Award of general contractor for the bean site upgrades project at the major general emmett j. Bean federal center, 8899 east 56TH street, indianapolis, in 46249.

Ended Definitive Contract Awarded Last action

Contract number
GS05P15SCC0007
Awardee
Awarding agency
Obligated
$15,010,982

Award facts

Opportunity
Contract value 100% obligated
$15,010,981.74 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2PZ Repair Or Alteration Of Other Non-Building Facilities
Set-aside
No set-aside
Competition
Full and Open Competition · 5 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Indianapolis, IN 46249, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope PS65 · This modification is being issued to finalize multiple change orders and convert SOD to seed for the bean site upgrades project at the major general emmett j.… -$60,373
Supplemental Agreement for work within scope PS64 · This modification is being issued for additional asphalt and concrete work at the main dock, to RE-surface the main loading dock asphalt drive from the security… $139,611
Supplemental Agreement for work within scope PS63 · Contractor shall provide additional temporary fencing to enclose the southeast dock area. In addition, provide a storage container as requested by GSA for use… $3,894
Supplemental Agreement for work within scope PS62 · This modification is being issued to provide and install the subsurface drain piping in the west (phase 1) parking lot for the bean site upgrades project at the… $64,858
Supplemental Agreement for work within scope PS61 · This modification is being issued to provide and install materials and services to RE-surface the truck well drive/ramp leading to the loading dock, repair… $505,205
Supplemental Agreement for work within scope PS59 · This modification is being issued to provide a credit for the booster pump that was no needed for the bean site upgrades project at the major general emmett… -$4,268
Supplemental Agreement for work within scope PS58 · This modification is being issued to provide and install a new light bollard, deleting the stone shoulders along hess, and provide credits for the phase 4… -$39,508
Supplemental Agreement for work within scope PS57 · This modification is being issued to provide "stop" markings on the boschen loop pavement at the south entrance for the bean site upgrades project at the… $2,259
Supplemental Agreement for work within scope PS56 · This modification is being issued to convert the 165 temporary handicap parking spaces in phase 3 back to regular parking spaces for the bean site upgrades… $8,042
Supplemental Agreement for work within scope PS55 · This modification is being issued for the dock area core samples for the bean site upgrades project at the major general emmett j. Bean federal center in… $1,042
Supplemental Agreement for work within scope PS54 · This modification is being issued to seal, surface coat and RE-stripe the phase 1 and phase 2 parking lots only for the bean site upgrades project at the… $105,662
Supplemental Agreement for work within scope PS53 · This modification is being issued to provide revisions to structure e-30 and firm up the price for the south entrance concrete repair for the bean site upgrades… -$13,397
Supplemental Agreement for work within scope PS52 · This modification is being issued for the daycare drive resurfacing, phase 4 stabilization and firms up two previous changes for the bean site upgrades… $261,860
Supplemental Agreement for work within scope PS51 · This modification is being issued to correct modification PS50 for CE5079B and modification PS51 for CE5067A from firm fixed price modifications to not to… $0
Supplemental Agreement for work within scope PS50 · This modification is being issued to repair and coat the concrete at the south entry tunnel for the bean site upgrades project at the major general emmett j.… $46,120
Supplemental Agreement for work within scope PS49 · This modification is being issued to patch/fill/repair all pot holes in the outlot and strip, on saturday, for the bean site upgrades project at the major… $35,588
Supplemental Agreement for work within scope PS48 · This modification is being issued for the additional pedestrian signs on boschen loop, the "reserved" space symbol changes, concrete walkway striping, and the… $31,048
Supplemental Agreement for work within scope PS47 · This modification is being issued for the additional phase 1 water investigation for the bean site upgrades project at the major general emmett j. Bean… $2,612
Supplemental Agreement for work within scope PS46 · This modification is being issued as a credit to GSA for the removal of 12 trees in phase 4 for the bean site upgrades project at the major general emmett j.… -$4,620
Supplemental Agreement for work within scope PS45 · This modification is being issued to undercut areas of soil at the north loop drive and to remove the red OAK (tree #18) along herbert lord road and replace… $14,165
Supplemental Agreement for work within scope PS44 · This modification is being issued to firm up the price for multiple modifications for the bean site upgrades project at the major general emmett j. Bean federal… -$27,649
Supplemental Agreement for work within scope PS43 · This modification is being issued to remove the additional asphalt that has delaminated on the north loop drive for the bean site upgrades project at the… $11,957
Supplemental Agreement for work within scope PS42 · This modification is being issued to replace two benches and two trash receptacles around the north loop drive, the replacement of tree number 88, and to… $17,342
Supplemental Agreement for work within scope PS41 · This modification is being issued for additional phase 3 defective subsoils for the bean site upgrades project at the major general emmett j. Bean federal… $117,101
Supplemental Agreement for work within scope PS40 · This modification is being issued for the removal of the red OAK tree #19 and for the phase 3 handicap parking symbols for the bean site upgrades project at the… $10,220
Supplemental Agreement for work within scope PS38 · This modification is being issued for carmichael drive drainage improvements, speed limit signs, benches and trash cans for the bean site upgrades project at… $60,771
Supplemental Agreement for work within scope PS39 · This modification is being issued for the phase 3 removal of the abandoned underground drain lines and the phase 3 defective subsoils for the bean site upgrades… $172,859
Supplemental Agreement for work within scope PS37 · This modification is being issued for the revisions to the grading around the new bus shelter for the bean site upgrades project at the major general emmett… $7,488
Supplemental Agreement for work within scope PS36 · This modification is being issued for the indygo sign, boschen loop tree substitutions and to finalize the cost for the boschen loop cement stabilization for… $7,457
Supplemental Agreement for work within scope PS35 · This modification is being issued for additional handicapped parking spaces during multiple phases of construction for the bean site upgrades project at the… $1,876
Supplemental Agreement for work within scope PS34 · This modification is being issued for the phase 4 parking lot repairs for the bean site upgrades project at the major general emmett j. Bean federal center in… $14,378
Supplemental Agreement for work within scope PS33 $2,555
Supplemental Agreement for work within scope PS32 · This modification is being issued for the demolition and capping of the F1-F2 conduits and removal of the existing transformer pad for the bean site upgrades… $7,449
Supplemental Agreement for work within scope PS31 · This modification is being issued for partial compensation of the detention basin back-fill for basins 2, 3 and 4 at the bean site upgrades project at the major… $17,712
Supplemental Agreement for work within scope PS30 · This modification is being issued for the roof drain lateral repairs at the bean site upgrades project at the major general emmett j. Bean federal center in… $14,876
Supplemental Agreement for work within scope PS29 · This modification is being issued to firm up the price for overtime hours september through december 2015 for the bean site upgrades project at the major… -$11,989
Supplemental Agreement for work within scope PS28 · This modification is being issued for the phase 2 storm drain system, irrigation water meter, and the basin 2 concrete for the bean site upgrades project at the… $3,417
Supplemental Agreement for work within scope PS27 · This modification is being issued to firm up the price for the additional phase 2 cement stabilization for the bean site upgrades project at the major general… -$2,393
Supplemental Agreement for work within scope PS25 · This modification is being issued for the south plaza soil remediation, the sealing of the south plaza precast seating, additional phase 3 parking lot… $279,672
Supplemental Agreement for work within scope PS26 · This modification is being issued for the out lot parking improvements for the bean site upgrades project in indianapolis, in. $28,259
Supplemental Agreement for work within scope PS24 · This modification is being issued to perform undercuts on carmichael drive and for the phase 2 boschen loop cement stabilization for the bean site upgrades… $69,560
Supplemental Agreement for work within scope PS23 · This modification is being issued to RE-strip handicapped parking symbols in the boschen loop lot for the bean site upgrades project in indianapolis, in. $4,553
Supplemental Agreement for work within scope PS22 · This modification is being issued to provide funding for premium/overtime hours associated with the paving of phase 2 during november and december 2015 for… $10,591
Supplemental Agreement for work within scope PS21 · This modification is being issued to RE-strip the center parking lot due to poor visibility caused by the construction work and to provide a credit to the… -$16,245
Supplemental Agreement for work within scope PS20 · This modification is being issued to provide funding for premium/overtime hours associated with phase 2 to complete a portion of phase 2 parking by the end of… $12,617
Supplemental Agreement for work within scope PS19 · This modification is being issued to enlarge the pipe opening for manhole c-1 from 36" to 48" and to incorporate drawings related to the survey bust for the… $877
Supplemental Agreement for work within scope PS18 · This modification is being issued to perform lime stabilization on designated areas in phase 1 of the project due to high moisture contents in the subsoil for… $63,235
Change Order PC17 · This modification is being issued to DE-obligate money from the general contractor to compensate the architect for completing necessary investigation and design… -$7,927
Supplemental Agreement for work within scope PS16 · This modification is being issued to RE-strip the southwest parking lot due to poor visibility caused by the construction work for the bean site upgrades… $3,098
Supplemental Agreement for work within scope PS15 · This modification is being issued to do additional proof rolling in phase i due to deficient soil conditions for the bean site upgrades project in indianapolis,… $7,000
Show 40 more

Latest 50 listed here. See the rest on GovTribe.

Quick answers

Who was awarded contract GS05P15SCC0007?

GS05P15SCC0007 was awarded to Smoot Construction LLC by Region 5 (Public Buildings Service) on November 19, 2014.

How much is contract GS05P15SCC0007 worth?

The government has obligated $15,010,982 on GS05P15SCC0007.

Was contract GS05P15SCC0007 competed?

The extent of competition for GS05P15SCC0007 was full and open competition. The government received 5 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award