Definitive Contract INR13PC43006

Award Date 9/9/13
Potential Completion Date 9/30/14
Potential Value $1.2M
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
8(a) Sole Source
Extent Competed
Not Available for Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Albuquerque, NM 87102, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This Delivery Order for $2,500 is issued against the Department of the Interior Bureau of Reclamation's indefinite-delivery/indefinite-quantity contract vehicle for Canal Construction, Repair and Replacement in the Lower Colorado Basin States of Arizona, Nevada and California. The contract is set aside for qualified HUBZone small businesses and concerns canal infrastructure work through September 2025. Standard Construction Company, Inc. of Palo Verde, California is the prime contractor tasked...
This indefinite delivery/indefinite quantity contract from the Department of the Interior's Bureau of Reclamation awards Task Order 2 under the CANAL CONSTRUCTION, REPAIR AND REPLACEMENT vehicle to AC Lopez Construction Inc., an SBA-certified HUBZone small business. The task order has a potential value of $0.00 and requires the contractor to provide canal construction, repair, and replacement services in the Lower Colorado Basin states of Arizona, Nevada, and California through March 2023. The...
Gutierrez Canales Engineering, P.C. was awarded a firm fixed price delivery order against the CANAL LINING REPAIR AND REPLACEMENT, IDIQ vehicle held by the Bureau of Reclamation. This $729,592 task order is for bypass drain concrete panel replacement in Yuma, Arizona, with work to be completed by September 30, 2021. No set-aside designation was applied to this award to replace concrete panels as part of canal infrastructure repairs and maintenance carried out by the Bureau of Reclamation in...
<p>The Department of the Interior Bureau of Reclamation (DOI) awarded a $591,890.85 Firm Fixed Price Delivery Order to AC Lopez Construction Inc. to perform TASK ORDER FOR MOD/MODE CANAL REPAIRS in Yuma, Arizona. The work will be conducted between March 22, 2023 and May 23, 2023. No subcontractors were identified. The prime contractor AC Lopez Construction Inc. will provide construction services to repair canals as specified in the task order from the DOI Bureau of Reclamation.</p>
The Department of the Interior Bureau of Reclamation awarded a $1.3 million firm fixed price delivery order to Site Work Solutions for a task order to replace an irrigation canal at the Dennis Underwood Conservation Area in Palo Verde, California. Site Work Solutions, a division of the prime contractor Site Work Solutions, will perform the work over a six-month period ending in April 2021. The contract has a HUBZone set aside designation. The Bureau of Reclamation oversees water and power...
The Department of the Interior Bureau of Reclamation (DOI) awarded a $2,398,645.23 firm fixed price definitive contract to Syblon-Reid CO., doing business as Syblon-Reid Co., to reconstruct portions of the Folsom South Canal (FSC) bank that have experienced slope failures due to bank saturation. The goal of the project is to restore the canal to its original operational condition at the location on the FSC in Rancho Cordova, California. The period of performance for reconstruction services is...
The Bureau of Reclamation awarded a $31,658,561.08 firm-fixed-price contract to Central Environmental Inc., a minority-owned, Alaska Native Corporation and self-certified small disadvantaged business, to line a section of the Truckee Canal with concrete over a geomembrane barrier, repair/replace two check structures, and perform general repairs at the site in Fernley, Nevada. This contract was set aside for small businesses and is part of the Truckee Canal Extraordinary Maintenance (XM)...
This is a Definitive Contract awarded by the Bureau of Reclamation, a Civilian agency, to BCI Construction USA, Inc., a Veteran Owned Small Business and Service Disabled Veteran Owned Small Business. The contract, valued at $1,828,916.30, is for the Madera Canal Headworks Low-Flow Valve project, which involves construction and infrastructure maintenance services. The contract is a Firm Fixed Price contract and was set aside for Total Small Businesses. BCI Construction USA, Inc. has been...
This firm fixed price contract was awarded by the Department of the Interior Bureau of Reclamation to DH Ortega Construction LLC, doing business as Dano Builders, for the replacement of an irrigation canal in Show Low, Arizona. The $176,246.06 contract has a HUBZone set-aside designation, indicating Dano Builders is a small disadvantaged business operating in an economically distressed area. Dano Builders is a minority-owned limited liability company that has previously been awarded federal...
The Bureau of Reclamation, a civilian federal agency, awarded a firm-fixed-price delivery order contract to AC Lopez Construction Inc., a small business, to perform repairs and maintenance on the MOD/MODE/US Bypass Canal in Yuma, Arizona. The contract has a ceiling value of $736,561.82 and a completion date of May 25, 2024. AC Lopez Construction Inc. is a certified 8(a) Program Participant, Women-Owned Small Business, and HUBZone Firm, and has previously undertaken various infrastructure...

CRITICAL FUNCTION - ORCHARD MESA IRRIGATION DISTRICT MODERNIZATION CANALS 1-2

Posted 9/9/13, 12:00 AM