Definitive Contract AG7442C090035
Award Date 7/8/09
Potential Completion Date 10/19/09
Potential Value $178K
Funding Federal Agency
Not listed Contracting Federal Agency
Awardee
Ultimate Awardee
Not listed NAICS Category
PSC Category
Not listed Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
- Not listed
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Decatur, TX 76234, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
12
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The U.S. Department of Agriculture Natural Resources Conservation Service awarded a $985,360.50 definitive contract to Mann Robinson & Son Inc. for floodwater retarding structure repairs at Hickory Creek Watershed Sites 11 and 14 in Denton County, Texas, on September 24, 2025. The originating solicitation, posted August 5, 2025 and awarded under sealed-bid procedures with evaluation on price to the lowest responsive bidder, called for upstream wave berm repairs and plunge basin erosion...
- The National Resources Conservation Service awarded a $786,845 firm fixed price construction contract to DJ Hansen Construction Corp. to perform remedial dam repair work at Site 23A of the Upper Washita River Watershed in Hemphill County, Texas. The solicitation sought a contractor to excavate an existing foundation drainage system and install a new system, including backfilling of the embankment. With a period of performance of 78 calendar days from notice to proceed, this requirement was set...
- The Department of Agriculture's Natural Resources Conservation Service Central Region awarded a $138,000 firm-fixed-price definitive contract to DJ Hansen Construction Corp. to provide remedial repair services at the Attoyac Bayou Watershed Floodwater Retarding Structure Site No. 21 in Nacogdoches County, Texas. The contract is a total small business set-aside awarded under a competitive solicitation to repair a leak discovered in the reinforced concrete riser. Work will involve dewatering the...
- This is a firm fixed-price definitive contract awarded by the U.S. Department of Agriculture's (USDA) Central Region to Ranger Excavating LP, a for-profit organization, for $931,719.26. The contract is for repairs to slope slides on watershed dams at Upper Brushy Creek Site 29 and Lower Brushy Creek Site 8 in Williamson County, Texas, using lime-treated earthfill on the slopes. The funding for this contract is from the American Recovery and Reinvestment Act (ARRA) under the USDA's major...
- The Office of Surface Mining Reclamation and Enforcement awarded a definitive contract to Double S Dirt Works, Inc. for heavy construction to abate and reclaim abandoned mine hazards at Sallisaw Creek Park in Sequoyah County, Oklahoma on September 5, 2013, under a total small business set-aside. The contract was firm fixed price with a ceiling value of $1,798,000.52. Work was completed and accepted on May 23, 2014, with final contract cost of $1,790,928.96 based on actual quantities determined...
- The U.S. Department of Agriculture's Agricultural Research Service awarded a purchase order to Dallas Harmony Construction LLC on June 23, 2026, for repair work on runoff measurement stations at the Grassland, Soil and Water Research Laboratory in Riesel, Texas, with a ceiling value of $427,995 and completion deadline of May 14, 2027. The procurement carries a Total Small Business Set-Aside. Work includes selective demolition, new concrete construction, and crack sealing across fourteen runoff...
- This is a sole-source, 8(a) set-aside contract awarded by the Department of Energy (DoE) to Bristol Site Contractors, LLC, an Alaskan Native Corporation-owned firm, for the investigation and repair of the low point drain at Randolph, Texas. The firm-fixed-price contract has a ceiling value of $208,158.40 and a completion date of November 15, 2017. Bristol Site Contractors has prior experience performing design, repair, and maintenance work on military fuel infrastructure for the Defense...
- The Department of Agriculture National Resources Conservation Service Central Region awarded a $369,750.95 firm fixed price contract to Ers Inc., a for-profit small business organization, for the remedial repair of the Pine Creek Watershed Site 18 in Lamar County, Texas. The contract, which has a completion date of March 25, 2024, includes reshaping the existing plunge pool, armoring the plunge basin and exit channel with R-150 rock riprap, and constructing new barbed wire fencing around the...
- <p>This is a $1,302,888.55 firm fixed-price definitive contract awarded by the USDA Central Region to Jay Mills Contracting Inc. for repairs to the Chambers Creek Watershed Site 75B. The project is funded through the American Recovery and Reinvestment Act (ARRA). The contract does not have a set-aside designation. The work is to be performed in Waxahachie, Texas, with a completion date of November 12, 2010.</p>
- The Department of the Army awarded a $104.1 million definitive contract to Flatiron Dragados Constructors, Inc. for design-bid-build reinforcement of existing levees from Sabine Pass to Galveston Bay in Port Arthur and vicinity, Jefferson County, Texas, on August 31, 2023, under firm fixed-price pricing with no set-aside. The contract encompasses coastal storm risk management, ecosystem restoration, and hurricane flood protection, including reinforcement work in Zones 5, 6, and 7 with a specific...
REPAIR OF SALT CREEK WATERSHED SITES 8 AND 12, WISE COUNTY, TX
Posted 7/8/09
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Repair Salt Creek Dam Sites 8 and 12 - Bank Stabilization- EWP | AG-7442-S-09-0033 | Department of Agriculture National Resources Conservation Service | Award Notice 1/1 | 5/15/09, 3:54 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 1 | Supplemental Agreement for work within scope | $18.8k | 9/17/09 | |
| Not listed | Not listed | $159.7k | 7/8/09 |