Scope of work (SOW) consists of various requirements to construct a 2,400 SF (40' X 60') fuel distribution pump house demolish existing fuel lines, manifolds, and valves this project replaces.…

Ended Definitive Contract Awarded Last action

Contract number
W9123819C0010
Awardee
Awarding agency
Obligated
$20,105,075

Award facts

Opportunity
Contract value 98% obligated
  • $20,105,075.47 Current, with exercised options
  • $20,473,367.47 Potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
Total Small Business
Competition
Full and Open Competition after exclusion of sources · 3 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Hill AFB, UT 84056, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope A00020 · Fuel piping VC18 & 29/R00018/A00020 - unforeseen site conditions/contaminated soil $73,474
Supplemental Agreement for work within scope A00019 · VC-019 R00026 relocation of contaminated soil relocation of contaminated soil relocate approximately 267 CY of contaminated soil. $29,934
Supplemental Agreement for work within scope A00018 · Fuel piping reference no. R00025 VC027 asbestos fuel line at old pump house VC028 pumphouse pipe pier delay $34,293
Supplemental Agreement for work within scope A00017 · Fuel piping reference no. R00024 VC025 pier support changes VC026 remove asbestos fuel LINES1 $49,976
Supplemental Agreement for work within scope A00016 · Fuel piping reference no. R00023VC023 fill stand CONCRETEVC024 neta testing & site gauges. -$65,939
Supplemental Agreement for work within scope A00015 · Fuel piping VC022/ R00022 veeder-root ATG conduits $32,451
Supplemental Agreement for work within scope A00014 · Fuel piping VC021/R00021 intrinsically safe $40,148
Supplemental Agreement for work within scope A00013 · Fuel piping VC020/R00020 fire alarm -$8,705
Supplemental Agreement for work within scope A00012 · Fuel piping VC-015 ball joints & PVR VC-016 water heater power VC-017 underground asbestos fuel lines $77,872
Supplemental Agreement for work within scope A00011 · Fuel piping reference no. R00011 VC012 phasing for tank 10882 VC014 internal piping for tank 108851. $117,910
Supplemental Agreement for work within scope A00010 · Fuel piping VC007/R00010 cathodic protection $7,907
Supplemental Agreement for work within scope A00009 · Fuel piping VC010 electrical feeds field route underground secondary's from pumphouse transformer, T-1 480V secondary, to rack unit T-4 as per drawing markup… $52,665
Supplemental Agreement for work within scope A00008 · Fuel piping VC011 storm drain install an area inlet on the existing 12" storm line an additional inlet on the south side of the pumphouse road on the existing… $16,337
Supplemental Agreement for work within scope A00007 · Fuel piping VC009/R00007 lower water line $20,836
Supplemental Agreement for work within scope A00005 · Fuel piping W9123819C0010 VC008/R00006 site pipe elevations $22,351
Supplemental Agreement for work within scope A00004 · Fuel piping W9123819C0010 R00005/VC005 reroute comm & VC006 tank 10885 repairs $102,412
Supplemental Agreement for work within scope A00003 · Fuel piping R00004/VC004 fiber and CP VC004 fiber & CP item 1 connect fiber at actual termination point approx. 2000 feet west of location indicated on sheet… -$24,012
Supplemental Agreement for work within scope A00002 · Fuel piping VC001-R00001 sewer changes 1.1 remove requirement to "remove existing manhole and 8-inch sanitary sewer" as shown on attached redlined CU-100. 1.2… -$12,940
Supplemental Agreement for work within scope A00001 · Fuel piping VC003 remove pipes remove pipes discovered during excavation from underneath the pump house footprint. Pipes are known to have ACM and must be… $58,354
Exercise an Option P00001 · Exercises option clin 1004 auto tank gauging system $14,683
Original award $19,465,068
Show all 21

About this award

This is a firm-fixed-price design-bid-build construction contract awarded by the U.S. Army Corps of Engineers, Sacramento District to CTI Companies, LLC (doing business as CTI Construction), a small business based in Ogden, Utah. The contract is for the construction of a 2,400 square foot fuel distribution pump house to replace Building 870 at Hill Air Force Base (AFB) in Utah. The work includes demolishing existing fuel lines, manifolds, and valves, as well as demolishing Building 870. The contract has a ceiling value of $20,473,367.47 and was awarded on March 29, 2019 with a completion date of January 1, 2022. This contract was set aside for small businesses. CTI Companies, LLC holds a significant Indefinite Delivery Contract (IDV) through the Front Range Multiple Award Construction Contract with the Air Force Sustainment Center, which has a potential value of $105,555,556 and covers design-build services, maintenance, repair, and minor construction work across various Air Force installations.

Description

Scope of work (SOW) consists of various requirements to construct a 2,400 SF (40' X 60') fuel distribution pump house demolish existing fuel lines, manifolds, and valves this project replaces. Demolish bldg. 870.

Quick answers

Who was awarded contract W9123819C0010?

W9123819C0010 was awarded to CTI Companies, LLC by ENDIST Sacramento (US Army Corps of Engineers) on March 29, 2019.

How much is contract W9123819C0010 worth?

The government has obligated $20,105,075 on W9123819C0010. Its potential value, with all options, is $20,473,367.

Was contract W9123819C0010 competed?

The extent of competition for W9123819C0010 was full and open competition after exclusion of sources. The government received 3 offers. It was set aside: Total Small Business.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award