Construction of upstream approach walls, new SOO lock complex, sault STE. Marie, MI.

Ended Definitive Contract Awarded Last action

Contract number
W911XK20C0018
Awardee
Awarding agency
Obligated
$135,073,800

Award facts

Contract value 83% obligated
  • $135,073,799.86 Current, with exercised options
  • $163,618,799.86 Potential, with all options
Completion date 100% complete
Current and potential, with all options
Contracting staff
Funding agency
US Army Corps of Engineers Department of the Army, Department of Defense
Set-aside
No set-aside
Competition
Full and Open Competition · 3 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Sault Ste. Marie, MI 49783, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope P00010 · Modification for finalizing the soldier pile and Z6 change. Total is funding is $600,000.00 provided in P00005 and shown as CH0022 in RMS, and $517,110.00… $517,110
Supplemental Agreement for work within scope P00009 · P00009 panel wall fill material change. Completion of two part modification with P00005 as the first part. This changes the material between the sheet pile… $1,320,374
Change Order A00012 · A00012 time extension for 15 days. This MOD extends the CCD to 7 september 2024 in order to provide time to process the financial portion of change 00031 UAW… $0
Supplemental Agreement for work within scope A00011 · A00011 power tie in for project completion. Removes power tie in requirements as phase 3 contractor has removed the tie in location and will install upon… -$8,712
Change Order P00008 · Modification to extend POP $0
Change Order P00007 · Not to exceed modification for the upstream approach wall $2,500,000
Supplemental Agreement for work within scope A00010 · A00010 transition at end of zone 7A. Contract did not provide a provision for how to end the wall at the end of zone 7A, thereby letting material migrate out of… $102,936
Supplemental Agreement for work within scope A00009 · A00009 CH00026 zones 6 & 7A void fill. Fills voids in crib DAM discovered once the cap was removed. $11,510
Supplemental Agreement for work within scope A00008 · A00008 reduction of instrumentation monitoring and removal of temporary power to north west pier. Work around railroad did not include blasting so monitoring… -$193,800
Supplemental Agreement for work within scope A00007 · A00007 for zone 5-7A alignment, soldier pile cap, and zone 4-5 concrete surface. Project adjusted alignment and caps so that mooring ships have a consistent… $187,328
Supplemental Agreement for work within scope P00006 · P00006 west center pier descoping. Deteriorating wall does not allow for proper installation of new timber assemblies. Work removed from project. -$420,043
Change Order P00005 · Modification for the change to sheet piling length from 43 feet to 43 feet based on the conditions found at site. $600,000
Supplemental Agreement for work within scope A00006 · A00006 concrete surface locations. Bastille bridge was closer to the sidewalk than shown in the plans. This MOD moves the sidewalk and driving surface for… $2,100
Supplemental Agreement for work within scope P00004 · FY20 SOO lock upstream approach walls REA $12,123,879
Supplemental Agreement for work within scope A00005 · A00005 zone 7A and zone 6 crib DAM investigation. Sloughing of material under the crib dams into the channel has caused concern for the contract design.… $1,620
Supplemental Agreement for work within scope A00004 · A00004 CH00015 concrete cap allignment for zones 1 and 2. Concrete caps are not in a straight line according to surveys where the plans drawing assumed they… $249,926
Supplemental Agreement for work within scope A00003 · A00003 - 7A wedge removal is required in order to ensure sheet pile and soldier pile seat correctly. Lighting and breaker is required to ensure there is… $79,612
Supplemental Agreement for work within scope A00002 · A00002 bollard reinforcement additional reinforcement is needed to retain ship mooring, and, zone 12 $ 14 end conditions the end conditions for the terminal… $45,537
Supplemental Agreement for work within scope A00001 · This is a contract modification to adjust the hook dowel reinforcement as well as adjust the deadman anchor installation. Required for the work to function… $241,581
Supplemental Agreement for work within scope P00003 · This contract modification changes the required height of light poles from the existing 30-foot-tall systems to 50-foot-tall systems and incorporates associated… $555,801
Supplemental Agreement for work within scope P00002 · FY20 upstream approach walls (UAW) - modification issued for 00004 zone 1 tunnel/tremie concrete $246,040
Exercise an Option P00001 · Upstream approach wall construction for the SOO lock complex, sault STE. Marie, MI. Modify contract to exercise option 7, zone 7A work: soldier pile wall $5,652,000
Original award $111,259,000
Show all 23

About this award

This is a $163,618,799.86 firm-fixed price construction contract awarded by the U.S. Army Corps of Engineers to Kokosing Alberici, LLC for the construction of upstream approach walls for the new Soo Lock Complex in Sault Ste. Marie, Michigan. The contract was competitively bid and does not have a set-aside designation. The work supports the Army Corps of Engineers' civil works programs focused on water infrastructure improvement projects. Kokosing Alberici, LLC is a joint venture between Kokosing Construction Co. and O'Brien & Gere, which has been awarded previous Army Corps of Engineers contracts for environmental remediation and construction services related to water treatment and dredging.

Quick answers

Who was awarded contract W911XK20C0018?

W911XK20C0018 was awarded to Kokosing Alberici, LLC by ENDIST Detroit (US Army Corps of Engineers) on August 31, 2020.

How much is contract W911XK20C0018 worth?

The government has obligated $135,073,800 on W911XK20C0018. Its potential value, with all options, is $163,618,800.

Which agency awarded contract W911XK20C0018?

ENDIST Detroit (US Army Corps of Engineers) awarded W911XK20C0018, with funding from US Army Corps of Engineers (Department of the Army).

Was contract W911XK20C0018 competed?

The extent of competition for W911XK20C0018 was full and open competition. The government received 3 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award