Construction manager as constructor (CMC) services for the modernization of the herbert C hoover building, washington, DC

Ended Definitive Contract Awarded Last action

Contract number
GS11P06MKC0030
Awardee
Awarding agency
Obligated
$341,463,642

Award facts

Opportunity
  • GS11P06MKC0030 Solicitation number
Contract value 99% obligated
$345,080,519.88 Current and potential, with all options
Completion date 100% complete
  • Current, with exercised options
  • Potential, with all options
Contracting staff
Funding agency
Office of the Secretary Department of Commerce
Set-aside
No set-aside
Competition
Full and Open Competition · 3 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Washington, DC 20407, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Funding Only Action PAR3 · MOD PA86 for the construction contract at the herbert hoover federal buiding in washington, DC -$38
Other Administrative Action POQ7 · POP extension $0
Supplemental Agreement for work within scope PSQ5 · CE 4 352 changes to doavs units 4.1 and 4.2, 91 day no cost extension $52,530
Supplemental Agreement for work within scope PSQ4 · Correction (CREDIT) double entry of $22,858 - power supplies for security doors, power for SOC master control, fitness center stall door swing conflict / toilet… -$18,512
Supplemental Agreement for work within scope PSQ3 · Counterflashing over waterproofing in courtyard, delays due to steam condensate failure during sump pump SP-13 installation $6,953
Supplemental Agreement for work within scope PSQ2 · Provide labor, materials, supervision and equipment for sprinkler head in electric closet, wood casing in corridor 8 at existing frame $5,955
Supplemental Agreement for work within scope PSQ1 · POP extension for closeout $0
Supplemental Agreement for work within scope PSP9 · PH 4: stair pressure louvers PT 2, waterproofing, basement corridor 8 finishes N of PH4/5 line, transition cable tray/wall PH 3/4 corridor 0 $82,870
Supplemental Agreement for work within scope PSP8 · Drain pan and pipe above womens shower stall in fitness area, removal of construction sign on 14TH and penn $11,676
Supplemental Agreement for work within scope PSP7 · Provide labor, materials, supervision, and equipment to relocate fitness center lights $9,719
Supplemental Agreement for work within scope PSP6 · Revisions to barrier master control, paint deck delete ceiling paint room B3010 $74,340
Supplemental Agreement for work within scope PSP5 · Replace light fixture over vanities , 15TH street moat conduit sensor $15,761
Supplemental Agreement for work within scope PSP4 · CE 4-336 steam vent insulation CE 4-337 fitness center lavatory faucets $23,908
Supplemental Agreement for work within scope PSP3 · Various CES $140,336
Definitize Change Order PSP2 · Definitize various PDL directives adjust ceilings, provide bulkhead fitness center area, 2 replacement graham window in basement $53,044
Supplemental Agreement for work within scope PSP1 · Definitizing CE 4 322 fitness center water infiltration and agreement of CE 4 312 garage door repairs $84,688
Change Order PCO9 · PDL miscellaneous CES fire alarm relay for turnstiles, water intrusion mitigation $24,141
Change Order PCO8 · Various CES credit, bulletin 59, fitness center water infiltration courtyard, etc. $74,628
Supplemental Agreement for work within scope PSO7 · Definitize bulletin 68 $1,448,834
Change Order PCO6 · Bulletin 68, courtyard pipe, drain line $92,043
Other Administrative Action PAO5 · Change designated billing office code $0
Change Order PCO4 · PDL corridor 8 under drain connections $20,000
Change Order PCO3 · PDL NTE to provide labor, materials, supervision and equipment to remove damaged wet bathroom finishes on 6TH and 7TH FL and video of 2 pump room drain lines $12,500
Supplemental Agreement for work within scope PSO2 · Section 889 $0
Change Order PCO1 · PDL NTE bulletin 68 GEN cond 50 percent $345,525
Supplemental Agreement for work within scope PSN9 · To provide labor, materials, supervision and equipment for install lighting controls cancelled credit additional core drills in SOC, clean and decontaminate… $748
Change Order PCN8 · CE 4-104 bulletin 68 - fitness center design: trench layout and surveying design and plan for dewatering and shoring MEP coordinated drawings to include… $527,000
Change Order PCN7 · PDL NTE to provide labor, materials, equipment and supervision for CE 4-290 reagan tunnel entrance and basement corridor 0 HVAC and CE 4-292 occupancy sensors $30,250
Change Order PCN6 · PDL bulletin 68 fitness center design trench layout and surveying, design and plan for dewatering and shoring, MEP coordinated drawings to include mechanical… $150,000
Change Order PCN5 · Various CES $12,892
Change Order PCN4 · PDL NTE to provide labor, materials and supervision for CE 4-301 fitness center geotech evaluation and CE 4-305 relocating piping at chiller plant $34,069
Change Order PCN3 · Clin 0510 CE 4 301 slab elevation and geotechnical evaluation fitness center clin 0521 CE 4 299 radio room and SOC telco relocating from 10046B to B0048ST… $6,506
Change Order PCN2 · Provide labor, supervision and materials for the following CE 4 250 phase 4 security door roughin, CE 4 297 phase 4 blocking in room 18050 video wall changes,… $43,604
Change Order PCN1 $17,252
Change Order PCM9 $25,000
Change Order PCM8 $35,000
Supplemental Agreement for work within scope PSM7 · GS11P06MKC0030 CMC services for the department of commerce modernization wash DC MOD PSM7 miscellaneous CES for phase 4 the contractor's signature in block… $21,962
Other Administrative Action PAM6 · Contract GS11P06MKC0030, construction manager as constructor CMC services for the hchb major modernization project, wash., DC modification PAM6: unilateral,… $0
Change Order PCM5 $481,079
Supplemental Agreement for work within scope PSM4 $90,300
Funding Only Action PAM3 · GS11P06MKC0030 CMC services for the department of commerce modernization, wash., DC unilateral MOD PA41 - DE-obligation of allowance funding effective with… -$250,000
Supplemental Agreement for work within scope PSM2 · Contract GS-11P-06-MK-C-0030 CMC services for the department of commerce modernization, wash., DC. Modification number MOD PSM2 miscellaneous CES the… $15,641
Other Administrative Action PAM1 · Phase 4 POP extension $0
Supplemental Agreement for work within scope PSL9 · Provide labor, materials and supervision to complete various CES for phase 4, CMC services for the department of commerce modernization, wash., DC $190,368
Supplemental Agreement for work within scope PSL8 · Various miscellaneous CES $265,516
Funding Only Action POL7 · Additional PDL funding for clin 305 fitness center $67,000
Other Administrative Action PAL6 · Phase 4 base contract period of performance extension from 04.1.18 to 07.02.18 $0
Supplemental Agreement for work within scope PSL5 · Various CES, final change orders $1,615,765
Change Order PCL4 · Unilateral definitiztion of various CE change order directives $10,494
Supplemental Agreement for work within scope PSL3 · Various phase 4 CES $150,711
Show 40 more

Latest 50 listed here. See the rest on GovTribe.

About this award

The General Services Administration awarded a $345.08 million definitive contract to Gilbane-Grunley JV for construction manager as constructor (CMC) services for the modernization of the Herbert C. Hoover Building in Washington, DC, on November 26, 2007.

The contract covers CMC services under a firm fixed price structure with a ceiling value of $345.08 million. Place of performance is Washington, DC. The ultimate completion date was September 30, 2022.

Quick answers

Who was awarded contract GS11P06MKC0030?

GS11P06MKC0030 was awarded to Gilbane-Grunley JV by National Capital Region (Public Buildings Service) on November 26, 2007.

How much is contract GS11P06MKC0030 worth?

The government has obligated $341,463,642 on GS11P06MKC0030. Its current value, with exercised options, is $345,080,520.

Which agency awarded contract GS11P06MKC0030?

National Capital Region (Public Buildings Service) awarded GS11P06MKC0030, with funding from Office of the Secretary (Department of Commerce).

Was contract GS11P06MKC0030 competed?

The extent of competition for GS11P06MKC0030 was full and open competition. The government received 3 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award