Definitive Contract DTFH7117U00001
Award Date 9/27/17
Potential Completion Date 12/31/18
Potential Value $10K
Federal Agency
Ultimate Awardee
NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Not Available for Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Ashburn, VA 20147, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Not listed National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The Department of Transportation Federal Highway Administration awarded a $4,999,623.29 firm fixed-price contract to Robertson Contractors Inc., a for-profit subchapter S corporation, for the Ozark National Scenic Riverways Project NP-OZAR 10(2) in Carter and Shannon Counties, Missouri. The project consists of replacing the Big Spring Bridge on State Route 103 and rehabilitating the Alley Spring Bridge on Service Road within the Ozark National Scenic Riverways. The work includes constructing a...
- The Department of the Army Corps of Engineers awarded a $4.5 million firm fixed price delivery order to Olgoonik Federal LLC under an unspecified multiple award contract vehicle. The order is for rehabilitation of the Table Rock Lake Roadway Bridge in Branson, Missouri, with work to be performed between August 2020 and December 2021. As the prime, Olgoonik will rehabilitate the bridge for the Corps of Engineers, which owns and operates numerous civil works projects including dams, locks and...
- The Federal Highway Administration awarded a $565.8K firm fixed-price definitive contract to Battle Ridge Builders, LLC for the replacement of a pedestrian trail bridge at Veterans Lake in the Chickasaw National Recreation Area near Sulphur, Oklahoma. The project involves removal of an existing bridge damaged by an April 2024 tornado and installation of a new 130-foot-long, 6-foot-wide prefabricated steel truss bridge with a timber deck. This contract is designated as a Total Small Business...
- The U.S. Army Corps of Engineers, Memphis District, awarded a $1.3 million firm fixed-price definitive contract to Dynamic Wallcovering LLC, doing business as Ozark Constructors, on April 22, 2024, for the Big Slough Levee Culvert Repair project in Jonesboro, Arkansas. The contract represents a time extension for work necessitated by high groundwater conditions and is set aside under the SBA's 8(a) Sole Source program. The project scope includes replacing an existing 28-inch culvert with a...
- The Department of Transportation Federal Highway Administration awarded a $1,510,358.10 firm fixed price definitive contract to Technology Construction Inc. to construct a new prefabricated steel bridge measuring 98 feet long over the Upper Car Wash area on Forest Route 80 in the Tonto National Forest in Apache Junction, Arizona. The contract is set aside for total small businesses and will involve constructing a new 98-foot bridge with a steel grid deck, abutments, wingwalls, and realigning 200...
- The U.S. Department of Transportation Federal Highway Administration awarded a $16,904,107.60 firm fixed price contract to Hamilton Construction Co., a for-profit construction company based in Springfield, Oregon, for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The contract involves the construction of a new 3-span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck, approach embankments, and MSE walls in Augusta, Montana. This infrastructure...
- This is a firm fixed-price delivery order awarded by the U.S. Department of Agriculture Forest Service Region 8 to RCI Construction, a small business, to reconstruct a bridge on the National Forest System Road 28000 over Big Hudson Creek in Arkansas, with a total ceiling value of $519,394. The award is part of a larger Indefinite Delivery Indefinite Quantity (IDIQ) contract vehicle for road construction services in the Ouachita and Ozark-St. Francis National Forests, with a total small...
- The Federal Highway Administration awarded a delivery order modification to WSP USA Inc. on March 25, 2025, to provide design services for Project TN NP GRSM 11(5), which involves replacing the Wiley Oakley Drive Crossover Bridge with a new flyover bridge and associated on and off ramps. This modification adds a new contract line item (CLIN 01102) for Phase XI utility integration work in the amount of $533,459.31. The overall contract ceiling value is $3.84 million, with an ultimate completion...
- The Federal Highway Administration awarded a $19.9 million firm fixed-price contract to Stellar J Corp on April 17, 2023, for the seismic retrofit of three bridges on Oregon State Route 58 between US-97 and I-5, located in Westfir, Oregon. The project's primary objective is to improve structural integrity and earthquake resilience through repair and seismic retrofit work, with an ultimate completion date of December 19, 2025. No set-aside designation was used for this award, allowing full and...
- The U.S. Army Corps of Engineers awarded a definitive contract valued at $23,105,262.61 to Mobley Contractors, Inc. to replace the spillway bridge at Eufaula Lake in Stigler, Oklahoma. The sources sought notice had solicited responses for a total turn-key contract to demolish the existing bridge and construct a new bridge using Ultra High Performance Concrete deck panels. No set-aside was applied to this award to replace the spillway bridge by the May 2023 completion date in accordance with...
OZAR 10(2) BIG SPRING BRIDGE REPLACEMENT
Posted 9/27/17
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 1 | Close Out | $0 | 12/29/20 | |
| Not listed | Not listed | $10.5k | 9/27/17 |