C0120-EIE226 contract [327353] --- project. This project will design and construct two boilers used for central heat and power plant at eielson air force base alaska.

Ended Definitive Contract Awarded Last action

Contract number
W911KB11C0009
Awardee
Awarding agency
Obligated
$67,711,215

Award facts

Opportunity
Contract value 100% obligated
$67,711,215.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Y199 Construct/Misc Bldgs
Set-aside
No set-aside
Competition
Full and Open Competition · 3 offers Two Step
Pricing
Firm Fixed Price
Place of performance
Eielson AFB, AK 99702, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Change Order P00018 · 1. Upgrade the redundant CCS PLC hardware for boilers 5 & 6 and all peripheral hardware required to allow boilers 5 and 6 to run concurrently as per alternate… $0
Change Order P00017 · 1. Provide continuous emissions and continuous opacity monitoring systems (cems and coms) data acquisition and handling systems (DAHS) that are fully… $0
Change Order P00016 · Contract no. W911KB-11-C-0009 for "EIE226, replace boilers (boiler 6) phase 1 at eielson AFB, alaska" is hereby modified for a settlement of claim for… $7,900,000
Change Order P00014 · C0120-EIE319 contract [330346] --- proje $49,776
Change Order P00015 · EIE226-319, replace boilers phase 1 & 2, eielson AFB, AK $555,737
Change Order P00013 · Install 2(EA)-16" steam valves/flanges (government furnished) into 100# extraction/steam to base system on lines from turbines 3-4 and 5 at locations shown on… $43,117
Change Order P00012 · The scope remains the same as the part 1A (P00011) modification. This part 2 final is being issued as a unilateral modification; as such you are directed to… $152,975
Change Order P00011 · Delete paragraph from the part 1 NTP reading: "provide labor, equip and material to design and modify the current steam outlet attemperation. Steam… $0
Change Order P00010 · Provide labor, equip and material to design and modify the current steam outlet attemperation. Steam attemperation shall be done internal to the superheater, to… $150,000
Supplemental Agreement for work within scope P00009 · Provide for the following: - additional abatement of asbestos containing material not estimated in the original contract RFP, to include tile refractory, mortar… $2,992,105
Supplemental Agreement for work within scope P00008 · Provide design, material, equipment, and labor to relocate the required BIN vent filters and ports for emission source testing from the top of the sorbent… $185,691
Supplemental Agreement for work within scope P00007 · Add twenty-two (22) compensable calendar days to the contract. The two-party agreement between the air force and alaska department of conservation & the… $324,004
Supplemental Agreement for work within scope P00006 · Provide new roof decking in lieu of replacing the old decking when sealing the roof opening. IT is not required that the same profile of the existing roof be… $17,065
Supplemental Agreement for work within scope P00005 · Provide labor, and ancillary equipment/tools to support complete drainage of the glycol system in the power plant needed to continue construction of the new… $24,961
Change Order P00004 · The contract EIE226/319, replace boilers chpp PH 1 & 2, eielson AFB, alaska is modified as follows: case 7-1, glycol draining. Provide labor, and ancillary… $5,000
Supplemental Agreement for work within scope P00003 · C0120-EIE226 contract [327353] --- proje- case 3-2, additonal abatement of ACM required, part 2, final. This is a part 2, final of a two part modification.… $748,520
Change Order P00002 · C0120-EIE226 contract [327353] --- proje- case 3-1, additional abatement of ACM required, part 1, NTP. This is a part 1 of a two part modification. The amount… $600,000
Supplemental Agreement for work within scope P00001 · C0120-EIE226 contract [327353] --- proje - case 1, time extension, delay demo. Delay demolition activities on boiler no.L 6 until march 1, 2012. Increase… $0
Original award $53,962,264
Show all 19

Quick answers

Who was awarded contract W911KB11C0009?

W911KB11C0009 was awarded to Haskell Corp by ENDIST Alaska (US Army Corps of Engineers) on June 2, 2011.

How much is contract W911KB11C0009 worth?

The government has obligated $67,711,215 on W911KB11C0009.

Was contract W911KB11C0009 competed?

The extent of competition for W911KB11C0009 was full and open competition. The government received 3 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award