Change Order
A00056 · Laydown, striping, demo,&leed
-$3,967
Definitize Change Order
P00012 · Site work erosion control repairs falfurrias checkpoint.
$1,175,185
Change Order
A00055 · Miscellaneous changes 5
$90,175
Change Order
A00054 · Miscellaneous changes 4
$87,046
Change Order
A00053 · Painting and safety changes part 2
$75,777
Change Order
A00052 · HVAC solutions admin building part 2
$438,871
Change Order
A00051 · Bird mitigation/ GAP closure/widen lane
$103,559
Change Order
A00050 · A00050 add 4 nema 3 boxes and grounding part 2
$12,938
Change Order
A00049 · SV058 miscellaneous changes 3
$49,816
Change Order
A00048 · A00048 safety and security changes part 2
$98,252
Change Order
A00047 · HVAC solutions admin bldg
$18,000
Change Order
A00046 · Erosion control repair
$184,000
Change Order
P00009 · Admin MOD to correct wage determinations
$0
Change Order
A00045 · Painting and safety changes
$70,000
Change Order
P00008 · Compensable days water well & misc mods
$2,947,775
Change Order
A00044 · Provide dids system
$27,346
Change Order
A00043 · Add four nema 3 boxes and ground buss
$11,200
Change Order
A00042 · MOD 42
$14,870
Change Order
A00041 · Signage and sallyport GAP reduction item 1. Refer to RFI 311, modify the interior signs to comply with ADA requirements. For sign type A1, and A2 (room #101…
$10,743
Change Order
A00040 · Safety and security changes
$32,000
Change Order
A00039 · Site work
$5,253
Change Order
A00038 · Erosion control provide for additional erosion control blanket, geotextile, storm drains with associated inlets, piping and riprap, curb and gutter, and…
$471,689
Change Order
A00037 · This is a time only modification and is related to the amendments listed below. There have been several modification to the contract that will require…
$0
Change Order
A00036 · Additional concrete for fuel island
$11,416
Change Order
A00035 · This is a not to exceed modification prior to definitization of a temporary potable water supply. Provide for all labor, material and equipment to implement…
$60,000
Change Order
A00034 · LPR bollard locations item 1. Place LPR bollards in the primary inspection lanes according to the adjusted locations in most updated drawings ES401, ES401A, and…
$8,337
Change Order
A00033 · Demolition and miscellaneous changes item 1. Change specification section 01 73 19, paragraph 2.1, in regards to the AC unit removal to include disposal of…
$22,137
Change Order
A00032 · Primary inspection lane adjustments item 1. Extend primary inspection commercial paving approximately three (3) feet to the west of the current limit of…
$128,628
Change Order
A00031 · Miscellaneous changes PCO log information. Included in pricing should be all associated costs for executing these changes as well as any credits due the…
$79,743
Change Order
A00030 · Commercial exit lane widening make changes to the commercial vehicle exit lane near the impound lot as follows: -add approximately 8' of reinforced concrete…
$193,477
Change Order
A00029 · High mast foundation change high mast pole foundation depth from 15 feet total length to 22 feet below grade, including any pavement depth if applicable, plus a…
$228,452
Change Order
A00027 · Miscellaneous changes - rfis item 01. Provide for backflow preventer and routing of compressed air for lift and took building as documented on RFI-0030. All…
$116,538
Change Order
A00026 · Traffic crossover and fire pump power item 1. Install an additional 1 inch conduit with 3#10 and 1#10G and 30A breaker, back-FED from panel KA, from the…
$22,678
Change Order
A00028 · HVAC changes implement changes from government responses to rfis 228, 229, 242, and 246. Include all costs and credits to the government in these changes as…
$10,182
Change Order
A00025 · Traffic signage
$35,278
Change Order
A00024 · Secondary building finished wall height extend 5/8" impact resistant glassmat gypsum board sheathing from 11'-0" AFF to roof deck in dry storage in secondary…
$26,249
Change Order
A00023 · Water facilities canopies: contractor will design and install roof only pre-engineered metal overhead canopy system for the water well in similar fashion to the…
$227,576
Change Order
A00021 · Upgrade fuel management system to passive type, changing use of key card to automatic tracking type system, using RF to identify vehicles and gather the…
$4,731
Change Order
A00022 · Add interview room cameras item 1. Interview room audio and video add 3 ceiling mounted cameras with audio and video capabilities at each interview room per the…
$109,804
Change Order
A00020 · Extend highway guard rails install 1,100 linear feet (LF) of TXDOT-compliant guard rail
$35,426
Change Order
A00019 · Item 1. Add six (6) clearing barrels around the admin building. Item 2. Install sixteen (16) clearing barrels in the secondary vehicle inspection area. Item…
$33,094
Change Order
A00018 · Concrete reinforcement, traffic light, B4 item 1. Reference RFI 213, drawings CP120 & CP121 show additional areas that need reinforcement via an overlay of…
$125,939
Change Order
A00017 · Privacy screen wall change the holding cells screen wall type to reinforced CMU, increase the height and length of the privacy wall to provide for adequate…
$3,967
Change Order
A00015 · MOD for increasing distance of license plate readers
$763
Change Order
A00016 · Revised traffic control
$23,992
Change Order
A00014 · Add air curtains for admin building
This is a $40,956,106.36 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Zachry Federal Construction Corporation, a subsidiary of Zachry Construction & Materials, Inc., for the construction of a Border Patrol station at the Falfurrias Checkpoint in Texas. The contract has a completion date of September 9, 2019 and was not set aside for any specific business type. As a construction contract for a Border Patrol facility, this award supports the high-level mission of the U.S. Customs and Border Protection agency.
Quick answers
Who was awarded contract W9126G16C0054?
W9126G16C0054 was awarded to Zachry Federal Construction Corporation by ENDIST Fort Worth (US Army Corps of Engineers) on September 23, 2016.
How much is contract W9126G16C0054 worth?
The government has obligated $40,956,106 on W9126G16C0054.
Was contract W9126G16C0054 competed?
The extent of competition for W9126G16C0054 was full and open competition. The government received 5 offers.