Drill TECH Drilling & Shoring, Inc. was awarded a $9.4 million firm fixed price definitive contract by the National Park Service to improve visitor safety and remediate rock fall hazards at the Paw Paw Tunnel in Chesapeake and Ohio Canal National Historical Park in Hagerstown, Maryland. Under the CHOH 241450 contract, Drill TECH will design and construct repairs to stabilize approximately 1,000 linear feet of rock slopes near the tunnel, remove fallen rock from the canal, and replace a...
This is a firm fixed-price contract awarded by the Federal Highway Administration, a civilian agency, to Espina Stone CO., a minority-owned business, to provide emergency repairs at the Mary S. Rock Tunnel in Shenandoah National Park, Skyline Drive. The contract has a ceiling value of $91,799.00 and an ultimate completion date of May 18, 2020. The contract was awarded on April 22, 2015 and is categorized under the Major Program Code PRA-SHEN 1A13. This contract does not have a set-aside...
Oldcastle SW Group, Inc. was awarded a definitive contract valued at $4,371,025.99 by the United States Department of Transportation Federal Highway Administration to perform reconstruction and resurfacing work along 5.3 miles of the East Portal Access Road in Crawford, Colorado. The solicitation sought bids to pulverize and overlay 5 miles of existing pavement and reconstruct 0.3 miles, including roadway excavation, rock bolting, doweling, aggregate, full depth reclamation, and asphalt concrete...
This is a $364,502.50 firm fixed-price definitive contract awarded by the Federal Highway Administration (FHWA), a civilian agency, to Rock Supremacy LLC, a self-certified small disadvantaged business, for rockfall mitigation work along State Route 123 in Packwood, Washington. The work involves rock and debris removal, anchor and mesh installation, and concrete repair. This contract has a total small business set-aside designation. Rock Supremacy LLC has previous experience performing similar...
This is a definitive contract awarded by the Department of Transportation Federal Highway Administration (FHWA) to Construction Solutions Group, LLC, a small business prime contractor, for a project to stabilize the rock slope along Westbound Spout Run Parkway in Arlington, VA. The $136,958.25 firm fixed price contract includes selective clearing, rock scaling, and other miscellaneous work. This project is part of the GWMP 5(4) initiative and was set aside for small business participation....
This is a firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to Rock Supremacy LLC, a small disadvantaged business, for the Hills Creek Spillway Removal and Removal project in Oakridge, OR. The contract, valued at $3,509,196.00, involves removing rock and vegetation debris from the Hills Creek Dam spillway, installing rock anchors and mesh on the slope above, and repairing any necessary concrete. The contract has a completion date of March 15, 2025 and was awarded on...
This is a firm-fixed-price delivery order awarded by the Federal Highway Administration (FHWA), a civilian agency, to Rocksol Consulting Group, Inc., a minority-owned business, for construction inspection and field office staffing services for the CA ERFO FS LSPDR 2023-1(5) East Camino Cielo project in Lakewood, Colorado. The project work consists of contractor-designed mechanically stabilized earth (MSE) walls, mechanically placed rock embankment, and reinforced soil. The delivery order has a...
Rocksol Consulting Group, Inc. has received a $87,176.64 firm fixed price delivery order from the Department of Transportation's Federal Highway Administration to provide construction inspection services in support of the CA ERFO NP SEKI 2021-1(1) GENERALS HIGHWAY WALL REPAIRS program. As the prime contractor, Rocksol will oversee construction inspection for repairs to highway walls located in Porterville, California, with work expected to be completed by December 31, 2023. This delivery order...
This is a firm fixed-price contract awarded by the Department of the Interior's US Geological Survey Office of Acquisitions and Grants to Harrison Western Construction Corporation, a self-certified small disadvantaged business, for the ASL TUNNEL EXPANSION project. The $318,000.00 contract is for concrete repair services, reinforced concrete overlays, rubber flap installations, and infrastructure rehabilitation to support water delivery and storage operations for the Department of the Interior's...
This $66,054 firm fixed price delivery order was awarded by the Department of the Interior National Park Service Pacific West Region to Dj&A, P.C. for TITLE I AE SERVICES REPAIR AND STABILIZATION OF HISTORIC TUNNEL TWO FOR VISITOR ENJOYMENT. The work will be performed in Boulder City, Nevada, with a period of performance through January 19, 2023. No set-aside designation was applied to this solicitation. Dj&A, P.C. will serve as the prime contractor on this project to repair and...