Definitive Contract DTFH6805C00005
Award Date 10/22/04
Potential Completion Date 8/31/10
Potential Value $114M
Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Not listed Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Boulder City, NV 89006, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This is a $3,533,787.58 definitive contract awarded by the Department of the Interior Bureau of Reclamation to VCI Victor Construction Inc., doing business as Victor Concrete, a small disadvantaged business. The contract is for the construction of pedestrian safety improvements at the top of Hoover Dam, a major infrastructure project located in Boulder City, Nevada. The work includes installing exterior site improvements, steel bollards with cable infill, and an alternate caisson footing...
- This is a $151,495.00 firm-fixed price contract awarded by the U.S. Department of the Interior's Bureau of Reclamation to Arriola Consulting & Inspections LLC, a small disadvantaged business and 8(a) Program participant, for the repair of the lower portal road bridge abutment and slope protection work at the Hoover Dam in Boulder City, Nevada. The contract has a completion date of May 18, 2018. Arriola Consulting & Inspections LLC is a minority-owned small business that has previously...
- This contract was awarded by the Department of the Interior's Bureau of Reclamation to Guardian EC II JV LLC, a minority-owned small business, for the removal and replacement of the existing entry security checkpoint facility located near Hoover Dam in Boulder City, Nevada. The contract has a firm fixed price of $9,031,346.57 and a completion date of May 31, 2024. The project involves the construction of new asphalt lanes and parking, shade structures, a 1,000 square foot employee facility,...
- The U.S. Bureau of Reclamation awarded a $1.21M firm fixed-price definitive contract to Cutting Edge Contractors Inc. (doing business as CE Equipment) on September 17, 2025, to install and commission four new active drop-arm beam barricades at Davis Dam in Bullhead City, Arizona. The project scope includes demolition and replacement of existing in-ground traffic barricades, installation of new traffic barrier systems, restoration of roadway and sidewalk surfaces, and provision of operation and...
- <p>The Department of the Interior Bureau of Reclamation awarded a $478,399.26 firm fixed-price definitive contract to Brown & White Inc., a certified SBA HUBZone and minority-owned small business, for the Memorial Bridge Plaza Handrails project in Boulder City, Nevada. The contract has a completion date of November 21, 2018. As a HUBZone set-aside contract, it supports the Bureau of Reclamation's efforts to promote economic development in historically underutilized business zones.</p>
- The Department of the Interior Bureau of Reclamation awarded a $1,356,325.56 firm fixed price delivery order contract to Site Work Solutions, an SBA-certified HUBZone small business, for the installation of K12 barriers at the Hoover Dam in Arizona-Nevada. This contract was awarded on an 8(a) sole source basis. Site Work Solutions is a general engineering company that holds multiple active federal contracts, including a $15 million indefinite delivery indefinite quantity (IDIQ) contract with the...
- <p>This is a $832,368 firm-fixed-price definitive contract awarded by the Operations Center Intermountain, a civilian federal agency, to C.L. Heilman Company, Inc., a for-profit Subchapter S corporation. The contract is for the rehabilitation of the Hardscrabble Bridge and Silver Creek #1 Bridge, an ARRA (American Recovery and Reinvestment Act) project. The contract has a HUBZone set-aside designation and a period of performance ending on September 30, 2010.</p>
- The Department of the Interior Bureau of Reclamation awarded a $1.21 million firm fixed price contract to CF Padilla LLC to construct a pedestrian bridge as part of the AAO SJCP RIO CHAMA TRAIL project located in Chama, New Mexico. The contract has an 8(a) sole source designation and will be performed between September 2021 and May 2022. As the lead agency for water and power infrastructure, the Bureau of Reclamation is improving access to public lands with this bridge over the Rio Chama River...
- The Federal Highway Administration awarded a $28.2 million firm fixed-price definitive contract to Flatiron Dragados Constructors, Inc. on December 5, 2022, for the CO FLAP US36(1) Downtown Estes Park Loop project in Estes Park, Colorado. The contract encompasses reconstruction and rehabilitation of 2.3 miles of urban streets, including construction of a new bridge at Ivy Street, retaining walls, landscaping, irrigation, sidewalks, and a roundabout to establish a one-way two-lane couplet for...
- The Department of the Interior Bureau of Reclamation awarded a $533,608 firm fixed price contract to Harrison Western Construction Corporation for concrete repair work on the spillway of the East Portal Diversion Dam in Colorado. The solicitation sought proposals to repair concrete and install reinforced concrete overlays and rubber flaps on the spillway, which is part of the Colorado-Big Thompson Project. As a total small business set-aside, the contract responds to a solicitation offering an...
CONSTRUCTION OF HOOVER DAM BYPASS BRIDGE ACROSS THE COLORADO RIVER.
Posted 10/22/04
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| CM034 | Additional Work (new agreement, FAR part 6 applies) | $0 | 8/31/10 | |
| CM032 | Additional Work (new agreement, FAR part 6 applies) | $0 | 8/19/10 | |
| CM033 | Additional Work (new agreement, FAR part 6 applies) | $0 | 7/21/10 | |
| 31 | Additional Work (new agreement, FAR part 6 applies) | $0 | 7/6/10 | |
| CM030 | Additional Work (new agreement, FAR part 6 applies) | $49.8k | 5/20/10 |