizes and floor plans, replacing the motor control cabinet and upgrading lighting in one building,...
This is a $37,942,078 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) Fort Worth District to Cerris Builders, Inc. for the design and construction of an Unaccompanied Enlisted Personnel Housing (UEPH) facility at Fort Hood, Texas. The contract was not set aside for any specific business categories. The project involves the design and construction of a new UEPH facility to house up to 250 single soldiers, with a total gross area of approximately 93,750 square feet...
The Department of the Army Corps of Engineers Engineering District Fort Worth awarded a Definitive Contract to MW Builders, Inc., a for-profit organization and subchapter S corporation, to construct a Tactical Equipment Maintenance Facility at Fort Hood, Texas. The $36,077,933.45 firm fixed-price contract has a completion date of January 28, 2022 and was awarded on September 5, 2019. This contract was not set aside for any small business program. The original solicitation was a...
The Department of the Army Corps of Engineers Engineering District Fort Worth awarded a Firm Fixed Price Delivery Order contract to Whitesell Green, Inc., a for-profit Subchapter S Corporation, in the amount of $37,918,186.83 for the design and construction of revitalization of the 21000 block of the Rolling Pin Barracks at Fort Hood, Texas. The project aims to improve energy efficiency, mitigate mold growth, and provide a better living environment for soldiers that will last for the next 20...
This is a firm fixed-price delivery order awarded by the Department of the Army Corps of Engineers Engineering District Fort Worth to SGS LLC, a self-certified small disadvantaged, HUBZone, minority-owned and Native American-owned business. The $4,466,637.23 contract is for the repair and maintenance of Facility B705 located at Fort Hood, Texas. The work has a period of performance of 365 days, with a completion date of March 2, 2021. This delivery order was not set aside for any specific...

This is a $75,705,415.00 firm-fixed price definitive contract awarded by the U.S. Army Corps of Engineers, Fort Worth District to Guyco Inc., a for-profit subchapter S corporation, for the renovation of four Hammerhead barracks buildings at Fort Hood, Texas. The contract has an ultimate completion date of November 27, 2024 and was awarded on July 22, 2022 without any small business set-aside.

The contract scope includes structural repairs, upgrades to mechanical/electrical/plumbing systems, exterior finishes, and interior renovations to achieve LEED Silver certification for the four three-story barracks buildings with basements and company operation facilities. This effort is part of the Army Corps of Engineers' ongoing program to revitalize and renovate existing infrastructure at military installations, including previous barracks and central energy plant projects awarded to Guyco Inc. at Fort Hood.