The national institute of standards and technology (NIST) in boulder, colorado is currently making significant improvements to its 64-year-old boulder campus including major renovations of building 1,…

Ended Definitive Contract Awarded Last action

Contract number
DOCSB134117CN0025
Awardee
Awarding agency
Obligated
$5,325,345

Award facts

Opportunity
  • SB134117RQ0251 Solicitation number
Contract value 81% obligated
$6,579,869.32 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
8(a) Sole Source
Competition
Not Available for Competition · 1 offer Only One Source
Pricing
Firm Fixed Price
Place of performance
Boulder, CO 80305, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Other Administrative Action P24014 · Administratively extend the period of performance to allow for completion of punchlist items and final invoicing. $0
Other Administrative Action P24013 · Administrative action to extend the POP to allow the contractor to finish the punch list and submit a final invoice. Action is taken to avoid closeout. $0
Supplemental Agreement for work within scope P24012 · B1 wing 1 & 2 utility project no-cost time extension due to excusable delays. $0
Supplemental Agreement for work within scope P20011 · B1 wing 1 & 2 utility project. MOD 0014 (P20011) is to execute a no-cost time extension in exchange for consideration offered by the contractor. $0
Supplemental Agreement for work within scope P20010 · B1 wing 1 & 2 utility project. MOD 0013 is to add revisions to lab 2222 for second cryostat & days due to delay. $6,513
Supplemental Agreement for work within scope P19009 · The contractor shall update the utilities in lab 2222, and rework the utilities in 2058. This modification also reflects some credits for reduction in the… $400,029
Supplemental Agreement for work within scope P19008 · Equitable adjustment for delays $305,199
Supplemental Agreement for work within scope P19007 · Modification to remove existing fume hood in lab 2130 and install a new fume hood. $4,396
Supplemental Agreement for work within scope P19006 · The modification replaces and relocates the pressure relief valve that was identified in the original design documents. The contract is for the utility… $9,592
Supplemental Agreement for work within scope P19005 · This modification provides an equitable adjustment, time and money, due to the government shutdown. This project is to update building 1'S mechanical systems. $28,787
Supplemental Agreement for work within scope P19004 · This modification requires the installation of a pressure valve. This project is to update building 1'S mechanical systems. $37,280
Supplemental Agreement for work within scope P19003 · This modification revises the statement of work to complete bldg. 1 rooms 2128 and 2130 and correct an error from MOD 4. $91,717
Supplemental Agreement for work within scope P19002 · This modification 5 is to formalize a verbal authorization to proceed with work on building 1 - wings 1, 2, and spine heat connections. This contract is for the… $23,422
Supplemental Agreement for work within scope P18001 · This modification is for work within scope for the building 1, wings 1 & 2 utility project at NIST boulder, CO. $211,499
Supplemental Agreement for work within scope 3 · Building 1, wing 1 and 2 renovation. This modification adds security and fire alarm requirements; and incorporates changes to the chilled water process system… $113,065
Supplemental Agreement for work within scope 2 · Project: B1 W1 & 2 utility connectivity from the cup to the labs and lab remodels in building 1, wings 1 & 2. Modification 2 is to add unique connectivity… $14,545
Supplemental Agreement for work within scope 1 · Modification 0001 is to make corrections to the project schedule and to add an additional electrical panel to clin 3005 - option 2 in room 2134. This project is… $8,480
Original award $5,325,345
Show all 18

About this award

The National Institute of Standards and Technology (NIST) awarded a $6.58 million firm fixed price definitive contract to Olgoonik Diversified Services LLC (ODS-CO Division) on July 28, 2017, to support major renovations of Building 1, Wing 3 at the NIST Boulder Campus. The project encompasses comprehensive infrastructure upgrades including disconnection and relocation of electrical and fire alarm conduit, asbestos abatement and demolition in designated office spaces, installation of new chilled water and heating water utility systems, and temporary connections to the Wing 1 temporary chiller pending the permanent Central Utility Plant supply activation. Additional scope includes roof work with parapet construction, integration with building management systems (Maximo and Metasys), and coordination of mechanical, electrical, and plumbing components across the second floor spine. The contract was designated as an 8(a) sole source set-aside.

Olgoonik Diversified Services LLC, an Alaska Native Corporation-owned firm and self-certified small disadvantaged business, was selected for this work based on its extensive experience delivering construction and renovation projects for federal agencies. The ultimate completion date was established as October 30, 2024, with administrative extensions subsequently granted to address punchlist items and final invoicing. NIST's Office of Facilities and Property Management oversaw the project as part of the institute's broader initiative to modernize its 64-year-old Boulder facility through systematic building improvements and infrastructure upgrades.

Description

The national institute of standards and technology (NIST) in boulder, colorado is currently making significant improvements to its 64-year-old boulder campus including major renovations of building 1, wing 3. NIST and the office of facilities and property management (OFPM) requires the contractor to disconnect and temporarily relocate all the electrical and fire alarm conduit; perform asbestos abatement and demolition in specified office spaces; temporarily connect to the wing 1 temporary chiller until the permanent central utility plant (cup) supply is operational in wing 1; and install the new chilled water and heating water utilities in wing 1 unless the domestic cold water pipe has the asbestos abated when the other existing lines are abated; install a code compliant product the roof contractor shall to build the parapet up and roof this into the specified system to keep a consistent look; revise name tags and control drawings to match the revised engineered drawings to reflect the new versions of maximo and metasys before the system is complete and turned over to OFPM; in-stalled and integrated with the new chilled water and heating water system being installed in the second flood spine

Quick answers

Who was awarded contract DOCSB134117CN0025?

DOCSB134117CN0025 was awarded to Olgoonik Diversified Services LLC by National Institute of Standards and Technology (Department of Commerce) on July 28, 2017.

How much is contract DOCSB134117CN0025 worth?

The government has obligated $5,325,345 on DOCSB134117CN0025. Its current value, with exercised options, is $6,579,869.

Was contract DOCSB134117CN0025 competed?

The extent of competition for DOCSB134117CN0025 was not available for competition. The government received 1 offer. It was set aside: 8(a) Sole Source.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award