- This is a $156,827.70 firm fixed-price delivery order awarded by the National Park Service Intermountain Region to All-Rite Construction, Inc., an SBA-certified HUBZone and small disadvantaged business based in Albuquerque, New Mexico. The contract is for the repair of the existing single-ply membrane roof, approximately 8,000 square feet, at the Carlsbad Caverns National Park visitor center to correct deficiencies such as at flashing, terminations, penetrations, and seams. This work is being...
- This is a $4,416,575.84 firm fixed-price definitive contract awarded by the National Park Service (NPS) Denver Service Center to Guardian Construction, Inc., an SBA-certified 8(a) small disadvantaged minority-owned business based in Layton, Utah. The contract is for construction, repair, renovation, and infrastructure improvement services at Carlsbad Caverns National Park in Carlsbad, New Mexico. The contract has an ultimate completion date of February 28, 2026 and was awarded on September 26,...
- This is a $96,052.95 firm fixed-price delivery order contract awarded by the National Park Service Intermountain Region to All-Rite Construction, Inc., an SBA-certified HUBZone and small disadvantaged business based in Albuquerque, New Mexico. The contract is for asbestos abatement and flooring replacement at two office buildings in Carlsbad Caverns National Park in Carlsbad, New Mexico. This work is being performed under a $40 million multiple-award indefinite delivery/indefinite quantity...
- The National Park Service awarded a Firm Fixed Price delivery order contract to Project Solutions, Inc., a certified woman-owned small disadvantaged business, for construction management and related services supporting the replacement of structural steel and elevators at Cave 219342 in Carlsbad Caverns National Park in Carlsbad, New Mexico. The contract has a ceiling value of $86,316.00 and a period of performance through September 30, 2024. This contract is being issued under the General...
- This is a $229,645.34 firm fixed-price definitive contract awarded by the National Park Service, a bureau of the Department of the Interior, to Supplied Industrial Solutions Inc., a veteran-owned 8(a) participant small business. The contract is for structural steel repairs to elevators 1 and 2 at Carlsbad Caverns National Park in New Mexico, with a completion date of May 13, 2019. Supplied Industrial Solutions Inc. is a design-build contractor and industrial supplier that has previously...
- This firm fixed-price delivery order was awarded by the National Park Service to HDR Engineering Inc., a large engineering, architecture, and environmental consulting firm, to provide construction management services for structural repair and lead-based paint abatement in the elevator shaft at Carlsbad Caverns National Park in New Mexico. The $196,974.00 contract was issued under the Professional Engineering Services (PES) schedule of the General Services Administration (GSA). It did not utilize...
- This is a $260,793 firm-fixed-price definitive contract awarded by the National Park Service (a civilian agency) to Supplied Industrial Solutions, Inc., an 8(a) certified, service-disabled veteran-owned, minority-owned small business. The contract is for temporary structural steel repairs to elevators 1 and 2 at Carlsbad Cavern National Park in Carlsbad, New Mexico. The work is classified under the major program code "TEMPORARY STRUCTURAL STEEL REPAIRS FOR ELEVATORS 1 & 2" and...
- This is a firm fixed-price delivery order contract awarded by the Department of the Interior National Park Service to Project Solutions, Inc., a woman-owned small business based in Rapid City, South Dakota. The contract, valued at $1,019,693.71, is for CCMR (Construction, Compliance, Maintenance, and Repair) services to replace structural steel and elevators 1 and 2 at Carlsbad Caverns in New Mexico. The work is scheduled for completion by January 31, 2024. Project Solutions, Inc. has a...
- The U.S. National Park Service Intermountain Region awarded a $178,182.71 firm fixed-price delivery order to All-Rite Construction, Inc. for repair and replacement of lift station equipment at Carlsbad Caverns National Park in Carlsbad, New Mexico. The contract was awarded on June 13, 2023, with an ultimate completion date of December 19, 2025, following a modification that extended the period of performance to allow for final project tasks. No set-aside designation was used for this award....
- This is a firm fixed-price delivery order contract awarded to All-Rite Construction, Inc., an SBA-certified HUBZone and small disadvantaged business based in Albuquerque, New Mexico. The contract, valued at $210,724.00, was awarded by the National Park Service Intermountain Region for the re-roofing of Building 25 at Carlsbad Caverns National Park in New Mexico. The primary work includes the removal of the existing spray-on roofing and foam insulation system and the installation of a new...
This is a $5,253,064.25 definitive firm-fixed price contract awarded by the National Park Service, a civilian agency within the U.S. Department of the Interior, to Ash & White Construction Co. (doing business as White Construction Group) for structural repairs and lead-based paint abatement in the primary elevator shaft at Carlsbad Caverns National Park in New Mexico. The award does not have a set-aside designation. White Construction Group is a self-certified small disadvantaged business that has received previous task order awards from the U.S. Mint to perform renovation and facility maintenance services at the Mint's Denver facility in Castle Rock, Colorado. The current contract supports the National Park Service's efforts to maintain and upgrade infrastructure at Carlsbad Caverns National Park.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
RECOVERY TAS::14 1041:: CAVE PMIS # 116245 Structural Repair and Lead Based Paint Abatement in Primary Elevator Shaft NAICS - 238120 | N2011101095 | Department of the Interior National Park Service | Award Notice 1/1 | 2/23/10, 2:03 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 18 | Supplemental Agreement for work within scope | $1.0m | 8/6/13 | |
| 17 | Change Order | $10.0k | 4/19/13 | |
| 16 | Change Order | $91.6k | 4/3/13 | |
| 15A | Change PIID | $0 | 11/15/12 | |
| 15 | Change Order | $6.0k | 8/30/12 |