Definitive Contract W9123823C0018

Award Date 6/12/23
Potential Completion Date 2/9/25
Potential Value $15M
Federal Agency
ENDIST Sacramento
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Folsom, CA 95630, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
2
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a firm fixed-price delivery order awarded by the U.S. Army Corps of Engineers to AECOM Technical Services, Inc. to complete 35% and 65% design for the Folsom Dam Raise Project, Dikes 7 and 8, and Mormon Island Auxiliary Dam in Folsom, CA, with an option for 95% and 100% design. The $7,191,706.18 contract was issued under the Corps' $110 million South Pacific Geotechnical Engineering Indefinite Delivery/Indefinite Quantity (IDIQ) contract vehicle. AECOM, a global infrastructure services...
This is a firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers Engineering District Sacramento to Folsom Dam Constructors, a for-profit organization, for the elevation of the Folsom Main Dam, Left Wing Dam, and Right Wing Dam in Folsom, California. The contract is valued at $121,353,320.19 and has an ultimate completion date of July 6, 2027. The contract was not set aside for any specific business type. The project aims to increase flood protection for communities...
This is a $30,153,967.52 firm-fixed price construction contract awarded by the U.S. Army Corps of Engineers Engineering District Sacramento to Maloney-Odin A Joint Venture, a self-certified small disadvantaged business and HUBZone joint venture, to raise Dikes 1 through 6 at the Folsom Dam in California. The work includes embankment and dike construction, excavation, compaction, concrete work, and utility relocation services. This unrestricted contract was competitively awarded based on price,...
The U.S. Army Corps of Engineers, Sacramento District awarded a firm-fixed-price definitive contract to Odin Environmental Solutions, LLC, a small business, to raise Dike 8 of the Folsom Dam in Folsom, California by approximately 3.5 feet to Elevation 486.34 ft (NAVD 88). The contract, valued at $4,228,248.73, includes the installation of a downstream filtered chimney/blanket drain and upstream riprap protection. This project is part of the broader Folsom Dam Raise effort, which was authorized...
<p>This is a firm fixed-price delivery order awarded by the U.S. Army Corps of Engineers (USACE) to HDR Fugro WLA, a for-profit subchapter S corporation, for engineering design and review support for a dam raise gate modification project in Folsom, California. The contract ceiling value is $196,227.04 and the ultimate completion date is May 31, 2016. This order is not associated with a set-aside program. The award is a standalone contract and not part of a larger contract vehicle.</p>
This is a firm fixed-price construction contract awarded by the Bureau of Reclamation, a civilian federal agency, to Suulutaaq, Inc., a small disadvantaged business, for the Folsom Right Wing Dam - North Fork Ditch Bypass Modification project. The $5,005,410.00 contract involves removing existing conduit, removing a concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. The project aims to improve seepage stability and modify the existing dam...
This is a Firm-Fixed Price construction contract awarded by the U.S. Army Corps of Engineers Engineering District Sacramento to NMI Industrial Holdings Inc. for the Folsom Dam Bulkhead Gate Corrosion Repair project. The contract has a ceiling value of $2,147,300.00 and a performance period extending through July 22, 2023. It was awarded on August 29, 2022 as a 100% Small Business set-aside under NAICS code 237990 for Other Heavy and Civil Engineering Construction. The contractor will provide...
This federal contract award, valued at $1,753,072.49, was issued by the U.S. Army Corps of Engineers (USACE) to Newland Entities, Inc., a small disadvantaged business, for the Right Bank Stabilization Project. This project is part of the larger Joint Federal Project Phase V, which addresses the potential destabilization of the existing slope where flows converge from the main Folsom Dam and new auxiliary spillway in Folsom, California. The primary objective is to ensure the slope between...
This is a firm fixed price delivery order awarded by the U.S. Army Corps of Engineers to AECOM Technical Services, Inc. for the Folsom Dam Raise Project in Folsom, California. The $2,913,285.38 order is for 35% and 65% design work on the right and left wing dams. AECOM Technical Services, a subsidiary of AECOM, was selected without a set-aside designation to provide engineering, construction management, and other services for this flood control infrastructure project. Major subcontractors...
The U.S. Department of the Interior Bureau of Reclamation awarded a $410,515.00 Firm Fixed Price Definitive Contract to A California Corporation Division 5-15 for metalwork improvements at the Folsom Dam and Dikes in Folsom, California. The contract, which was set aside for small businesses, includes the design, fabrication, and installation of ladders, stair systems, pedestrian bridges, and guardrailing for safe access and maintenance of the dam facilities. This contract was issued under...

This is a firm-fixed price contract awarded by the U.S. Army Corps of Engineers, Sacramento District to Ahtna-Great Lakes E&I JV, a small business joint venture, to raise the Mormon Island Auxiliary Dam (MIAD) as part of the Folsom Dam Raise Flood Risk Management project. The contract has a ceiling value of $14,521,677.49 and a completion date of February 9, 2025. The work includes raising the 4,900-foot long dam crest by 3.5 feet and installing a 30-inch wide seepage cutoff wall averaging 17 feet deep. This contract was initially a small business set-aside opportunity, and the agency is seeking responses from small businesses in various socioeconomic categories to determine the appropriate acquisition strategy.

Generated 5/4/25, 12:48 AM