Definitive Contract DTFH7010C00005
Award Date 12/2/09
Potential Completion Date 7/16/10
Potential Value $376K
Federal Agency
Awardee
Ultimate Awardee
Not listed NAICS Category
PSC Category
Not listed Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Fixed Price with Economic Price Adjustment
Place of Performance
St Regis, MT 59866, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
2
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The United States Department of Agriculture Forest Service, Northern Region awarded a $315,080 firm fixed price delivery order contract to Stone Ridge Construction, Inc. The project is located on Forest Road No. 282 at milepost 10.00 at the crossing of the North Fork of Little Joe Creek in Trout Creek, Montana. Improvements consist of but are not limited to the removal and salvage of the existing multi-plate steel plate arch culvert and concrete structure. The period of performance is from...
- The Department of Transportation Federal Highway Administration awarded a $3.1 million firm fixed price definitive contract to Century Companies, Inc. for resurfacing and road construction services along a 4-mile section of MT Phillips 364(1), known as Short Oil Road, located south of Malta, Montana. The solicitation sought full depth recycling, partial reconstruction, and total reconstruction of the existing 70-year old asphalt pavement. Work will include asphalt removal, subexcavation, borrow,...
- This is a $320,844.00 firm fixed price definitive contract awarded by the Operations Center Intermountain, a civilian agency, to Treasure State Concrete Inc., a Small Disadvantaged Business and HUBZone certified firm. The contract is for the LITTLE BLACKFOOT ROAD MAINTENANCE AND SURFACING - RFCA (ARRA FUNDED) project. It does not have a set-aside designation. The contract was awarded on November 3, 2009 with an ultimate completion date of October 8, 2010. The agency responsible for this contract...
- The Federal Highway Administration awarded a $7.7 million Definitive Contract with Firm Fixed Price to KH Civil Contractors, Inc. on December 8, 2025, for construction services on Project MT FLAP DOT 236(2), Winifred North in Fergus County, Montana. The project involves comprehensive road improvement and rehabilitation work spanning 18.60 miles of gravel road, including subexcavation, roadway reconditioning, aggregate surfacing and stabilization, guardrail installation, cattle guard placement,...
- This federal contract was awarded by the Department of Transportation Federal Highway Administration to the prime contractor Missouri River Contractors, LLC for the rehabilitation of the Many Glacier Road in Montana. The contract is a definitive, firm fixed-price contract with a potential value of $18,452,739.48 and a completion date of November 19, 2021. The work involves road and bridge repairs, including concrete work, electrical installations, asphalt paving, masonry, and traffic control...
- This federal contract, awarded by the Federal Highway Administration (FHWA), a civilian agency, to Century Companies, Inc. (doing business as Century Paving), is for the MT PHILLIPS 201(1), OLD HIGHWAY 2 AND BRIDGE REPLACEMENT project. The $4,476,894.72 firm-fixed-price contract, which has no set-aside designation, involves road construction and rehabilitation work including full depth reclamation, crack sealing, pavement markings, bridge removal and installation, and related services. Key...
- This definitive contract, awarded by the Federal Highway Administration (FHWA) to Monitor Construction Company, Inc. (MCI), a minority-owned, woman-owned small business certified as a HUBZone firm, is for the AZ FLAP NAV FR136(1) Joe Tank Road Construction Project in Show Low, Arizona. The $2,913,046.53 firm fixed-price contract involves roadway excavation, aggregate, asphalt pavement, curb and gutter installation, culvert replacement, and new signage to widen approximately 0.6 miles of Joe Tank...
- The Department of Agriculture Forest Service Northern Region issued a $141,383 firm fixed price delivery order against its Multiple Award Task Order Contract (MATOC) Indefinite Delivery Indefinite Quantity (IDIQ) vehicle to construct the Josephine Creek Allotment Operations Plan (AOP) Culvert Replacement Project. Schlegel Enterprises, Inc. will serve as the prime contractor to complete the culvert replacement by November 15, 2023 in Huson, Montana. No set-aside provisions were applied to this...
- Missouri River Contractors, LLC was awarded a definitive contract valued at $12.8 million by the Federal Highway Administration to perform construction services for the MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation project in West Glacier, Montana. The scope of work includes pavement rehabilitation, construction of three new parking lots, replacement of eight culverts, installation of signage, pavement markings, and pulverizing and paving of the campground loop road system. This...
- This federal contract award to Shumaker Trucking & Excavating Contractors, Inc., a small business based in Great Falls, Montana, is for a $8,635,472.21 firm-fixed-price construction contract to perform roadway reconditioning, aggregate surfacing, aggregate stabilization, subexcavation, and drainage improvements along 50.8 miles of roadway approximately 50 miles southeast of Great Falls. The work is being funded by the Federal Highway Administration and supports the MT DAR MALM 2024(1)...
MT PFH 2009(2) MT STATEWIDE 2009 PAVEMENT PRESERVATION PROJECTS SCH D - LITTLE JOE ROAD
Posted 12/2/09
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
MT PFH 2009(2), MT STATEWIDE 2009 PAVEMENT PRESERVATION PROJECTS | DTFH70-09-B-00014 | Department of Transportation Federal Highway Administration | Award Notice 1/1 | 8/31/09, 5:52 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 4 | Close Out | ($25k) | 12/14/10 | |
| 3 | Supplemental Agreement for work within scope | ($5k) | 7/12/10 | |
| Not listed | Not listed | $406.9k | 12/2/09 |